CN202531963U CN2012200905113U CN201220090511U CN202531963U CN 202531963 U CN202531963 U CN 202531963U CN 2012200905113 U CN2012200905113 U CN 2012200905113U CN 201220090511 U CN201220090511 U CN 201220090511U CN 202531963 U CN202531963 U CN 202531963U
Authority
CN
China
Prior art keywords
valve
auxiliary reclay
solenoid valve
emptying
normally opened
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200905113U
Other languages
Chinese (zh)
Inventor
陆宏泳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN2012200905113U priority Critical patent/CN202531963U/en
Application granted granted Critical
Publication of CN202531963U publication Critical patent/CN202531963U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Magnetically Actuated Valves (AREA)

Abstract

The utility model provides a novel gas cut-off system capable of detecting leakage on line. The novel gas cut-off system comprises a gaspipe network and a gas pipeline among users, as well as an electric butterfly valve, an analyzing and sampling valve, a blow-down valve, a pressure switch and an electric spectacle valve which are sequentially arranged on the gas pipeline in the gas running direction, and the novel gas cut-off system further comprises a by-pass electromagnetic valve and an emptying electromagnetic valve, wherein the by-pass electromagnetic valve is connected in parallel with the air passage of the electric butterfly valve through a pipeline, one end of the emptying electromagnetic valve is connected with a pipeline between the electric butterfly valve and the analyzing and sampling valve through a pipeline, and the other end of the emptying electromagnetic valve is communicated with the atmosphere; and the pressure switch, the by-pass electromagnetic valve and the emptying electromagnetic valve are all controlled through a programmable logic controller. After the use of the novel gas cut-off system provided by the utility model, when the gas cut-off system cuts off, internal leakage and external leakage of the gas cut-off system can be accurately detected, the defect that a traditional gas cut-off system is incapable of on-line detection and leakage judgment can be overcome effectively, and active effects on reducing the incidence of safety accidents in metallurgical enterprises and improving the production efficiency are taken.

Description

The novel gas that the online detection of a kind of ability is leaked cuts off system
Technical field
The utility model relates to the gas cutting system electrical instrument control in the metallurgy industry gaspipe network, the gas cutting system of especially can online detection leaking.
Background technique
Its gas entry of the equipment that the coal gas user maybe need overhaul must be provided with the gas cutting system; When in case the coal gas user stops using coal gas or equipment need stop the supple of gas or steam maintenance; The gas cutting system is with gas cutting; Gas pipe line or the coal gas in the equipment to the gas cutting system downstream purge displacement with pressurized air or nitrogen, make the downstream of gas cutting system no longer include coal gas.In order to check whether the gas cutting system occurs leaking; Traditional way is that an analytical sampling valve is installed on the pipeline between electric butterfly valve and the electronic glasses valve; Through the manual regular field sampling, deliver to the analyzer room and analyze, judge whether the gas cutting system occurs leaking.Therefore, there are three shortcomings, first in traditional gas cutting system; Can not judge gas cutting system (electronic glasses valve) to external leakage, the second, detect and judge that gas cutting system (electric butterfly valve) internal leakage is untimely; The 3rd, working strength of workers is big, and manufacturing efficiency is low.In case the gas cutting system occurs leaking and can not in time check out, will cause staff's gas poisoning in gas leakage zone, even can cause the explosion of fire damp accident.
The model utility content
The technical problem that the utility model will solve is: provide a kind of ability novel gas that online detection is leaked to cut off system, the Security that can effectively improve the gas cutting system.
The utility model is to solve the problems of the technologies described above the technological scheme of being taked to be: it comprises the gas pipe line between gaspipe network and the coal gas user; And the electric butterfly valve XV11 that on gas pipe line, sets gradually, analytical sampling valve HV01, blow down valve HV02, pressure switch PI01 and electronic glasses valve XV21 by the flow of gas direction; Also comprise bypass solenoid valve SV02 and emptying solenoid valve SV01; Wherein bypass solenoid valve SV02 is parallelly connected with electric butterfly valve XV11 gas circuit through pipeline; Emptying solenoid valve SV01 one end is connected on the pipeline between electric butterfly valve XV11 and the analytical sampling valve HV01 through pipeline, and the other end is communicated with atmosphere; Pressure switch PI01, bypass solenoid valve SV02 and emptying solenoid valve SV01 control through relay by programmable logic controller (PLC) PLC.
