CN202520352U - Large-cross section gas outburst tunnel ventilating system - Google Patents

Large-cross section gas outburst tunnel ventilating system Download PDF

Info

Publication number
CN202520352U
CN202520352U CN 201220079702 CN201220079702U CN202520352U CN 202520352 U CN202520352 U CN 202520352U CN 201220079702 CN201220079702 CN 201220079702 CN 201220079702 U CN201220079702 U CN 201220079702U CN 202520352 U CN202520352 U CN 202520352U
Authority
CN
China
Prior art keywords
tunnel
positive hole
adit
parallel
section gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220079702
Other languages
Chinese (zh)
Inventor
刘汉银
张双智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No5 Engineering Corp Ltd Of Cr22g
China Railway 22nd Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Original Assignee
No5 Engineering Corp Ltd Of Cr22g
China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No5 Engineering Corp Ltd Of Cr22g, China Railway 22nd Bureau Group Co Ltd filed Critical No5 Engineering Corp Ltd Of Cr22g
Priority to CN 201220079702 priority Critical patent/CN202520352U/en
Application granted granted Critical
Publication of CN202520352U publication Critical patent/CN202520352U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The utility model discloses a large-cross section gas outburst tunnel ventilating system, which includes a main tunnel and a parallel adit, wherein the main tunnel and the parallel adit are communicated; and air ducts and press-in fans following along with the advancing of the excavating working surface of the tunnel are mounted in the main tunnel and the parallel adit. The large-cross section gas outburst tunnel ventilating system is characterized by also including a main fan and a jet fan, wherein the main fan is mounted on one side of the portal of the parallel adit and is higher than the air draft opening at the portal of the parallel adit; the jet fan is mounted at the air intake section of the main tunnel; air doors are arranged at the portal of the parallel adit and the air draft opening; the main tunnel air duct and the parallel adit air duct in the main tunnel are arranged on the wall body of the left and the right sides of the tunnel line 3.5 m above the rail surface; and the main tunnel and the parallel adit are communicated through a cross passage to form a roadway mixed ventilating system. The large-cross section gas outburst tunnel ventilating system adopts the main fan roadway ventilation, so as to effectively prevent the local gas accumulation, improves the ventilation conditions, and ensures the ventilation effect.

