CN202542770U - Tube joint turning over device of pressure steel tube in hole chamber - Google Patents

Tube joint turning over device of pressure steel tube in hole chamber Download PDF

Info

Publication number
CN202542770U
CN202542770U CN2012201891349U CN201220189134U CN202542770U CN 202542770 U CN202542770 U CN 202542770U CN 2012201891349 U CN2012201891349 U CN 2012201891349U CN 201220189134 U CN201220189134 U CN 201220189134U CN 202542770 U CN202542770 U CN 202542770U
Authority
CN
China
Prior art keywords
tube
pressure steel
hole chamber
tube coupling
tube joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201891349U
Other languages
Chinese (zh)
Inventor
李友华
尹志鹏
万勇
唐明酉
陈宇
胡昌富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2012201891349U priority Critical patent/CN202542770U/en
Application granted granted Critical
Publication of CN202542770U publication Critical patent/CN202542770U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a tube joint turning over device of a pressure steel tube in a hole chamber. The tube joint turning over device comprises four roof anchors which are arranged at the top part of the hole chamber, wherein each roof anchor is provided with a pulley, the outer side of each roof anchor on the ground surface of the hole chamber is correspondingly provided with a winch, a steel wire rope of the winch passes through the pulley on the corresponding roof anchor and is connected with a corresponding suspending lug on a tube joint of the pressure steel tube through a suspending hook, the ground surface of the hole chamber is also provided with a steel rail, the steel rail is provided with a transportation trolley, and two roof anchors at the left side are aligned to the central line of the steel rail. According to the tube joint turning over device of the pressure steel tube in the hole chamber, disclosed by the utility model, and through the structure, the over turning and the vertical erecting of the tube joint of the pressure steel tube in the air can be realized, and the transportation and the installation can be realized by suspending the tube joint of the pressure steel tube on the transportation trolley. The tube joint turning over device disclosed by the utility model has the advantages that the structure is simple, the construction method is simple and convenient, the difficult problem of the over turning of the steel joint of a large-scale pressure steel tube in the hole chamber is solved, and the construction progress of the whole engineering is increased.