Press such scheme, described relay comprises that emptying electromagnetic valve switch valve auxiliary reclay K01, bypass solenoid valve switch valve auxiliary reclay K02, electric butterfly valve close the auxiliary reclay K14 that puts in place, electronic glasses valve closes put in place relay K 05 and the low auxiliary reclay K06 of pressure between auxiliary reclay K24, pressure senior middle school; It comprises that also emptying solenoid valve pass valve button SA01, emptying valve opening solenoid valve button SA03, bypass solenoid valve close valve button SA02, bypass solenoid valve is opened valve button SA04;
The normally opened contact K01-1 of power supply, emptying electromagnetic valve switch valve auxiliary reclay K01 and emptying electromagnetic valve coil constitute the loop; The normally opened contact K02-1 of power supply, bypass solenoid valve switch valve auxiliary reclay K02 and bypass solenoid valve coil constitute the loop;
The emptying solenoid valve leaks the other loop of detecting of machine and closes normally opened contact K24-1, emptying solenoid valve that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place by power supply, electric butterfly valve and close valve button SA01, emptying valve opening solenoid valve button SA03, the normally-closed contact K02-2 of bypass solenoid valve switch valve auxiliary reclay K02, the coil of emptying electromagnetic valve switch valve auxiliary reclay K01 and constitute, and the normally opened contact K01-3 of emptying electromagnetic valve switch valve auxiliary reclay K01 is parallelly connected with emptying valve opening solenoid valve button SA03;
Bypass solenoid valve leaks the other loop of detecting of machine and closes normally opened contact K24-1, bypass solenoid valve that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place by power supply, electric butterfly valve and close that valve button SA02, bypass solenoid valve leave the normally-closed contact K01-2 of valve button SA04, emptying electromagnetic valve switch valve auxiliary reclay K01, the coil of bypass solenoid valve switch valve auxiliary reclay K02 constitutes, and it is parallelly connected that the normally opened contact K02-3 of bypass solenoid valve switch valve auxiliary reclay K02 and bypass solenoid valve are opened valve button SA04;
Power supply, electric butterfly valve close that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the coil of relay K 05 between the normally opened contact K24-1, pressure senior middle school of the auxiliary reclay K24 that puts in place, the high contact of pressure of pressure switch PI01 constitutes the loop; Power supply, electric butterfly valve close the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve closes the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the formation loop, the low contact of coil, pressure switch PI01 pressure that pressure hangs down auxiliary reclay K06;
Electric butterfly valve closes that the normally opened contact K14-2 of auxiliary reclay K14 that puts in place, electronic glasses valve close the normally opened contact K05-2 of relay K 05 between the normally opened contact K02-7, pressure senior middle school of normally opened contact K01-7, the bypass solenoid valve switch valve auxiliary reclay K02 of normally opened contact K24-2, the emptying electromagnetic valve switch valve auxiliary reclay K01 of the auxiliary reclay K24 that puts in place, the normally opened contact K06-2 of the low auxiliary reclay K06 of pressure is connected with the DI module of PLC control system respectively.
Press such scheme, it also comprises the other automatic change-over S01 of Leak testtion machine, emptying solenoid valve automatic switch valve auxiliary reclay K03 and bypass solenoid valve automatic switch valve auxiliary reclay K04;
The coil of emptying solenoid valve automatic switch valve auxiliary reclay K03, the coil of bypass solenoid valve automatic switch valve auxiliary reclay K04 are connected with the DO module of PLC control system;
The other position of the machine of the other automatic change-over S01 of Leak testtion machine is series at respectively in other Leak testtion loop of said emptying solenoid valve machine and the other Leak testtion of the bypass solenoid valve machine loop;
The online detection of emptying solenoid valve is leaked the loop and is closed the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve by power supply, electric butterfly valve and close the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the automated location of the other automatic change-over S01 of Leak testtion machine, the normally opened contact K03-1 of emptying electromagnetic valve switch valve auxiliary reclay K03, the normally-closed contact K02-2 of bypass solenoid valve switch valve auxiliary reclay K02, the coil of emptying electromagnetic valve switch valve auxiliary reclay K01 and constitute;
The online detection of bypass solenoid valve is leaked the loop and is closed the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve by power supply, electric butterfly valve and close the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the automated location of the other automatic change-over S01 of Leak testtion machine, the normally opened contact K04-1 of bypass solenoid valve switch valve auxiliary reclay K04, the normally-closed contact K01-2 of emptying electromagnetic valve switch valve auxiliary reclay K01, the coil of bypass solenoid valve switch valve auxiliary reclay K02 and constitute.
Press such scheme; It also comprises the Leak testtion indicator light circuit; The Leak testtion indicator light circuit closes normally opened contact K24-1 and 6 tutorial light branch roads that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place power supply, electric butterfly valve and is formed by connecting, wherein
The normally opened contact K01-4 that first tutorial light props up route emptying electromagnetic valve switch valve auxiliary reclay K01 formation of connecting with emptying valve opening solenoid valve tutorial light SA03;
The normally-closed contact K01-5 that second tutorial light props up route emptying electromagnetic valve switch valve auxiliary reclay K01 and emptying solenoid valve close the valve tutorial light SA01 formation of connecting;
The normally opened contact K02-4 that the 3rd tutorial light props up route electromagnetic valve switch valve auxiliary reclay K02 and bypass solenoid valve are opened the valve tutorial light SA04 formation of connecting;
The normally-closed contact K02-5 that the 4th tutorial light props up route electromagnetic valve switch valve auxiliary reclay K02 and bypass solenoid valve close the valve tutorial light SA02 formation of connecting;
The 5th tutorial light props up between the normally-closed contact K02-6, pressure senior middle school of normally-closed contact K01-6, the bypass solenoid valve switch valve auxiliary reclay K02 of route emptying electromagnetic valve switch valve auxiliary reclay K01 electric butterfly valve leak detection position, the electric butterfly valve of the electronic glasses valve leak detection of normally opened contact K05-1, the electric butterfly valve throw over switch S02 of relay K 05 and leaks tutorial light LA01 series connection and constitute;
Electronic glasses valve leak detection position, the electronic glasses valve of the electronic glasses valve leak detection of normally opened contact K06-1, electric butterfly valve throw over switch S02 that the 6th tutorial light props up normally-closed contact K02-6, the low auxiliary reclay K06 of pressure of normally-closed contact K01-6, the bypass solenoid valve switch valve auxiliary reclay K02 of route emptying electromagnetic valve switch valve auxiliary reclay K01 leaks tutorial light LA02 series connection and constitutes.