Description

The outstanding tunnel ventilation system of big section gas
Technical field
The utility model relates to the outstanding tunnel ventilation system of a kind of big section gas.
Background technology
When the coal seam of pressure is opened in the outstanding tunnel of gas, a large amount of gas emissions in the short time will cause that gas density sharply raises in the hole, as fast gas density in the hole not being dropped in the safe range, serious accident might take place.And along with the propelling of tunnel excavation work plane, portable blower also will follow up thereupon, so the distance of air inlet duct and air-return duct is also with increasing, because air refluxes, gas and dust concentration can increase in the air intake, all can form security incident.
The utility model content
The utility model technical problem to be solved provides the outstanding tunnel ventilation system of a kind of big section gas, adopts main fan ventilation by ducts, improves ventilation condition, guarantees ventilation effect.
The utility model technical problem to be solved realizes through following technical scheme:
A kind of big section gas is given prominence to the tunnel ventilation system; Comprise Zheng Dong, flat leading; Positive hole peace connects between leading, and the forced blower fan that positive hole peace all is equipped with air duct and follows up along with the propelling of tunnel excavation work plane in leading is characterized in that: also comprise main fan and jet blower; Described main fan is installed in flat pilot tunnel mouth one side and highly exceeds on the exhausting road junction at flat pilot tunnel mouth place, and jet blower is installed at the wind inlet section place in positive hole.
Said flat pilot tunnel mouth and place, exhausting road junction are equipped with air door.
Positive hole air duct and flat ventilating duct are arranged in barrel circuit left and right sides on the body of wall of the above 3.5m of rail level in the said positive hole.
Said positive hole peace is led two forced blower fans respectively is set, and the blower fan installation site will be positioned at the peaceful 20-50m place, transverse passage-way back that leads perforation place, positive hole along with the tunnel excavation advance of the face.
Between leading, said positive hole peace connects and formation tunnel combined ventilation system through transverse passage-way.
Said transverse passage-way is every between positive hole peace is led to be provided with one at a distance from the 300-400m distance.
The utility model following beneficial effect arranged:
1. adopt main fan ventilation by ducts; Improve ventilation condition: the one, when having opened the pressure coal seam in the outstanding tunnel of gas; A large amount of gas emissions in short time; To cause that gas density sharply raises in the hole,, serious accident might take place as fast gas density in the hole not being dropped in the safe range; The 2nd, after tunnelling footage surpassed 2000m, air returning ratio was more tired, for improving ventilation condition, started main fan, adopted main fan ventilation by ducts pattern can shorten the ventilation smoke exhaust time; The 3rd, when breaking down, forced blower fan shuts down for a long time, and gas density exceeds standard around the forced blower fan, and forced blower fan restarts security incident might take place.Can adopt main fan ventilation by ducts pattern through opening main fan, make that gas density is reduced to below the safe concentration fast around the forced blower fan, be that the forced blower fan of clean boot is created necessary condition.2. adopt fluidics, guarantee ventilation effect: along with the propelling of tunnel excavation work plane, forced blower fan also will follow up thereupon, so the distance of air inlet duct and air-return duct is also with increasing.Because air refluxes, gas and dust concentration can increase in the air intake.In order to ensure the quality of construction air intake, adopt segmentation that jet blower relay drainage is installed at air inlet duct, the fresh air outside the hole is blown into air inlet duct, improve ventilation effect.In local excavation's irregularity section, the local section of caving in, adopt ventilation by ducts, still be easy to generate local gas and assemble, adopt jet blower can dispel air mass, effectively prevent the local gas gathering.
Description of drawings
Fig. 1 the utility model structural representation
Among the figure, 1. positive hole, 2. flatly lead, 3. main fan, 4. jet blower, 5. forced blower fan, 6. transverse passage-way, 7. positive hole air duct, 8. air door, 9. flat ventilating duct
The specific embodiment
A kind of big section gas shown in Figure 1 is given prominence to the tunnel ventilation system; Comprise positive hole 1, flatly lead 2; Between leading 2, positive hole 1 peace connects through transverse passage-way 6; Positive hole 1, tunnel is an air inlet duct, through forced blower fan 5 fresh air outside the hole is guided to excavated surface, and discharge and dilution work plane are rich in the gas of gas, dust; The tunnel is put down and led 2 is air-return duct, through pressure reduction the mist of work plane is discharged outside the hole; Transverse passage-way 6 is every between positive hole 1 peace leads 2 opens one at a distance from the 300-400m distance, plays maintenance and drainage during the operation, and construction period is used to arrange air duct, is the part of ventilation system simultaneously.Positive hole 1 peace is led the forced blower fan 5 that air duct all is installed and follows up along with the propelling of tunnel excavation work plane in 2; Said positive hole 1 peace is led 2 two forced blower fans 5 respectively is set; Forced blower fan 5 installation sites will be positioned at 20-50m place, transverse passage-way 6 back along with the tunnel excavation advance of the face.
Ventilation system also comprises main fan 3, jet blower 4, and described main fan 3 is installed in to put down and leads 2 holes, one side and highly exceed flat leading on the exhausting road junction of locating at 2 holes, and positive hole 1 wind inlet section is installed jet blower 4.Shut down for a long time when forced blower fan 5 breaks down, gas density exceeds standard around the forced blower fan 5, and forced blower fan 5 restarts security incident might take place.Can adopt main fan 3 ventilation by ducts patterns through opening main fan 3, make that gas density is reduced to below the safe concentration fast around the forced blower fan 5, be that the forced blower fan 5 of clean boot is created necessary conditions.Along with the propelling of tunnel excavation work plane, forced blower fan 5 also will follow up thereupon, so the distance of air inlet duct and air-return duct is also with increasing.Because air refluxes, gas and dust concentration can increase in the air intake.In order to ensure the quality of construction air intake, adopt segmentation that jet blower relay drainage is installed at air inlet duct, the fresh air outside the hole is blown into air inlet duct, improve ventilation effect.
Saidly flat lead 2 holes, place, exhausting road junction is equipped with air door 8, size is set according to concrete section.
Positive hole air duct 7 in the said positive hole 1 is arranged in its barrel circuit left and right sides on the body of wall of the above 3.5m of rail level with flat ventilating duct 9.Positive hole air duct 7 with flat ventilating duct 9 every 5m rivet is set and body of wall is fixed, and with No. 8 iron wire suspensions, straight firm to guarantee.

