CN202530575U - Connection structure for building floor slabs - Google Patents

Connection structure for building floor slabs Download PDF

Info

Publication number
CN202530575U
CN202530575U CN2012202067093U CN201220206709U CN202530575U CN 202530575 U CN202530575 U CN 202530575U CN 2012202067093 U CN2012202067093 U CN 2012202067093U CN 201220206709 U CN201220206709 U CN 201220206709U CN 202530575 U CN202530575 U CN 202530575U
Authority
CN
China
Prior art keywords
wall
connection structure
connector
building floor
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012202067093U
Other languages
Chinese (zh)
Inventor
陈土有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG TIANSHENG TRANSPORTATION ENGINEERING Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012202067093U priority Critical patent/CN202530575U/en
Application granted granted Critical
Publication of CN202530575U publication Critical patent/CN202530575U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model belongs to the building technical field, and provides a connection structure for building floor slabs. The connection structure comprises a foundation layer, a peripheral ground and a wall. The wall is connected with the peripheral ground, the foundation layer and the wall are arranged into an inverted T shape, a rebar body is bundled on the wall, a steel bar is fastened on the rebar body, a connection part is welded on the rebar body, one end of the connection part is exposed out of the surface of the wall, and a floor slab is mounted on the connection part. The connection structure for building floor slabs has the advantages that the floor slab and the wall are connected through the connection part which is placed in the wall, hence, the connection strength of the floor slab and the wall is enhanced; further, a sealing pad layer is arranged, so that the dampness probability of wood is reduced effectively.

Description

A kind of building floor connection structure
Technical field
The utility model belongs to technical field of buildings, relates to a kind of building floor connection structure.
Background technology
Connectivity robustness depended primarily on the form of foundation wall when the building floor was installed; The house is in the degree of depth of below ground, and the lateral support factor that the magnitude of load of main house body and floor frame system are provided, existing syndeton are when floor is installed, directly floor to be embedded in the concrete; After concrete setting, just fix house floor then; Can find out that this method difficulty of construction is very big, be unfavorable for the orderly arrangement of floor, therefore need improve syndeton.
Summary of the invention
The utility model technical problem to be solved is the present situation to prior art, and provides a kind of bonding strength good, improves the building floor connection structure of house-side to resistance to compression load.
The utility model solves the problems of the technologies described above the technical scheme that is adopted: a kind of building floor connection structure is characterized in that: comprise basal layer, peripheral ground and body of wall, described body of wall links to each other with peripheral ground; Described basal layer and body of wall are the inverted T-shape setting; On body of wall, tie up the reinforcing bar body, tightened at the reinforcing bar body and be buckled with steel bar, be welded with connector on the described reinforcing bar body; One end of connector exposes the surface of body of wall, and floor is installed on connector.
The measure of taking for the optimization such scheme specifically comprises:
In above-mentioned a kind of building floor connection structure, an end of described steel bar is provided with crotch, and described steel bar is held on the reinforcing bar body through crotch.
In above-mentioned a kind of building floor connection structure, described connector is L-shaped, between body of wall and floor, also is provided with the sealing bed course.
Compared with prior art; The advantage of the utility model is: connect floor and body of wall through connector here, and connector is positioned at body of wall, thereby strengthened the bonding strength of floor and body of wall; The sealing bed course is set in addition, has reduced the possibility of making moist of timber effectively.
Description of drawings
Fig. 1 is this building floor connection structure sketch map.
Among the figure, basal layer 1; Peripheral ground 2; Body of wall 3; Reinforcing bar body 4; Steel bar 5; Crotch 5a; Connector 6; Floor 7; Sealing bed course 8.
The specific embodiment
Below be the specific embodiment of the utility model and combine accompanying drawing, the technical scheme of the utility model is done further to describe, but the utility model is not limited to these embodiment.
As shown in Figure 1, this building floor connection structure comprises basal layer 1, peripheral ground 2 and body of wall 3; Body of wall 3 links to each other with peripheral ground 2, and basal layer 1 is the inverted T-shape setting with body of wall 3, on body of wall 3, has tied up reinforcing bar body 4; Tighten at reinforcing bar body 4 and to be buckled with steel bar 5,, improve lateral support load in order to guarantee certain bonding strength; One end of steel bar 5 is provided with crotch 5a, and steel bar 5 is held on the reinforcing bar body 4 through crotch 5a, is welded with connector 6 on the reinforcing bar body 4; Connector 6 is L-shaped, and an end of connector 6 exposes the surface of body of wall 3, and floor 7 is installed on connector 6; In order to have reduced the possibility of making moist of timber effectively, between body of wall 3 and floor 7, also be provided with sealing bed course 8 in addition.
In the utility model when construction, be fluid concrete basal layer 1 at first; Then along concrete foundation layer 1 wiretie body 4, and then connect steel bar 5, confirm the actual elevation of connector 6 again according to the absolute altitude of body of wall 3; Be welded on the reinforcing bar body 4; And then cast wall 3 links to each other with peripheral ground 2, on body of wall 3 surfaces, lays sealing mat layer 8, at last connector 6 one ends passed sealing bed course 8 and is connected with floor 7.
Specific embodiment described herein only is that the utility model spirit is illustrated.The utility model person of ordinary skill in the field can make various modifications or replenishes or adopt similar mode to substitute described specific embodiment, but can't depart from the spiritual defined scope of the utility model.