The beneficial effect of the utility model is:
When 1, utilizing the utility model to cut off in the gas cutting system, online detection and judgement are carried out in the leakage of electric butterfly valve and electronic glasses valve, had and install simple and conveniently, operational reliability is high, detects advantages such as accuracy of judgement is timely.
2, in testing process, can accurately detect internal leakage (electric butterfly valve leakage) and the external leaks (electronic glasses valve leakage) of judging the gas cutting system.
3, having solved traditional gas cutting system effectively can not online detection and judge the shortcoming of leaking, and smelter is reduced the security incident incidence rate can play positive role with boosting productivity.
4, reduce investment outlay; Need not to increase too many equipment; In traditional gas cutting system, only need to increase a pressure switch, an emptying solenoid valve, a bypass solenoid valve and the other operating box of machine and just can realize that novel gas cuts off the generation that system can reduce labor strength and stop security incident.
Description of drawings
Fig. 1 is a gas circuit connection diagram of the present invention.
Fig. 2 is the circuit connection diagram of one embodiment of the invention.
Fig. 3 is the PLC control signal connection diagram of one embodiment of the invention.
Embodiment
Fig. 1 is a gas circuit connection diagram of the present invention; Comprise the gas pipe line between gaspipe network and the coal gas user; And the electric butterfly valve XV11 that on gas pipe line, sets gradually, analytical sampling valve HV01, blow down valve HV02, pressure switch PI01 and electronic glasses valve XV21 by the flow of gas direction; Also comprise bypass solenoid valve SV02 and emptying solenoid valve SV01; Wherein bypass solenoid valve SV02 is parallelly connected with electric butterfly valve XV11 gas circuit through pipeline, and emptying solenoid valve SV01 one end is connected on the pipeline between electric butterfly valve XV11 and the analytical sampling valve HV01 through pipeline, and the other end is communicated with atmosphere.
Like Fig. 2, shown in Figure 3, pressure switch PI01, bypass solenoid valve SV02 and emptying solenoid valve SV01 control through relay by programmable logic controller (PLC) PLC.The normally opened contact K01-1 of power supply, emptying electromagnetic valve switch valve auxiliary reclay K01 and emptying electromagnetic valve coil constitute the loop; The normally opened contact K02-1 of power supply, bypass solenoid valve switch valve auxiliary reclay K02 and bypass solenoid valve coil constitute the loop.
The other Leak testtion of emptying solenoid valve machine loop is closed normally opened contact K24-1, emptying solenoid valve that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place by power supply, electric butterfly valve and is closed valve button SA01, emptying valve opening solenoid valve button SA03, the normally-closed contact K02-2 of bypass solenoid valve switch valve auxiliary reclay K02, the coil of emptying electromagnetic valve switch valve auxiliary reclay K01 and constitute, and the normally opened contact K01-3 of emptying electromagnetic valve switch valve auxiliary reclay K01 is parallelly connected with emptying valve opening solenoid valve button SA03.
The other Leak testtion of bypass solenoid valve machine loop is closed normally opened contact K24-1, bypass solenoid valve that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place by power supply, electric butterfly valve and is closed that valve button SA02, bypass solenoid valve leave the normally-closed contact K01-2 of valve button SA04, emptying electromagnetic valve switch valve auxiliary reclay K01, the coil of bypass solenoid valve switch valve auxiliary reclay K02 constitutes, and it is parallelly connected that the normally opened contact K02-3 of bypass solenoid valve switch valve auxiliary reclay K02 and bypass solenoid valve are opened valve button SA04.
Power supply, electric butterfly valve close that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the coil of relay K 05 between the normally opened contact K24-1, pressure senior middle school of the auxiliary reclay K24 that puts in place, the high contact of pressure of pressure switch PI01 constitutes the loop; Power supply, electric butterfly valve close the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve closes the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the formation loop, the low contact of coil, pressure switch PI01 pressure that pressure hangs down auxiliary reclay K06.
Electric butterfly valve closes that the normally opened contact K14-2 of auxiliary reclay K14 that puts in place, electronic glasses valve close the normally opened contact K05-2 of relay K 05 between the normally opened contact K02-7, pressure senior middle school of normally opened contact K01-7, the bypass solenoid valve switch valve auxiliary reclay K02 of normally opened contact K24-2, the emptying electromagnetic valve switch valve auxiliary reclay K01 of the auxiliary reclay K24 that puts in place, the normally opened contact K06-2 of the low auxiliary reclay K06 of pressure is connected with the DI module of PLC control system respectively.
The coil of emptying solenoid valve automatic switch valve auxiliary reclay K03, the coil of bypass solenoid valve automatic switch valve auxiliary reclay K04 are connected with the DO module of PLC control system.
The other position of the machine of the other automatic change-over S01 of Leak testtion machine is series at respectively in other Leak testtion loop of said emptying solenoid valve machine and the other Leak testtion of the bypass solenoid valve machine loop.
The online Leak testtion of emptying solenoid valve loop is closed the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve by power supply, electric butterfly valve and is closed the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the automated location of the other automatic change-over S01 of Leak testtion machine, the normally opened contact K03-1 of emptying electromagnetic valve switch valve auxiliary reclay K03, the normally-closed contact K02-2 of bypass solenoid valve switch valve auxiliary reclay K02, the coil of emptying electromagnetic valve switch valve auxiliary reclay K01 and constitute.
