CN202544410U - Assembled type discharging platform - Google Patents

Assembled type discharging platform Download PDF

Info

Publication number
CN202544410U
CN202544410U CN2012203106964U CN201220310696U CN202544410U CN 202544410 U CN202544410 U CN 202544410U CN 2012203106964 U CN2012203106964 U CN 2012203106964U CN 201220310696 U CN201220310696 U CN 201220310696U CN 202544410 U CN202544410 U CN 202544410U
Authority
CN
China
Prior art keywords
discharging platform
beams
secondary beam
clamp
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012203106964U
Other languages
Chinese (zh)
Inventor
冉艺
陈阁琳
于庭伟
王简弘
王武
杨玺
唐健英
董鲜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING FIRST CONSTRUCTION GROUP Co Ltd
Original Assignee
CHONGQING FIRST CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING FIRST CONSTRUCTION GROUP Co Ltd filed Critical CHONGQING FIRST CONSTRUCTION GROUP Co Ltd
Priority to CN2012203106964U priority Critical patent/CN202544410U/en
Application granted granted Critical
Publication of CN202544410U publication Critical patent/CN202544410U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

An assembled type discharging platform comprises a base and a protection guardrail and is characterized in that the base comprises primary beams and secondary beams which are detachable, the number of the primary beams is two, and the number of the secondary beams is at least three. A clamp groove is arranged on the inner side of each primary beam, two ends of each secondary beam are respectively clamped in clamp grooves of two parallel primary beams, each clamp groove is composed of two clamp seats, each clamp seat is in an L shape when overlooked, a support inclined face is arranged on the inner side of each clamp seat, each secondary beam is provided with a wedge block, and the wedge block is meshed with the support inclined face in the clamp groove. The discharging platform is in assembled type design, the protection guardrail is detachable, the primary beams and the secondary beams on the base are in detachable design and can be assembled and disassembled separately, and integral dismounting is avoided. The non-assembled discharging platform is convenient to transport so as to greatly save transportation space. Clamp grooves are positioned between the primary beams and the secondary beams so as to be good in integrity after being connected, free of dislocation and slide and good in safety.

Description

The assembling discharging platform
Technical field
The utility model relates to a kind of building operations facility, is specifically related to the discharging platform that a kind of building operations is used.
Background technology
Discharging platform is widely used in the construction construction of building.On building, build the discharging platform that protrudes from building, be used for the loading and unloading of constructional materials.In the time of need being transported into constructional materials in the building, be discharged on the discharging platform after the constructional materials lifting, by the construction worker constructional materials be transported in the building again through tower crane.Otherwise, in the time of need constructional materials being transported building, by the construction worker constructional materials is transported on the discharging platform earlier, by tower crane the constructional materials lifting is transported building then.
At present, the terrace part of most of discharging platforms is to be welded to form by base and guardrail, and base is often by the integral solder structure of girder and secondary beam.In general, there is overall volume big, installs and transport inconvenience and be difficult to reusable shortcoming.
The utility model content
The purpose of the utility model is to provide a kind of assembling discharging platform, and this discharging platform provides that a kind of security performance is good, installation and removal are convenient, be convenient to transportation, can reusable assembling discharging platform.
For achieving the above object, the technical scheme of the utility model is: a kind of assembling discharging platform comprises base and guard rail; Said base comprises separable girder and secondary beam, and girder has two, and secondary beam has three at least; The girder inboard is provided with draw-in groove, and the two ends of every secondary beam is stuck in the draw-in groove of two girders that are parallel to each other, and said draw-in groove is made up of two decks; Deck is overlooked and is " L " shape; The deck inboard is provided with supporting oblique surface, and said secondary beam is provided with wedge, and the supporting oblique surface in said wedge and the draw-in groove agrees with each other.
When adopting technique scheme, because whole discharging platform is fabricated design, its guard rail is dismountable design, and girder on the base and secondary beam are dismountable connected mode, when installation and removal, can separate dismounting, need not integral demounting.During installation, the design that the inboard inclined-plane of deck tilts makes wedge easily to insert, and clamps wedge.During dismounting, just can easily separately can easily secondary beam be taken out the inclined-plane that cooperatively interacts through reverse active force.Knocked-down discharging platform is convenient to transportation, can practice thrift transport space greatly.The draw-in groove that clamping is arranged between girder and the secondary beam in addition connects the back good integrity, and dislocation and slip can not take place, and safety is good.
Further, in order to increase the intensity of deck, prevent its stress deformation, the said deck outside is fixed with leg-of-mutton boss.Through boss is set, can bear the pressure that deck is out of shape laterally, prevent that deck from producing the effect of deformation laterally thereby play.
Further, in order to reduce the production and processing cost, be convenient to the purchase of material, said girder and secondary beam are respectively channel-section steel or i iron or square steel and process.Above-mentioned all is steel common on the market, can directly buy processing, reduces the cost of production and processing.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation:
Fig. 1 is the structural representation of base among the utility model assembling discharging platform embodiment;
Fig. 2 is main, a secondary beam syndeton sketch map among the utility model assembling discharging platform embodiment.
The specific embodiment
As shown in Figure 1, the utility model assembling discharging platform, chief component are base and guard rail, and guard rail and base adopt the manner of pegging graft to fix.Base mainly is made up of with secondary beam 2 separable girder 1, and girder 1 has two, parallel placement, and secondary beam 2 has three at least, has provided the compound mode of two girders 1 and four secondary beams 2 among Fig. 1.Homonymy at girder 1 has welded four draw-in grooves, and draw-in groove is made up of two decks 3, and overlooking of deck 3 is " L " shape.The two ends of secondary beam 2 is inserted respectively on two girders 1 in the corresponding draw-in groove, makes whole base be stable steel frame construction, is used to support weight.
As shown in Figure 2, the outside of deck 3 is welded with leg-of-mutton boss 4, and there is supporting oblique surface 5 inboard, on secondary beam 2, has welded the wedge 6 that cooperatively interacts with supporting oblique surface 5.During installation,, make wedge 6 can easily insert slot, and under the effect of gravity, clamp each other because the slot that deck 3 inboard supporting oblique surfaces 5 are become is up big and down small.During dismounting, just can easily separately can easily secondary beam 2 be taken out in draw-in groove the inclined-plane that cooperatively interacts through reverse active force.
Above-described only is the preferred implementation of the utility model, should be pointed out that for a person skilled in the art; Under the prerequisite that does not break away from the utility model structure; Can also make some distortion and improvement, for example, girder and secondary beam are respectively channel-section steel or i iron or square steel and process.These also should be regarded as the protection domain of the utility model, and these can not influence effect and practical applicability that the utility model is implemented.

