CN202518803U - Clamping and discharging mechanisms - Google Patents

Clamping and discharging mechanisms Download PDF

Info

Publication number
CN202518803U
CN202518803U CN2012200784424U CN201220078442U CN202518803U CN 202518803 U CN202518803 U CN 202518803U CN 2012200784424 U CN2012200784424 U CN 2012200784424U CN 201220078442 U CN201220078442 U CN 201220078442U CN 202518803 U CN202518803 U CN 202518803U
Authority
CN
China
Prior art keywords
clamping
plate
discharging
hook
colludes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200784424U
Other languages
Chinese (zh)
Inventor
滕志中
赵剑福
王文
吴军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI KENKE HEAVY INDUSTRY EQUIPMENT Co Ltd
Original Assignee
WUXI KENKE HEAVY INDUSTRY EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI KENKE HEAVY INDUSTRY EQUIPMENT Co Ltd filed Critical WUXI KENKE HEAVY INDUSTRY EQUIPMENT Co Ltd
Priority to CN2012200784424U priority Critical patent/CN202518803U/en
Application granted granted Critical
Publication of CN202518803U publication Critical patent/CN202518803U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model relates to clamping and discharging mechanisms. The clamping and discharging mechanism comprises a storage frame, wherein bases are respectively arranged on two sides of the storage frame; a group of clamping and discharging mechanisms are parallelly connected to the bases which are arranged on the two sides of the storage frame; each clamping and discharging mechanism comprises a pair of connection palates which are arranged on the basis and hook plates which are hinged on the pair of connection plates by a pin shaft; one end of each of the hook plates is hook-shaped; and the bottom of each of the hook plates is connected with an air cylinder by the pin shaft. The clamping and discharging mechanisms have a simple structure, and are convenient to manufacture; the group of clamping and discharging mechanisms are arranged in two parallel interval distances of the storage frame, and a control system sends out a signal to control the air cylinders, so that the crossed actions of a first hook plate and a second hook plate can be conveniently realized, and an operation of gradual discharging is conveniently realized; and moreover, the discharging is safe and reliable, the impact and the damage to the surface quality of pipes are avoided, and the service lives of the mechanisms are prolonged.