The online Leak testtion of bypass solenoid valve loop is closed the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve by power supply, electric butterfly valve and is closed the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the automated location of the other automatic change-over S01 of Leak testtion machine, the normally opened contact K04-1 of bypass solenoid valve switch valve auxiliary reclay K04, the normally-closed contact K01-2 of emptying electromagnetic valve switch valve auxiliary reclay K01, the coil of bypass solenoid valve switch valve auxiliary reclay K02 and constitute.
The Leak testtion indicator light circuit closes normally opened contact K24-1 and 6 tutorial light branch roads that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place power supply, electric butterfly valve and is formed by connecting.First tutorial light normally opened contact K01-4 that the props up route emptying electromagnetic valve switch valve auxiliary reclay K01 formation of connecting with emptying valve opening solenoid valve tutorial light SA03 wherein; The normally-closed contact K01-5 that second tutorial light props up route emptying electromagnetic valve switch valve auxiliary reclay K01 and emptying solenoid valve close the valve tutorial light SA01 formation of connecting; The normally opened contact K02-4 that the 3rd tutorial light props up route electromagnetic valve switch valve auxiliary reclay K02 and bypass solenoid valve are opened the valve tutorial light SA04 formation of connecting; The normally-closed contact K02-5 that the 4th tutorial light props up route electromagnetic valve switch valve auxiliary reclay K02 and bypass solenoid valve close the valve tutorial light SA02 formation of connecting; The 5th tutorial light props up between the normally-closed contact K02-6, pressure senior middle school of normally-closed contact K01-6, the bypass solenoid valve switch valve auxiliary reclay K02 of route emptying electromagnetic valve switch valve auxiliary reclay K01 electric butterfly valve leak detection position, the electric butterfly valve of the electronic glasses valve leak detection of normally opened contact K05-1, the electric butterfly valve throw over switch S02 of relay K 05 and leaks tutorial light LA01 series connection and constitute; Electronic glasses valve leak detection position, the electronic glasses valve of the electronic glasses valve leak detection of normally opened contact K06-1, electric butterfly valve throw over switch S02 that the 6th tutorial light props up normally-closed contact K02-6, the low auxiliary reclay K06 of pressure of normally-closed contact K01-6, the bypass solenoid valve switch valve auxiliary reclay K02 of route emptying electromagnetic valve switch valve auxiliary reclay K01 leaks tutorial light LA02 series connection and constitutes.
When the electric butterfly valve XV11 of novel gas cut-out system and electronic glasses valve XV21 opened, gaspipe network provided coal gas to the coal gas user; When in case the coal gas user stops using coal gas or equipment need stop the supple of gas or steam maintenance; Electric butterfly valve XV11 and electronic glasses valve XV21 that novel gas cuts off system close; The gas pipe line that gaspipe network is led to the coal gas user cuts off; With pressurized air or nitrogen the coal gas that novel gas cuts off in system and the downstream line thereof is purged displacement, the emptying solenoid valve SV01, bypass solenoid valve SV02, the pressure switch PI01 that launch the leak detection system of novel gas cut-out system simultaneously carry out online detection to the leakage situation of electric butterfly valve XV11 and electronic glasses valve XV21.
The electronic glasses valve leak detection of electric butterfly valve throw over switch S02 is chosen in " electric butterfly valve leak detection " position electric butterfly valve XV11 Leak testtion:
1) close bypass solenoid valve SV02: the other automatic change-over S01 of machine is selected in " by the machine " position; Press bypass solenoid valve and close valve button SA02; Bypass solenoid valve switch valve auxiliary reclay K02 coil losing electricity; Bypass solenoid valve switch valve auxiliary reclay K02 normally opened contact K02-1 breaks off, bypass solenoid valve SV02 coil losing electricity, and bypass solenoid valve is closed.
2) open emptying solenoid valve SV01: the other automatic change-over S01 of machine is selected in " by the machine " position; Press emptying valve opening solenoid valve button SA03; Emptying electromagnetic valve switch valve auxiliary reclay K01 coil closes the normally-closed contact K02-2 (interlocking) that normally opened contact K24-1, throw over switch S01 " by the machine " position, emptying solenoid valve that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place close valve button SA01, emptying valve opening solenoid valve button SA03, bypass solenoid valve switch valve auxiliary reclay K02 through leak detection system power supply circuit breaker Q 01, electric butterfly valve and constitutes the loop; It is electric that emptying electromagnetic valve switch valve auxiliary reclay K01 coil is got, the normally opened contact K01-3 self-locking of the electromagnetic valve switch of emptying simultaneously valve auxiliary reclay K01.The normally opened contact K01-1 closure of emptying electromagnetic valve switch valve auxiliary reclay K01 gets emptying solenoid valve SV01 coil; Emptying solenoid valve SV01 opens outside exhaust; Manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 descends; Until the low make contact of pressure of pressure switch PI01, gas emptying in the pipeline between electric butterfly valve XV11 and the electronic glasses valve XV21 is described.
3) close emptying solenoid valve SV01: the other automatic change-over S01 of machine is selected in " by the machine " position; Press the emptying solenoid valve and close valve button SA01; Emptying electromagnetic valve switch valve auxiliary reclay K01 coil losing electricity makes emptying solenoid valve SV01 coil losing electricity then, and emptying solenoid valve SV01 closes.