Claims (3)

1. an assembling discharging platform comprises base and guard rail, it is characterized in that, said base comprises separable girder and secondary beam; Girder has two, and secondary beam has three at least, and the girder inboard is provided with draw-in groove; The two ends of every secondary beam is stuck in the draw-in groove of two girders that are parallel to each other, and said draw-in groove is made up of two decks, and deck is overlooked and is " L " shape; The deck inboard is provided with supporting oblique surface, and said secondary beam is provided with wedge, and the supporting oblique surface in said wedge and the draw-in groove agrees with each other.
2. assembling discharging platform as claimed in claim 1 is characterized in that, the said deck outside is fixed with leg-of-mutton boss.
3. according to claim 1 or claim 2 assembling discharging platform is characterized in that said girder and secondary beam are respectively channel-section steel or i iron or square steel and process.
CN2012203106964U 2012-06-29 2012-06-29 Assembled type discharging platform Expired - Lifetime CN202544410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012203106964U CN202544410U (en) 2012-06-29 2012-06-29 Assembled type discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012203106964U CN202544410U (en) 2012-06-29 2012-06-29 Assembled type discharging platform

Publications (1)

Publication Number Publication Date
CN202544410U true CN202544410U (en) 2012-11-21

Family

ID=47165062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012203106964U Expired - Lifetime CN202544410U (en) 2012-06-29 2012-06-29 Assembled type discharging platform

Country Status (1)

Country Link
CN (1) CN202544410U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760451A (en) * 2016-11-21 2017-05-31 成都建筑工程集团总公司 The combination constructing method thereof that the collapsible operation of assembled architecture construction and discharging platform are lifted with tool type stairs
CN108817788A (en) * 2018-06-07 2018-11-16 中铁二局第工程有限公司 A kind of I-steel welding platform and its application method
CN109693536A (en) * 2017-10-20 2019-04-30 郑州宇通客车股份有限公司 Protective device of fuel tank and the vehicle for using the device
CN110924319A (en) * 2019-12-31 2020-03-27 中铁大桥局武汉桥梁特种技术有限公司 Isolation protection shed frame and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760451A (en) * 2016-11-21 2017-05-31 成都建筑工程集团总公司 The combination constructing method thereof that the collapsible operation of assembled architecture construction and discharging platform are lifted with tool type stairs
CN106760451B (en) * 2016-11-21 2019-03-26 成都建工集团有限公司 Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof
CN109693536A (en) * 2017-10-20 2019-04-30 郑州宇通客车股份有限公司 Protective device of fuel tank and the vehicle for using the device
CN109693536B (en) * 2017-10-20 2024-02-09 宇通客车股份有限公司 Oil tank protection device and vehicle using same
CN108817788A (en) * 2018-06-07 2018-11-16 中铁二局第工程有限公司 A kind of I-steel welding platform and its application method
CN110924319A (en) * 2019-12-31 2020-03-27 中铁大桥局武汉桥梁特种技术有限公司 Isolation protection shed frame and construction method

Similar Documents

Publication Publication Date Title
US8632286B2 (en) Transportation unit for a wind turbine rotor blade
CN202544410U (en) Assembled type discharging platform
CN207348461U (en) Aluminum alloy mould plate morning form removal support system
CN103053045A (en) Battery rack
CN204775829U (en) A protect apart from roof beam for container ship transverse bulkhead carries on fast
CN102061812A (en) Method for reinforcing wood beam by adhering steel plate
CN201351360Y (en) High-rise building construction assembly unloading platform
CN101718144B (en) Hollow section frame template and connecting device thereof
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
KR101516296B1 (en) Turnover jig for block
CN209683710U (en) The forced locking device of railway vehicle bogie frame
CN208122340U (en) Detachable and recyclable discharging platform
CN214939325U (en) Pin-connected panel load-bearing platform is used in steel case roof beam construction
CN102953456A (en) Light finished product partition wall
CN202831595U (en) Standardized combination type Platform for aerial work
CN205000659U (en) Discharging platform
CN110805308B (en) Method for installing and dismantling temporary support at top center of silo
CN211114898U (en) Detachable platform of unloading
CN217349039U (en) Multipurpose assembly type component storage rack
CN211766181U (en) Support structure convenient for debugging fin stabilizer
US9146183B2 (en) Self-aligning test weight
CN220245214U (en) Elevator furred ceiling mounting structure
CN205474830U (en) Portable portable overhauls platform in succession
CN214560737U (en) Combined steel partition bin
CN210364965U (en) Novel timber transport means

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121121

CX01 Expiry of patent term