Claims (6)

1. one kind big section gas is given prominence to the tunnel ventilation system; Comprise Zheng Dong, flat leading; Positive hole peace connects between leading, and the forced blower fan that positive hole peace all is equipped with air duct and follows up along with the propelling of tunnel excavation work plane in leading is characterized in that: also comprise main fan and jet blower; Described main fan is installed in flat pilot tunnel mouth one side and highly exceeds on the exhausting road junction at flat pilot tunnel mouth place, and jet blower is installed at the wind inlet section place in positive hole.
2. big section gas as claimed in claim 1 is given prominence to the tunnel ventilation system, it is characterized in that: said flat pilot tunnel mouth and place, exhausting road junction are equipped with air door.
3. big section gas as claimed in claim 1 is given prominence to the tunnel ventilation system, it is characterized in that: said positive hole air duct and flat ventilating duct are arranged in its barrel circuit left and right sides on the body of wall of the above 3.5m of rail level.
4. big section gas as claimed in claim 1 is given prominence to the tunnel ventilation system; It is characterized in that: said positive hole peace is led two forced blower fans respectively is set; The blower fan installation site will be positioned at the peaceful 20-50m place, transverse passage-way back that leads perforation place, positive hole along with the tunnel excavation advance of the face.
5. big section gas as claimed in claim 1 is given prominence to the tunnel ventilation system, it is characterized in that: connect and formation tunnel combined ventilation system through transverse passage-way between said positive hole peace is led.
6. big section gas as claimed in claim 5 is given prominence to the tunnel ventilation system, it is characterized in that: said transverse passage-way is every between positive hole peace is led to be provided with one at a distance from the 300-400m distance.
CN 201220079702 2012-03-06 2012-03-06 Large-cross section gas outburst tunnel ventilating system Expired - Fee Related CN202520352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220079702 CN202520352U (en) 2012-03-06 2012-03-06 Large-cross section gas outburst tunnel ventilating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220079702 CN202520352U (en) 2012-03-06 2012-03-06 Large-cross section gas outburst tunnel ventilating system

Publications (1)

Publication Number Publication Date
CN202520352U true CN202520352U (en) 2012-11-07

Family

ID=47103305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220079702 Expired - Fee Related CN202520352U (en) 2012-03-06 2012-03-06 Large-cross section gas outburst tunnel ventilating system

Country Status (1)

Country Link
CN (1) CN202520352U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527236A (en) * 2013-10-16 2014-01-22 中铁八局集团有限公司 Gas tunnel mixed type ventilation method
CN105986833A (en) * 2015-01-29 2016-10-05 西南交通大学 Inclined shaft auxiliary type tunnel ventilation system with partition plates
CN109139081A (en) * 2018-09-20 2019-01-04 中铁局集团第五工程有限公司 A kind of high methane Extra Long Tunnel Construction method of ventilation
CN110094231A (en) * 2019-04-03 2019-08-06 河海大学 It is a kind of prevention and reduction deep layer regulate and store tunnel trapped air mass harm structure
CN111305893A (en) * 2020-03-30 2020-06-19 中国十九冶集团有限公司 System and method for discharging gas in horizontal guide pipe
CN111365056A (en) * 2020-03-31 2020-07-03 中铁五局集团有限公司 Staged ventilation method based on complex cavern group construction
CN115653662A (en) * 2022-11-18 2023-01-31 太原理工大学 Ventilation system of long-distance single-head roadway