4) time-delay a period of time (time expand is confirmed according to gas pipe line pressure and caliber); If the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 does not rise; The low contact of the pressure of pressure switch PI01 is still closed; Low relay K 06 coil of pressure gets electric, explains that the electric butterfly valve of gas cutting system does not have leakage; If the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 rises; The high make contact of the pressure of pressure switch PI01; High relay K 05 coil of pressure gets; Electric butterfly valve leaks that relay K 05 contact, the electronic glasses valve of electric butterfly valve leak formation loop, throw over switch S02 " electric butterfly valve leak detection " position between the normally-closed contact K02-6, pressure senior middle school of the normally closed K01-6 contact of tutorial light LA01 through emptying electromagnetic valve switch valve auxiliary reclay K01, bypass solenoid valve switch valve auxiliary reclay K02; Electric butterfly valve leaks tutorial light LA01 to be lighted, and explains that electric butterfly valve XV11 leaks.
The other leak detection of machine is used for installation, debugging and the maintenance that novel gas cuts off system.When the other automatic change-over S01 of Leak testtion machine is chosen in " automatically " position; Leak by the online detection electric butterfly valve of PLC; Leak testtion is carried out as follows: PLC at first accepts leak detection system power supply switching signal [disconnection of circuit breaker Q 01 auxiliary contact], electric butterfly valve and closes the signal that puts in place [pass put in place the normally opened contact K14-2 of auxiliary reclay K14 closed], electronic glasses valve and close the signal that puts in place [pass put in place the normally opened contact K24-2 of auxiliary reclay K24 closed], other automatic change-over S01 " automatically " position signal of Leak testtion machine, bypass solenoid valve and close signal [the normally opened contact K02-7 disconnection of bypass solenoid valve switch valve auxiliary reclay K02]; If above-mentioned signal conditioning satisfies; PLC sends the order of " opening " emptying solenoid valve; Emptying solenoid valve automatic switch valve auxiliary reclay K03 coil gets electric, and the normally opened contact K03-1 of automatic switch valve auxiliary reclay K03 is closed, and emptying electromagnetic valve switch valve auxiliary reclay K01 coil gets; The normally opened contact K01-1 of emptying electromagnetic valve switch valve auxiliary reclay K01 is closed; Emptying solenoid valve SV01 coil gets electric, and emptying solenoid valve SV01 opens outside exhaust, and the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 descends; The low make contact of pressure until pressure switch PI01; The low auxiliary reclay K06 coil of pressure gets electric, and the closure signal of the normally opened contact K06-2 of the low auxiliary reclay K06 of pressure is sent PLC, and gas emptying in the pipeline between electric butterfly valve XV11 and the electronic glasses valve XV21 is described.After PLC receives the closure signal of normally opened contact K06-2 of the low auxiliary reclay K06 of pressure; PLC sends and closes emptying solenoid valve SV01 order, emptying solenoid valve automatic switch valve auxiliary reclay K03 coil losing electricity, and the normally opened contact K03-1 of automatic switch valve auxiliary reclay K03 breaks off; K01 coil losing electricity in the middle of the emptying electromagnetic valve switch valve; The normally opened contact K01-1 of emptying electromagnetic valve switch valve auxiliary reclay K01 breaks off, emptying solenoid valve SV01 coil losing electricity, and emptying solenoid valve SV01 closes; Time-delay a period of time (time expand is confirmed according to gas pipe line pressure and caliber); If the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 does not rise, what PLC received is the normally opened contact K06-2 closure signal of the low auxiliary reclay K06 of pressure, explains that the electric butterfly valve of gas cutting system does not have leakage; If the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 rises; The high make contact of the pressure of pressure switch PI01, relay K 05 coil gets electricly between pressure senior middle school, and PLC receives relay K 05 normally opened contact K05-2 closure signal between pressure senior middle school; Explain that electric butterfly valve XV11 leaks, PLC sends the acoustooptic alarm signal.
Electric butterfly valve/electronic glasses valve leak detection throw over switch S02 is chosen in " electronic glasses valve leak detection " position, the electronic glasses valve of gas cutting system is leaked detect:
1) close emptying solenoid valve SV01: the other automatic change-over S01 of machine is selected in " by the machine " position; Press the emptying solenoid valve and close valve button SA01; Emptying electromagnetic valve switch valve auxiliary reclay K01 coil losing electricity; The normally opened contact K01-1 of emptying electromagnetic valve switch valve auxiliary reclay K01 breaks off, emptying solenoid valve SV01 coil losing electricity, emptying closed electromagnetic valve.
2) open bypass solenoid valve SV02: the other automatic change-over S01 of machine is selected in " by the machine " position; Press bypass solenoid valve and open valve button SA04; Bypass solenoid valve switch valve auxiliary reclay K02 closes normally opened contact K24-1, throw over switch S01 " by the machine " position, electronic glasses valve that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place through leak detection system power supply circuit breaker Q 01, electric butterfly valve and closes the normally-closed contact K01-2 (interlocking) that valve button SA02, electronic glasses valve leave valve button SA04, emptying electromagnetic valve switch valve auxiliary reclay K01 and constitute the loop; It is electric that bypass solenoid valve switch valve auxiliary reclay K02 coil is got, simultaneously the normally opened contact K02-3 self-locking of bypass solenoid valve switch valve auxiliary reclay K02.The normally opened contact K02-1 of bypass solenoid valve switch valve auxiliary reclay K02 is closed; Bypass solenoid valve SV02 coil is got; Bypass solenoid valve SV02 opens; Gaspipe network is supplied gas through the pipeline of bypass solenoid valve SV02 between electric butterfly valve XV11 and electronic glasses valve XV21; Manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 rises, and until the high make contact of pressure of pressure switch PI01, explains that gas is full of in the pipeline between electric butterfly valve XV11 and the electronic glasses valve XV21.
