CN202519972U - Insertion rib positioning template - Google Patents

Insertion rib positioning template Download PDF

Info

Publication number
CN202519972U
CN202519972U CN2012201825756U CN201220182575U CN202519972U CN 202519972 U CN202519972 U CN 202519972U CN 2012201825756 U CN2012201825756 U CN 2012201825756U CN 201220182575 U CN201220182575 U CN 201220182575U CN 202519972 U CN202519972 U CN 202519972U
Authority
CN
China
Prior art keywords
insertion rib
positioning template
template
joint bar
square timber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201825756U
Other languages
Chinese (zh)
Inventor
盛信平
商永红
徐启辉
覃智斌
关小猛
宋倩倩
余文飞
诸良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2012201825756U priority Critical patent/CN202519972U/en
Application granted granted Critical
Publication of CN202519972U publication Critical patent/CN202519972U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an insertion rib positioning template, which comprises a positioning template body, wherein a plurality of square timbers are fixed on the positioning template body; a plurality of insertion rib holes are formed in the positioning template body; a drilling hole is formed at one end of each square timber; and the other end of each square timber is vertically fixed with the positioning template body through screw nails. The insertion rib positioning template is applied to concrete engineering construction; and when the insertion rib positioning template encounters a part with an insertion rib penetrating through a construction gap, one side of the square timber on the insertion rib positioning device is packed in a reserved insertion rib gap, and the reserved drill hole on the other side of the square timber is used, so that the square timber is fixed on a rib plate of a storehouse surface template through a screw rod, the insertion rib positioning template is tightly attached to the template surfaces on two sides of the split gap at the same time, and finally, the insertion rib penetrates into the insertion rib hole reserved in the positioning template. By the insertion rib positioning template, the problem that the insertion rib easily moves when passing through the construction gap during concrete pouring is solved; the insertion rib positioning template is high in stability and conveniently and rapidly assembled; and the requirement of reinforcement construction quality is met.

Description

The joint bar locating template
Technical field
The utility model relates to the joint bar positioning template device that uses when joint bar is crossed constuction joint in a kind of concrete construction.
Background technology
In water power construction industry, often run into the project organization that joint bar is crossed constuction joint, job practices in the past: 1, directly on wooden form perforate cross joint bar; 2, reserve the joint bar seam at (or between steel form) on the wooden form, treat that the template frame is upright after, mend with preprepared joint bar plate and to reserve joint bar seam place, carry out joint bar then and construct.First method is comparatively simple, can't intact dismounting get off but its shortcoming is wooden form, and wooden form is often only used once and just damaged, thereby causes the waste of material; Cross seam construction and carry out joint bar with second method, the joint bar plate can't be fixed on the template, builds the easy displacement of joint bar in the process, seriously influences thereby construction quality caused.
Summary of the invention
The utility model will solve crosses the problem of the easy displacement in joint bar position of constuction joint when being concreting, a kind of good stability is provided, joint bar locating template quick and easy for installation.
The purpose of the utility model is achieved in that a kind of joint bar locating template, comprises locating template, and the many lumps of wood are fixed on the locating template, and locating template is provided with a plurality of joint bars hole.The lumps of wood one end is provided with boring, and the other end is through spiral nail and locating template vertical fixing.
The joint bar locating template that the utility model provides is applied in the concrete engineering construction; When running into the position that is designed with the joint bar that passes constuction joint; Only need to fill in the lumps of wood side on the joint bar positioner in the joint bar seam of reservation, and utilize the reservation boring of lumps of wood other end, adopt screw rod to be fixed on the floor of storehouse face die plate; The joint bar locating template is close to the template face of parting both sides simultaneously, joint bar is pierced in the joint bar hole of reserving on the locating template to get final product at last.When having solved concreting, crosses the utility model the difficult problem of the easy displacement in joint bar position of constuction joint, its good stability, and quick and easy for installation, satisfied the needs of reinforcement construction quality.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Fig. 1 is the vertical view of joint bar locating template structure.
Fig. 2 is that the A-A of Fig. 1 is to view.
Fig. 3 is that the B-B of Fig. 2 is to view.
Fig. 4 installs and uses sketch map for the joint bar locating template.
The specific embodiment
The structure of the utility model is shown in Fig. 1-3: a kind of joint bar locating template, comprise locating template 1, and the many lumps of wood 2 are fixed on the locating template 1, and locating template 1 is provided with a plurality of joint bars hole 5.The lumps of wood 2 one ends are provided with boring 4, and the other end is through the vertical fixing of spiral nail 3 with locating template 1.
The use step of the utility model is as shown in Figure 4:
1) in concrete construction, during the frame shuttering, when being designed with the position of the joint bar that passes constuction joint, then adopts this kind joint bar positioner.Between two templates at constuction joint place, reserve earlier joint bar seam face, seam face width degree is slightly wideer than the lumps of wood 2.
2) lumps of wood side on the joint bar positioning template device is filled in the reservation joint bar seam face, locating template 1 is close to the concrete blinding 6 of both sides simultaneously.
3) utilize the reservation boring 4 of lumps of wood other end, adopt screw rod to be fixed on the floor 7 of storehouse face die plate (also can use iron wire to be fixed in enclosing on the purlin of template).
4) at last joint bar 8 is pierced into joint bar hole 5 interior the getting final product of reserving on the locating template.
The joint bar positioner is quick and easy for installation, and good stability has guaranteed the construction quality of constuction joint place joint bar.