Description

A kind of discharge mechanism that gets stuck
Technical field
The utility model relates to the load transfer device field of pipe material, in particular for the discharge mechanism that gets stuck of pipe material processing.
Background technology
In the pipe material manufacturing operation process,, the pipe material level is put and need be moved, perhaps, expect to enter into next process thereby make to manage to the operation of pipe material material loading, blanking owing to the needs of each station processing and manufacturing.Usually the pipe material all is to produce in batch, need carry out blowing when in use, and its blowing process and dispensing speed all are related to the crudy of pipe material.
At present, pipe material discharging device commonly used adopts the staggered one on the other action in orienting sleeve of two axis of guides to realize the blowing function, and this simple in structure, cost is low, but has following shortcoming:
(1) pipe material is through the direct bump axis of guide, long-term use, and the axis of guide is prone to occur bending and deformation, and causes the axis of guide stuck and cisco unity malfunction in orienting sleeve, and the serious axis of guide that will cause ruptures;
(2) bump of pipe material can make its surface produce damage, and product quality is low.
The utility model content
The applicant is to realizing the fragile pipe material of blowing surface quality through bump in the above-mentioned prior art; Shortcoming such as unreliable provides a kind of rational in infrastructure, the easy to operate discharge mechanism that gets stuck; Thereby the impulsive force when having reduced pipe material blowing; Guarantee to manage and expect steadily blowing one by one, improved production efficiency, and guaranteed the quality of product.
The technical scheme that the utility model adopted is following:
A kind of discharge mechanism that gets stuck comprises storage rack, and the two sides of said storage rack are respectively arranged with pedestal, and one group of discharge mechanism that gets stuck is parallel to be connected on the pedestal of storage rack both sides;
The structure of the said discharge mechanism that gets stuck is following: comprise a pair of connecting panel, said connecting panel is installed on the pedestal, also comprises and colludes plate, and the said plate that colludes is articulated on a pair of connecting panel through bearing pin; Said plate one end that colludes becomes hook-shaped, and the said plate bottom of colluding is connected with cylinder through bearing pin.
Its further technical scheme is:
First colludes the hook-shaped triangularity structure of plate, and second colludes the hook-shaped squarely structure of plate;
One group of discharge mechanism left and right sides spacing distance that gets stuck is installed on the pedestal of storage rack both sides.
The beneficial effect of the utility model is following:
The utility model is simple in structure; Easily manufactured; Through in two parallel interval of storage rack apart from one group of discharge mechanism that gets stuck is installed; And, realized that easily first colludes the staggered action that plate and second colludes plate, thereby realized operation easily by the root blowing in the effect that control system is sent the signal control cylinder.Blowing is safe and reliable, does not have and impacts, and can not damage pipe material surface quality, the long service life of mechanism.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the structural representation of first step blowing in the utility model practical application.
Fig. 3 is the structural representation of the second step blowing in the utility model practical application.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the utility model is described.
As shown in Figure 1; The described a kind of discharge mechanism that gets stuck of the utility model; Comprise storage rack 1, the two sides of storage rack 1 are respectively arranged with on the parallel pedestal 2 that is connected in storage rack 1 both sides of 2, one groups of discharge mechanisms that get stuck of pedestal; First discharge mechanism and the second discharge mechanism left and right sides spacing distance that gets stuck that gets stuck, distance at interval confirm according to the diameter of pipe material;
The structure of discharge mechanism of getting stuck is following: comprise a pair of connecting panel 3, connecting panel 3 is installed on the pedestal 2, comprises that also first colludes plate 5-1, and first colludes plate 5-1 is articulated on a pair of connecting panel 3 through bearing pin 4; First colludes the hook-shaped triangularity structure of plate 5-1 one end, and first colludes plate 5-1 bottom is connected with the first cylinder 6-1 through bearing pin 7; Second colludes the hook-shaped squarely structure of plate 5-2 one end, and same second colludes plate 5-2 bottom is connected with the second cylinder 6-2 through bearing pin.
In the actual use, pipe material blowing process is following:
The first step: see Fig. 2, when the piston rod of the second cylinder 6-2 stretches out, thereby collude plate 5-2 jack-up with second, the piston rod withdrawal of the first cylinder 6-1, the square structure that collude plate 5-2 one end this moment second blocks steel pipe 8 fully, stops it to continue to front slide;
Second step: see Fig. 3, send signal demand when control system and put when pipe that the piston rod of the first cylinder 6-1 stretches out; Collude plate 5-1 jack-up with first, first collude plate 5-1 end triangular structure just in time be stuck between two slits between the steel pipe 8, at this moment; The piston rod withdrawal of the second cylinder 6-2, second colludes plate 5-2 descends, and promptly a steel pipe 8 is rolled on the next workplatform against storage rack 1 inclined-plane; After steel pipe 8 blowings were accomplished, the piston rod of the second cylinder 6-2 stretched out once more, and second colludes plate 5-2 jack-up; The piston rod of first cylinder 6-1 withdrawal simultaneously, first colludes plate 5-1 descends, roll forward along the storage rack 1 inclined-plane distance of a pipe of the steel pipe of follow-up arrangement; The steel pipe 8 of follow-up arrangement this moment is colluded plate 5-2 by second and blocks fully, promptly accomplishes one and puts the pipe action.The utility model colludes plate 5-1 and second through first and colludes plate 5-2 respectively in the staggered action of the effect of the first cylinder 6-1 and second cylinder 6-2 circulation, thereby has realized the operation of putting pipe by root easily.
The utility model can be according to the length of steel pipe 8 and the quality many groups mechanisms that on storage rack 1, be arranged side by side, and realize the function of putting pipe by root of steel pipe 8 through electric control system, and not only simple in structure, easy for installation, cost is low.
More than describing is the explanation to the utility model, is not the qualification to utility model, and the utility model institute restricted portion within the protection domain of the utility model, can be done any type of modification referring to claim.

Claims (3)