3) close bypass solenoid valve SV02: the other automatic change-over S01 of machine is selected in " by the machine " position; Press bypass solenoid valve and close valve button SA02; Bypass solenoid valve switch valve auxiliary reclay K02 coil losing electricity makes bypass solenoid valve SV02 coil losing electricity then, and bypass solenoid valve SV02 closes; Time-delay a period of time (time expand is confirmed according to gas pipe line pressure and caliber); If the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 does not descend; The high contact of the pressure of pressure switch PI01 is still closed, explains that the electronic glasses valve of gas cutting system does not have leakage; If the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 descends; The pressure of pressure switch PI01 hangs down make contact; Low relay K 06 coil of pressure gets; Electronic glasses valve leaks tutorial light LA02 and leaks formation loop, throw over switch S02 " electronic glasses valve leak detection " position through the normally-closed contact K01-6 of emptying electromagnetic valve switch valve auxiliary reclay K01, the normally-closed contact K02-6 of bypass solenoid valve switch valve auxiliary reclay K02, the electronic glasses valve of normally opened contact K06-1, electric butterfly valve of the low auxiliary reclay K06 of pressure; Electronic glasses valve leaks tutorial light LA02 to be lighted, and explains that electronic glasses valve XV21 leaks.
The other leak detection of machine is used for installation, debugging and the maintenance that novel gas cuts off system.When the other automatic change-over S01 of Leak testtion machine is chosen in " automatically " position; Leak by the electronic glasses valve of the online detection of PLC; Leak testtion is carried out as follows: PLC at first accepts leak detection system power supply switching signal [disconnection of circuit breaker Q 01 auxiliary contact], electric butterfly valve and closes the signal that puts in place [pass put in place the normally opened contact K14-2 of auxiliary reclay K14 closed], electronic glasses valve and close the signal that puts in place [pass put in place the normally opened contact K24-2 of auxiliary reclay K24 closed], other automatic change-over S01 " automatically " position signal of Leak testtion machine, emptying solenoid valve and close signal [the normally opened contact K01-7 disconnection of emptying electromagnetic valve switch valve auxiliary reclay K01]; If above-mentioned signal conditioning satisfies; PLC sends the order of " opening " bypass solenoid valve; Bypass solenoid valve automatic switch valve auxiliary reclay K04 coil gets; The normally opened contact K04-1 of automatic switch valve auxiliary reclay K04 is closed, and bypass solenoid valve switch valve auxiliary reclay K02 coil gets electric, and the normally opened contact K02-1 of bypass solenoid valve switch valve auxiliary reclay K02 is closed; Bypass solenoid valve SV02 coil gets; Bypass solenoid valve SV02 opens, and gaspipe network is supplied gas through the pipeline of bypass solenoid valve SV02 between electric butterfly valve XV11 and electronic glasses valve XV21, and the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 rises; The high make contact of pressure until pressure switch PI01; Relay K 05 coil gets electricly between pressure senior middle school, and PLC receives relay K 05 contact close signal between pressure senior middle school, explains that gas is full of in the pipeline between electric butterfly valve XV11 and the electronic glasses valve XV21.Time-delay a period of time (time expand is confirmed according to gas pipe line pressure and caliber); If the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 does not descend; The normally opened contact K05-2 closure signal that remains relay K 05 between pressure senior middle school that PLC receives; The electronic glasses valve that the gas cutting system is described does not have leakage, if the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 descends, the pressure of pressure switch PI01 hangs down make contact; The low auxiliary reclay K06 coil of pressure gets; PLC receives the normally opened contact K06-2 closure signal of the low auxiliary reclay K06 of pressure, explains that electronic glasses valve XV21 leaks, and PLC sends the acoustooptic alarm signal.
In the above-mentioned implementation process,, need overhaul if detect electric butterfly valve or electronic glasses valve has leakage; If detect electric butterfly valve or electronic glasses valve does not have leakage; Enter into online Leak testtion process, promptly close bypass solenoid valve SV02, open emptying solenoid valve SV01, the manifold pressure between electric butterfly valve XV11 and the electronic glasses valve XV21 closes the manifold pressure variation between emptying solenoid valve SV01, PLC online detection electric butterfly valve XV11 and the electronic glasses valve XV21 after descending again.
It should be noted last that; Above embodiment is only unrestricted in order to the technological scheme of explanation novel gas cut-out system; Although specify with reference to preferred embodiment, those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement the present technique scheme; And not breaking away from the spirit and the scope of present technique scheme, it all should be encompassed in the middle of the claim scope that novel gas cuts off system.

Claims (4)

1. the novel gas of the online detection leakage of ability cuts off system; It is characterized in that: it comprises the gas pipe line between gaspipe network and the coal gas user; And the electric butterfly valve XV11 that on gas pipe line, sets gradually, analytical sampling valve HV01, blow down valve HV02, pressure switch PI01 and electronic glasses valve XV21 by the flow of gas direction; Also comprise bypass solenoid valve SV02 and emptying solenoid valve SV01; Wherein bypass solenoid valve SV02 is parallelly connected with electric butterfly valve XV11 gas circuit through pipeline, and emptying solenoid valve SV01 one end is connected on the pipeline between electric butterfly valve XV11 and the analytical sampling valve HV01 through pipeline, and the other end is communicated with atmosphere; Pressure switch PI01, bypass solenoid valve SV02 and emptying solenoid valve SV01 control through relay by programmable logic controller (PLC) PLC.