Claims (2)

1. a joint bar locating template comprises locating template (1), it is characterized in that: the many lumps of wood (2) are fixed on the locating template (1), and locating template (1) is provided with a plurality of joint bars hole (5).
2. a kind of joint bar locating template according to claim 1 is characterized in that: the lumps of wood (2) one ends are provided with boring (4), and the other end is through the vertical fixing of spiral nail (3) with locating template (1).
CN2012201825756U 2012-04-26 2012-04-26 Insertion rib positioning template Expired - Fee Related CN202519972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201825756U CN202519972U (en) 2012-04-26 2012-04-26 Insertion rib positioning template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201825756U CN202519972U (en) 2012-04-26 2012-04-26 Insertion rib positioning template

Publications (1)

Publication Number Publication Date
CN202519972U true CN202519972U (en) 2012-11-07

Family

ID=47102927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201825756U Expired - Fee Related CN202519972U (en) 2012-04-26 2012-04-26 Insertion rib positioning template

Country Status (1)

Country Link
CN (1) CN202519972U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223541A (en) * 2016-09-14 2016-12-14 中冶天工集团有限公司 A kind of rigid steel pile locating template and apply the construction method of this template

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223541A (en) * 2016-09-14 2016-12-14 中冶天工集团有限公司 A kind of rigid steel pile locating template and apply the construction method of this template

Similar Documents

Publication Publication Date Title
CN106150087B (en) A kind of combined frame column template and its construction method
CN104264984A (en) Formwork for concrete structure pouring and pouring construction method
CN104196231A (en) Concrete floor aluminum alloy template and construction method thereof
CN204676879U (en) Model sheetinstallat structure
CN206015908U (en) A kind of reinforcing bar and the attachment structure of steel column
CN202519972U (en) Insertion rib positioning template
CN204826642U (en) Hole template is reserved to inflatable
CN109750828A (en) Formwork erecting structure and construction method between a kind of small spacing shear wall
CN203347233U (en) Tapered tie bolt for large steel formworks
CN104563496A (en) Construction structure of cylindrical die
CN102605944A (en) Building formwork
CN204059940U (en) A kind of concrete floor aluminum alloy mould plate
CN104074354A (en) Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template
CN203429798U (en) Embedded bar structure for horizontal secondary structure of super high-rise
CN201802063U (en) Steel formwork used for building construction
CN203905474U (en) Multifunctional formwork cold-formed steel
CN205577403U (en) Template end cap instrument is pour to shear force wall waist rail concrete
CN203129597U (en) Connection structure of building wood formworks
CN203383215U (en) Soil nail for fixing side slope in high strength
CN207484961U (en) A kind of novel wall column steel form
CN207892255U (en) A kind of dedicated positioning device
CN105298137A (en) Steel column concrete auxiliary vibration device and installation and using method thereof
CN104074353B (en) Stair construction joint stopend and using method thereof
CN202467163U (en) Double-layer template supporting board
CN204139324U (en) Avoid T beam forms and wing plate to wet device that seam reinforcing bar interferences

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20190426

CF01 Termination of patent right due to non-payment of annual fee