Description

Cavern's internal pressure steel pipe tube coupling equipment for supporting patient with burn
Technical field
The utility model relates to a kind of penstock tube coupling feedway, particularly a kind of large-scale cavern internal pressure steel pipe tube coupling equipment for supporting patient with burn that is applicable to.
Background technology
In the cavern, carry out in the installation of penstock tube coupling, the penstock tube coupling is installed and the interference of main building construction in order to solve, and adopts in pressure pipeline is constructed a hole and transports the mode of installing; But restricted by the place; After large-scale penstock tube coupling lies against ground, can't stand up fast and stand up, the normal transhipment of influence is in place; Cause steel pipe installation speed slow, influence the engineering construction progress.
Summary of the invention
The utility model technical matters to be solved provides a kind of cavern internal pressure steel pipe tube coupling equipment for supporting patient with burn, can realize conveniently that large-scale penstock tube coupling stands up setting aloft, and then accomplishes transhipment and install.
For solving the problems of the technologies described above; The technical scheme that the utility model adopted is: a kind of cavern internal pressure steel pipe tube coupling equipment for supporting patient with burn; Be located at day anchor everywhere at top, cavern, every place sky anchor is provided with pulley, and the outside of day anchor correspondingly is provided with winch everywhere on ground, cavern; The steel rope of winch is walked around the pulley on the corresponding day anchor, through on suspension hook and the penstock tube coupling accordingly hanger be connected;
Ground, cavern also is provided with rail, and the transportation chassis is installed on the rail.
Two sky anchors in left side align with the line of centers of rail.
A kind of cavern internal pressure steel pipe tube coupling equipment for supporting patient with burn that the utility model provides through adopting above-mentioned structure, realizes that the penstock tube coupling stands up setting aloft, then the penstock tube coupling is hung onto on the transportation chassis, realizes the transhipment installation.The utility model is simple in structure, construction method is easy, has solved the difficult problem that large-scale penstock tube coupling stands up in the cavern, has improved whole engineering construction progress.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further:
Fig. 1 is the schematic top plan view of the utility model.
Fig. 2 becomes the scheme drawing of horizontality for the utility model lifting penstock tube coupling.
Fig. 3 becomes the scheme drawing of heeling condition for the utility model lifting penstock tube coupling.
Fig. 4 becomes the scheme drawing of vertical state for the utility model lifting penstock tube coupling.
Among the figure: day anchor 1, pulley 2, winch 3, penstock tube coupling 4, suspension hook 5, transportation chassis 6, rail 7, hanger 8.
The specific embodiment
In Fig. 1, Fig. 2; A kind of cavern internal pressure steel pipe tube coupling equipment for supporting patient with burn; Be located at day anchor 1 everywhere at top, cavern, every place sky anchor 1 is provided with pulley 2, and the outside of day anchor 1 correspondingly is provided with winch 3 everywhere on ground, cavern; The steel rope of winch 3 is walked around the pulley 2 on the corresponding day anchor 1, through on suspension hook 5 and the penstock tube coupling 4 accordingly hanger 8 be connected;
In Fig. 1, Fig. 4, ground, cavern also is provided with rail 7, and transportation chassis 6 is installed on the rail 7.
Two sky anchors 1 in left side align with the line of centers of rail 7.
As shown in Figure 1; Select correct position that steel pipe tube coupling 4 is set in installation and transportation circuit end and stand up the place; Size is confirmed according to the size of penstock tube coupling 4; Left and right side is arranged two groups of winchs 3 respectively, and the top is provided with 4 sky anchors 1, and the builder's tonnage of day anchor 1 and winch 3 is confirmed by penstock tube coupling 4 maximum single-unit weight.It anchor 1 is made up of many anchor poles; Sky anchor 1 position of left group aligns with the line of centers of transportation rail 7; Hanger 8 spacings on the top in the spacing of sky between the anchor 1 of left group and the steel pipe tube coupling 4 are consistent, and the position of right group sky anchor 1 is definite by the position of the hanger of the bottom in the steel pipe tube coupling 4.Leading sheave is welded on day anchor, and hoisting system is through leading sheave traction suspension hook.
Left side described herein is identical with the left side among Fig. 1, the hanger on described top be meant be arranged in after penstock tube coupling 4 upset Fig. 2-4 top hanger.
Like Fig. 2, Fig. 3, shown in Figure 4; The suspension hook 5 of left side winch 3 is hung the hanger 8 on the top of penstock tube coupling 4; Hang the hanger of penstock tube coupling 4 bottoms simultaneously with the suspension hook 5 of right side winch 3,, with left side winch 3 suspension hook is slowly hoisted then the penstock tube coupling 4 flat certain altitudes that hang; Right side winch 3 slowly descends suspension hook; Penstock tube coupling 4 is stood up setting aloft, again penstock tube coupling 4 is hung onto on the transportation chassis 6 in place, be transported to design attitude through rail 7 and install.

Claims (2)

1. cavern's internal pressure steel pipe tube coupling equipment for supporting patient with burn; It is characterized in that: day anchor (1) everywhere of being located at the top, cavern; Every place sky anchor (1) is provided with pulley (2); The outside of day anchor (1) correspondingly is provided with winch (3) everywhere on ground, cavern, and the steel rope of winch (3) is walked around the pulley (2) on the corresponding sky anchor (1), goes up corresponding hanger (8) through suspension hook (5) and penstock tube coupling (4) and is connected;
Ground, cavern also is provided with rail (7), and transportation chassis (6) is installed on the rail (7).
2. a kind of cavern according to claim 1 internal pressure steel pipe tube coupling equipment for supporting patient with burn, it is characterized in that: two sky anchors (1) in left side align with the line of centers of rail (7).
CN2012201891349U 2012-04-28 2012-04-28 Tube joint turning over device of pressure steel tube in hole chamber Expired - Fee Related CN202542770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201891349U CN202542770U (en) 2012-04-28 2012-04-28 Tube joint turning over device of pressure steel tube in hole chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201891349U CN202542770U (en) 2012-04-28 2012-04-28 Tube joint turning over device of pressure steel tube in hole chamber