2. the novel gas that the online detection of ability according to claim 1 is leaked cuts off system, it is characterized in that: described relay comprises that emptying electromagnetic valve switch valve auxiliary reclay K01, bypass solenoid valve switch valve auxiliary reclay K02, electric butterfly valve close the auxiliary reclay K14 that puts in place, electronic glasses valve closes put in place relay K 05 and the low auxiliary reclay K06 of pressure between auxiliary reclay K24, pressure senior middle school; It comprises that also emptying solenoid valve pass valve button SA01, emptying valve opening solenoid valve button SA03, bypass solenoid valve close valve button SA02, bypass solenoid valve is opened valve button SA04;
The normally opened contact K01-1 of power supply, emptying electromagnetic valve switch valve auxiliary reclay K01 and emptying electromagnetic valve coil constitute the loop; The normally opened contact K02-1 of power supply, bypass solenoid valve switch valve auxiliary reclay K02 and bypass solenoid valve coil constitute the loop;
The emptying solenoid valve leaks the other loop of detecting of machine and closes normally opened contact K24-1, emptying solenoid valve that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place by power supply, electric butterfly valve and close valve button SA01, emptying valve opening solenoid valve button SA03, the normally-closed contact K02-2 of bypass solenoid valve switch valve auxiliary reclay K02, the coil of emptying electromagnetic valve switch valve auxiliary reclay K01 and constitute, and the normally opened contact K01-3 of emptying electromagnetic valve switch valve auxiliary reclay K01 is parallelly connected with emptying valve opening solenoid valve button SA03;
Bypass solenoid valve leaks the other loop of detecting of machine and closes normally opened contact K24-1, bypass solenoid valve that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place by power supply, electric butterfly valve and close that valve button SA02, bypass solenoid valve leave the normally-closed contact K01-2 of valve button SA04, emptying electromagnetic valve switch valve auxiliary reclay K01, the coil of bypass solenoid valve switch valve auxiliary reclay K02 constitutes, and it is parallelly connected that the normally opened contact K02-3 of bypass solenoid valve switch valve auxiliary reclay K02 and bypass solenoid valve are opened valve button SA04;
Power supply, electric butterfly valve close that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the coil of relay K 05 between the normally opened contact K24-1, pressure senior middle school of the auxiliary reclay K24 that puts in place, the high contact of pressure of pressure switch PI01 constitutes the loop; Power supply, electric butterfly valve close the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve closes the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the formation loop, the low contact of coil, pressure switch PI01 pressure that pressure hangs down auxiliary reclay K06;
Electric butterfly valve closes that the normally opened contact K14-2 of auxiliary reclay K14 that puts in place, electronic glasses valve close the normally opened contact K05-2 of relay K 05 between the normally opened contact K02-7, pressure senior middle school of normally opened contact K01-7, the bypass solenoid valve switch valve auxiliary reclay K02 of normally opened contact K24-2, the emptying electromagnetic valve switch valve auxiliary reclay K01 of the auxiliary reclay K24 that puts in place, the normally opened contact K06-2 of the low auxiliary reclay K06 of pressure is connected with the DI module of PLC control system respectively.
3. the novel gas that the online detection of ability according to claim 2 is leaked cuts off system, it is characterized in that: it also comprises the other automatic change-over S01 of Leak testtion machine, emptying solenoid valve automatic switch valve auxiliary reclay K03 and bypass solenoid valve automatic switch valve auxiliary reclay K04;
The coil of emptying solenoid valve automatic switch valve auxiliary reclay K03, the coil of bypass solenoid valve automatic switch valve auxiliary reclay K04 are connected with the DO module of PLC control system;
The other position of the machine of the other automatic change-over S01 of Leak testtion machine is series at said emptying solenoid valve leakage machine other detection loop respectively and bypass solenoid valve leaks in the other detection of the machine loop;
The emptying solenoid valve leaks online detection loop and closes the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve by power supply, electric butterfly valve and close the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the automated location of the other automatic change-over S01 of Leak testtion machine, the normally opened contact K03-1 of emptying electromagnetic valve switch valve auxiliary reclay K03, the normally-closed contact K02-2 of bypass solenoid valve switch valve auxiliary reclay K02, the coil of emptying electromagnetic valve switch valve auxiliary reclay K01 and constitute;
Bypass solenoid valve leaks online detection loop and closes the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve by power supply, electric butterfly valve and close the normally opened contact K24-1 of the auxiliary reclay K24 that puts in place, the automated location of the other automatic change-over S01 of Leak testtion machine, the normally opened contact K04-1 of bypass solenoid valve switch valve auxiliary reclay K04, the normally-closed contact K01-2 of emptying electromagnetic valve switch valve auxiliary reclay K01, the coil of bypass solenoid valve switch valve auxiliary reclay K02 and constitute.