Claims (3)

1. building floor connection structure, it is characterized in that: comprise basal layer (1), peripheral ground (2) and body of wall (3), described body of wall (3) links to each other with peripheral ground (2); Described basal layer (1) and body of wall (3) are the inverted T-shape setting; On body of wall (3), tie up reinforcing bar body (4), tightened at reinforcing bar body (4) and be buckled with steel bar (5), be welded with connector (6) on the described reinforcing bar body (4); One end of connector (6) exposes the surface of body of wall (3), and floor (7) is installed on connector (6).
2. a kind of building floor connection structure according to claim 1 is characterized in that: an end of described steel bar (5) is provided with crotch (5a), and described steel bar (5) is held on the reinforcing bar body (4) through crotch (5a).
3. a kind of building floor connection structure according to claim 1 and 2 is characterized in that: described connector (6) is L-shaped, between body of wall (3) and floor (7), also is provided with sealing bed course (8).
CN2012202067093U 2012-04-25 2012-04-25 Connection structure for building floor slabs Expired - Fee Related CN202530575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012202067093U CN202530575U (en) 2012-04-25 2012-04-25 Connection structure for building floor slabs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012202067093U CN202530575U (en) 2012-04-25 2012-04-25 Connection structure for building floor slabs

Publications (1)

Publication Number Publication Date
CN202530575U true CN202530575U (en) 2012-11-14

Family

ID=47131770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012202067093U Expired - Fee Related CN202530575U (en) 2012-04-25 2012-04-25 Connection structure for building floor slabs

Country Status (1)

Country Link
CN (1) CN202530575U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908840A (en) * 2016-05-10 2016-08-31 丁献忠 Mounting method for pure board structure assembled house

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908840A (en) * 2016-05-10 2016-08-31 丁献忠 Mounting method for pure board structure assembled house

Similar Documents

Publication Publication Date Title
CN204418426U (en) Precast wall panel seam syndeton
CN205224363U (en) Connection structure of floor and girder steel
CN204225277U (en) The prefabricated floor connector of steel building
CN104631674A (en) Composite floor slab and construction method thereof
CN100547181C (en) The construction technology that the wooden frame structure main body is connected with concrete foundation
CN202530575U (en) Connection structure for building floor slabs
CN204456159U (en) A kind of steel kind design concrete anchor location structure
CN204001699U (en) Building exterior wall heat preserving integrated template braced structures
CN103866866B (en) Super High Core Walls Structure and housing water node after setting a roof beam in place
CN202936804U (en) Prestressed pile based on post-tensioning method
CN102852280B (en) The prestressing force precast beam of head shelved by a kind of band
CN201400959Y (en) Silo concrete protecting layer locating piece in slipform construction
CN204238264U (en) A kind of sole plate post-poured strip structure
CN104234268B (en) A kind of prefabricated round type shear wall
CN206693469U (en) A kind of precast floor slab connecting node
CN204491947U (en) A kind of laminated floor slab
CN201762961U (en) Building structure with foamed cement combined with grid cloth or steel wire mesh
CN209413171U (en) A kind of prefabricated component stair of light silencing
CN202831387U (en) Prestressed reinforced concrete composite beam with concavo-convex composite surface
CN206971470U (en) The reinforced concrete shear wall of built-in horizontal diagonal brace
CN201762890U (en) Positioning strip for steel bar and template of reinforced concrete wall
CN207211189U (en) The underground pipe gallery of enhanced 3D printing
CN206360089U (en) Airport building roofing self-stabilization and prestressing force fixed system
CN203452001U (en) Country foot bridge railing structure
CN203066296U (en) Connecting structure of concrete slabs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LIU SHIWEI

Free format text: FORMER OWNER: CHEN TUYOU

Effective date: 20130718

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 322306 JINHUA, ZHEJIANG PROVINCE TO: 321001 JINHUA, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130718

Address after: 321001, room 5, unit 1, building 138, nine Chapter 201, Wucheng District, Zhejiang, Jinhua

Patentee after: Liu Shiwei

Address before: 322306 No. 186 West Village, Inchon Town, Panan County, Zhejiang

Patentee before: Chen Tuyou

ASS Succession or assignment of patent right

Owner name: ZHEJIANG TIANSHENG TRAFFIC ENGINEERING CO., LTD.

Free format text: FORMER OWNER: LIU SHIWEI

Effective date: 20130812

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130812

Address after: 321001 Wucheng New District Linjiang Industrial Zone, Zhejiang, Jinhua province (C block, first floor, Limited by Share Ltd office building, Zhejiang traffic construction group)

Patentee after: Zhejiang Tiansheng Transportation Engineering Co., Ltd.

Address before: 321001, room 5, unit 1, building 138, nine Chapter 201, Wucheng District, Zhejiang, Jinhua

Patentee before: Liu Shiwei

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20180425

CF01 Termination of patent right due to non-payment of annual fee