1. discharge mechanism that gets stuck, it is characterized in that: comprise storage rack (1), the two sides of said storage rack (1) are respectively arranged with pedestal (2), and one group of discharge mechanism that gets stuck is parallel to be connected on the pedestal (2) of storage rack (1) both sides;
The structure of the said discharge mechanism that gets stuck is following: comprise a pair of connecting panel (3), said connecting panel (3) is installed on the pedestal (2), also comprises and colludes plate, and the said plate that colludes is articulated on a pair of connecting panel (3) through bearing pin (4); Said plate one end that colludes becomes hook-shaped, and the said plate bottom of colluding is connected with cylinder through bearing pin (7).
2. the discharge mechanism that gets stuck as claimed in claim 1 is characterized in that: first colludes the hook-shaped triangularity structure of plate (5-1), and second colludes the hook-shaped squarely structure of plate (5-2).
3. the discharge mechanism that gets stuck as claimed in claim 1 is characterized in that: one group of discharge mechanism left and right sides spacing distance that gets stuck is installed on storage rack (1) the both sides pedestals (2).
CN2012200784424U 2012-03-05 2012-03-05 Clamping and discharging mechanisms Expired - Fee Related CN202518803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200784424U CN202518803U (en) 2012-03-05 2012-03-05 Clamping and discharging mechanisms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200784424U CN202518803U (en) 2012-03-05 2012-03-05 Clamping and discharging mechanisms

Publications (1)

Publication Number Publication Date
CN202518803U true CN202518803U (en) 2012-11-07

Family

ID=47101764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200784424U Expired - Fee Related CN202518803U (en) 2012-03-05 2012-03-05 Clamping and discharging mechanisms

Country Status (1)

Country Link
CN (1) CN202518803U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231914A (en) * 2013-05-08 2013-08-07 安徽江淮汽车股份有限公司 Material loading support with slide
CN108792579A (en) * 2018-07-03 2018-11-13 苏州邦勒尔自动化科技有限公司 iron core conveying device
CN111977287A (en) * 2020-08-19 2020-11-24 浙江衣拿智能科技股份有限公司 Carrier cross-floor downlink transportation system and control method thereof
CN113682790A (en) * 2021-07-28 2021-11-23 湖北文理学院 Descending machine device and steel billet conveying system
CN115246569A (en) * 2021-11-29 2022-10-28 扬州和镪金属制品有限公司 A intelligent doffer for producing tent bracing piece

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231914A (en) * 2013-05-08 2013-08-07 安徽江淮汽车股份有限公司 Material loading support with slide
CN103231914B (en) * 2013-05-08 2015-05-13 安徽江淮汽车股份有限公司 Material loading support with slide
CN108792579A (en) * 2018-07-03 2018-11-13 苏州邦勒尔自动化科技有限公司 iron core conveying device
CN108792579B (en) * 2018-07-03 2024-03-29 苏州邦勒尔自动化科技有限公司 Iron core conveying device
CN111977287A (en) * 2020-08-19 2020-11-24 浙江衣拿智能科技股份有限公司 Carrier cross-floor downlink transportation system and control method thereof
CN113682790A (en) * 2021-07-28 2021-11-23 湖北文理学院 Descending machine device and steel billet conveying system
CN115246569A (en) * 2021-11-29 2022-10-28 扬州和镪金属制品有限公司 A intelligent doffer for producing tent bracing piece

Similar Documents

Publication Publication Date Title
CN202518803U (en) Clamping and discharging mechanisms
CN103625933B (en) A kind of Cache compensation mechanism of ceramic tile stack
CN204574810U (en) A kind of fire door hydraulic lift
CN204265808U (en) Reheating furnace stepping discharging machine
CN203714305U (en) Steel bracket clamping device with double bevels
CN201506632U (en) Adjustable lifting material-blocking device
CN202394701U (en) Cylinder tension device for transformer winding wire
CN202530256U (en) Roller coiling-preventing mechanism for flat knitting machine
CN102351410A (en) Roll table transverse breaking device of float glass production line cold end
CN103449161A (en) Pneumatic drum conveying device
CN205324531U (en) Large -scale pipe part's alignment frock
CN204577994U (en) A kind of high-strength cable laying support
CN204148307U (en) A kind of buffer type hydraulic plate bending machine
CN103400653A (en) Lead frame
CN201989223U (en) Rod-free pneumatic slitter
CN205098994U (en) Safety protection device and seamless steel pipe divides material device for seamless steel pipe divides material
CN202670757U (en) Stacking device for sterilization plates
CN204503834U (en) A kind of flattener edge roll lifting Anti-blocking mechanism
CN202823912U (en) Steel billet removing device
CN204074849U (en) A kind of support roller device of profile bender
CN204237336U (en) Cable storage rack
CN203417914U (en) Retreating device of seamless steel pipe rolling machine
CN202912327U (en) Carrier roller lifting device used for tube pushing machine
CN213166719U (en) Valve terminal control group of injection mold
CN202278004U (en) Improved temper mill

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20140305