4. the novel gas according to claim 2 or the online detection leakage of 3 described abilities cuts off system; It is characterized in that: it also comprises the Leak testtion indicator light circuit; The Leak testtion indicator light circuit closes normally opened contact K24-1 and 6 tutorial light branch roads that the normally opened contact K14-1 of auxiliary reclay K14 that puts in place, electronic glasses valve close the auxiliary reclay K24 that puts in place power supply, electric butterfly valve and is formed by connecting, wherein
The normally opened contact K01-4 that first tutorial light props up route emptying electromagnetic valve switch valve auxiliary reclay K01 formation of connecting with emptying valve opening solenoid valve tutorial light SA03;
The normally-closed contact K01-5 that second tutorial light props up route emptying electromagnetic valve switch valve auxiliary reclay K01 and emptying solenoid valve close the valve tutorial light SA01 formation of connecting;
The normally opened contact K02-4 that the 3rd tutorial light props up route electromagnetic valve switch valve auxiliary reclay K02 and bypass solenoid valve are opened the valve tutorial light SA04 formation of connecting;
The normally-closed contact K02-5 that the 4th tutorial light props up route electromagnetic valve switch valve auxiliary reclay K02 and bypass solenoid valve close the valve tutorial light SA02 formation of connecting;
The 5th tutorial light props up between the normally-closed contact K02-6, pressure senior middle school of normally-closed contact K01-6, the bypass solenoid valve switch valve auxiliary reclay K02 of route emptying electromagnetic valve switch valve auxiliary reclay K01 electric butterfly valve leak detection position, the electric butterfly valve of the electronic glasses valve leak detection of normally opened contact K05-1, the electric butterfly valve throw over switch S02 of relay K 05 and leaks tutorial light LA01 series connection and constitute;
Electronic glasses valve leak detection position, the electronic glasses valve of the electronic glasses valve leak detection of normally opened contact K06-1, electric butterfly valve throw over switch S02 that the 6th tutorial light props up normally-closed contact K02-6, the low auxiliary reclay K06 of pressure of normally-closed contact K01-6, the bypass solenoid valve switch valve auxiliary reclay K02 of route emptying electromagnetic valve switch valve auxiliary reclay K01 leaks tutorial light LA02 series connection and constitutes.
CN2012200905113U 2012-03-12 2012-03-12 Novel coal gas cut-out system capable of detecting leakage on line Expired - Fee Related CN202531963U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200905113U CN202531963U (en) 2012-03-12 2012-03-12 Novel coal gas cut-out system capable of detecting leakage on line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200905113U CN202531963U (en) 2012-03-12 2012-03-12 Novel coal gas cut-out system capable of detecting leakage on line

Publications (1)

Publication Number Publication Date
CN202531963U true CN202531963U (en) 2012-11-14

Family

ID=47133150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200905113U Expired - Fee Related CN202531963U (en) 2012-03-12 2012-03-12 Novel coal gas cut-out system capable of detecting leakage on line

Country Status (1)

Country Link
CN (1) CN202531963U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110778765A (en) * 2019-11-17 2020-02-11 广东韶钢松山股份有限公司 Method and system for operating gas blind plate valve
CN112013278A (en) * 2019-05-29 2020-12-01 中国石油天然气股份有限公司 Emergency stop device for gas transmission station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112013278A (en) * 2019-05-29 2020-12-01 中国石油天然气股份有限公司 Emergency stop device for gas transmission station
CN110778765A (en) * 2019-11-17 2020-02-11 广东韶钢松山股份有限公司 Method and system for operating gas blind plate valve

Similar Documents

Publication Publication Date Title
CN102588744B (en) On-line leakage detecting method of gas cutting-off system
CN201620173U (en) Device for monitoring and controlling recovery of coal gas of convertor
CN202531963U (en) Novel coal gas cut-out system capable of detecting leakage on line
CN202342994U (en) Filtering system for replacing filter element on line
KR20150066250A (en) Digital Full automatic valve cross-over and controlling system for apparatus of supplying the high pressure gas for industry
CN102022735A (en) Method and device for preventing tempering or blowing-off of fuel gas
CN101358687B (en) Gas safety conveying method
CN111928278A (en) Claus tail gas treatment device
CN102563201B (en) Device for eliminating leakage risk of gas gate valve online
CN102519682A (en) GPS (Global Position System) module watertightness testing device
CN210048800U (en) Converter coal gas recycling and diffusing switching device
CN113374919B (en) Automatic valve control system under special working condition
CN109611396B (en) Automatic oil supply switching hydraulic system and method for large-ladle sliding gate hydraulic cylinder
CN109856187B (en) Online real-time detection method for hydrocarbon dew point of gas pipeline
CN210514303U (en) Intelligent double-insurance carrier-gas-free online monitoring device for dissolved gas in oil
CN208185858U (en) Fueller in a kind of diecasting punching head grease
CN210637170U (en) Fuel pipeline redundancy device of diesel generator
CN209841751U (en) Online real-time detection device for water dew point of gas pipeline
CN107589716B (en) fire safety control system for exhaust gas purification apparatus
CN205447272U (en) Controlling means is promptly cut off in electric shaft of liquefied petroleum gas storage tank gas
CN112763647A (en) Graded alarm protection system and alarm protection method for high-pressure hydrogen equipment
CN202583849U (en) Coke oven gas pipeline low-pressure automatic protection system
CN204704613U (en) A kind of chemical system automatic overvoltage bleeder
CN220623696U (en) Compressed air double-main-pipe protection system with flow meter
CN109386737B (en) Leakage detection device and method for safety cut-off valve of oxygen-enriched fuel system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20140312