Publications (1)

Publication Number Publication Date
CN202542770U true CN202542770U (en) 2012-11-21

Family

ID=47163436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201891349U Expired - Fee Related CN202542770U (en) 2012-04-28 2012-04-28 Tube joint turning over device of pressure steel tube in hole chamber

Country Status (1)

Country Link
CN (1) CN202542770U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103047478A (en) * 2013-01-21 2013-04-17 葛洲坝集团第二工程有限公司 In-hole sectioning installation method for penstocks with overlarge diameters
CN104071720A (en) * 2014-07-01 2014-10-01 葛洲坝集团第二工程有限公司 In-tunnel turn-over method of super-large diameter penstock
CN106957007A (en) * 2017-04-24 2017-07-18 中国葛洲坝集团第工程有限公司 A kind of super-large diameter penstock equipment for supporting patient with burn and turn-over method
CN110593906A (en) * 2019-09-30 2019-12-20 中交第二航务工程局有限公司 Horizontal splicing vertical rotation combined construction system and method for circular strip steel lining tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103047478A (en) * 2013-01-21 2013-04-17 葛洲坝集团第二工程有限公司 In-hole sectioning installation method for penstocks with overlarge diameters
CN103047478B (en) * 2013-01-21 2015-05-20 葛洲坝集团第二工程有限公司 In-hole sectioning installation method for penstocks with overlarge diameters
CN104071720A (en) * 2014-07-01 2014-10-01 葛洲坝集团第二工程有限公司 In-tunnel turn-over method of super-large diameter penstock
CN106957007A (en) * 2017-04-24 2017-07-18 中国葛洲坝集团第工程有限公司 A kind of super-large diameter penstock equipment for supporting patient with burn and turn-over method
CN110593906A (en) * 2019-09-30 2019-12-20 中交第二航务工程局有限公司 Horizontal splicing vertical rotation combined construction system and method for circular strip steel lining tunnel

Similar Documents

Publication Publication Date Title
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN101434366B (en) Hoisting tool and hoisting method for column component
CN104480930B (en) A kind of filling pile cage of reinforcement hangs fixing construction method
CN204917742U (en) Portable portal crane is used in piping erection
CN202542770U (en) Tube joint turning over device of pressure steel tube in hole chamber
CN204899238U (en) Unitized curtain wall plate hoist device
CN103556627A (en) Cage hanging structure for hoisting large-diameter hole drilling filling pile steel bar cage
CN205397854U (en) Gasifier hoist and mount hoisting device
CN205077878U (en) Unit type curtain plate hoisting device
CN204456109U (en) A kind of steel pipe pile lifting piling construction tackling system
CN103938653B (en) Lifting steel pipes method in the construction of hole stake method steel pipe column
CN203625889U (en) Hanging cage structure for large-diameter hole drilling cast pile reinforcement cage hanging
CN202897779U (en) Pulley wheel type self-balancing hoisting device
CN201713229U (en) Steel box girder cable-loaded crane for suspension bridge construction
CN203474231U (en) Steel bar tower safety hoisting device
CN103206852A (en) Installation method for rotary kiln for large-sized cement production line
CN103183283B (en) System and method for installing lifting rigging
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN105645275A (en) Cable hoisting crane and construction method thereof
CN203079582U (en) Novel suspension type suspender
CN202785255U (en) Turnover hoisting tool for reinforced concrete pipe joint
CN112722734B (en) Method for transporting heavy steel pipes with large calibers in pipe gallery
CN203187370U (en) Inner mast hoisting device
CN103058083B (en) Bolt sphere truss gig
CN101845914B (en) Installation method of three-tube steel chimney

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20200428