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527236A (en) * 2013-10-16 2014-01-22 中铁八局集团有限公司 Gas tunnel mixed type ventilation method
CN105986833A (en) * 2015-01-29 2016-10-05 西南交通大学 Inclined shaft auxiliary type tunnel ventilation system with partition plates
CN109139081A (en) * 2018-09-20 2019-01-04 中铁局集团第五工程有限公司 A kind of high methane Extra Long Tunnel Construction method of ventilation
CN110094231A (en) * 2019-04-03 2019-08-06 河海大学 It is a kind of prevention and reduction deep layer regulate and store tunnel trapped air mass harm structure
CN110094231B (en) * 2019-04-03 2024-02-23 河海大学 Structure for preventing and reducing damage of detention air mass of deep regulation tunnel
CN111305893A (en) * 2020-03-30 2020-06-19 中国十九冶集团有限公司 System and method for discharging gas in horizontal guide pipe
CN111365056A (en) * 2020-03-31 2020-07-03 中铁五局集团有限公司 Staged ventilation method based on complex cavern group construction
CN111365056B (en) * 2020-03-31 2021-10-15 中铁五局集团有限公司 Staged ventilation method based on complex cavern group construction
CN115653662A (en) * 2022-11-18 2023-01-31 太原理工大学 Ventilation system of long-distance single-head roadway
CN115653662B (en) * 2022-11-18 2024-01-30 太原理工大学 Ventilating system of long-distance single-head roadway

Similar Documents

Publication Publication Date Title
CN202520352U (en) Large-cross section gas outburst tunnel ventilating system
CN101225746A (en) Laneway type ventilating technique for long and large tunnel
CN103696806B (en) Gas tunnel prevention and controls and system thereof
CN109139081B (en) High-gas ultra-long tunnel construction ventilation method
CN203452824U (en) Ventilating system for city dual-layer mountain tunnel
CN209145623U (en) A kind of construction ventilation of tunnel dust pelletizing system
CN204002896U (en) One-tunnel one-track subway tunnel natural ventilating structure
CN106930781A (en) A kind of gas tunnel method of ventilation and its structure
CN204552795U (en) A kind of underground coal mine ventilating duct controlling type exhaust apparatus
CN102434156B (en) Dust removing curtain device for development machine
CN105971655A (en) All-dimensional regulating device for air outlet of fully mechanized excavation face air cylinder
CN104481570A (en) Underground blind tunnel ventilation system
CN105240041A (en) Ventilating smoke dissipating system used for underground cavern construction of large hydropower station
CN110318799B (en) Ventilation method for long and large tunnel construction
CN204591331U (en) The mine development end dash system of adjoint high-concentration hydrogen sulfide and gas
CN205154227U (en) Mining auxiliary ventilating fan dryer air outlet device of toper regulation and control formula
CN201963330U (en) Mechanical panel ventilation system
CN201507322U (en) Device for preventing gas reflux
CN205805597U (en) The comprehensive regulation device of fully mechanized workface air duct air outlet
CN107939435A (en) A kind of coal road dash system
CN208702445U (en) A kind of Tunnel Ventilation System
CN113266414B (en) Coal roadway tunneling gas control and ventilation method based on large-diameter directional drilling
CN204002888U (en) A kind of novel tunnel ventilation installation
CN103527236B (en) A kind of gas tunnel compound ventilation method
CN204344152U (en) A kind of down-hole dead face ventilation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20210306