CN202509523U - Auxiliary tool for symmetrically pouring pipe ditch - Google Patents

Auxiliary tool for symmetrically pouring pipe ditch Download PDF

Info

Publication number
CN202509523U
CN202509523U CN2012201836708U CN201220183670U CN202509523U CN 202509523 U CN202509523 U CN 202509523U CN 2012201836708 U CN2012201836708 U CN 2012201836708U CN 201220183670 U CN201220183670 U CN 201220183670U CN 202509523 U CN202509523 U CN 202509523U
Authority
CN
China
Prior art keywords
steel pipe
pipe
hole
template
auxiliary tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201836708U
Other languages
Chinese (zh)
Inventor
张明生
任宗福
于潇
王光文
苏洪彬
陈琳
赵秋红
张恒德
王海洋
伏燕云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Haihe Construction Project Management Co ltd
Jinan Yellow River Bridge Constrution Group Co Ltd
Original Assignee
Jinan Huanghe Luqiao Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Huanghe Luqiao Engineering Co filed Critical Jinan Huanghe Luqiao Engineering Co
Priority to CN2012201836708U priority Critical patent/CN202509523U/en
Application granted granted Critical
Publication of CN202509523U publication Critical patent/CN202509523U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to an auxiliary tool for symmetrically pouring a pipe ditch, and the auxiliary tool comprises a left template and a right template, which are movably connected with each other through a hinge, the upper parts of the two templates are respectively provided with a left steel pipe and a right steel pipe, which are parallel to a connecting line of the two templates, the steel pipes are movably connected with the templates through a steel pipe fixed clamp, two end parts of each steel pipe are respectively provided with a through hole, the aperture of the through hole of one steel pipe is larger than that of the through hole of the other steel pipe, a supporting pipe is respectively plugged into the through holes, each supporting pipe is respectively provided with a plurality of anchoring bolt holes, and the left and the right supporting pipes are in plugging connection with each other through a plug pin which is plugged into the anchoring bolt hole. Through the effective combination of the hinge and the steel pipes, a triangular template which is free to stretch is designed, two side walls can be guaranteed to be symmetrically poured in construction, and the stress is balance. The auxiliary tool has characteristics of economy, simpleness, practicability, portability and convenience in operation.

Description

The pipe trench symmetry is built aid
Technical field
The utility model relates to a kind of instrument of building, and is specifically related to a kind of pipe trench symmetry and builds aid.
Background technology
City Buried Pipeline is designed to the pipe trench form more at present, no matter be the integral cast-in-situ or the form of prefabricated cover plate, the both sides body of wall all is one-sided building when concreting, causes pipe trench body of wall in the process of concreting to receive force unbalance, is easy to generate the crack.
Summary of the invention
In order to solve the stressed unbalanced problem of body of wall in the concreting process, the utility model provides a kind of pipe trench symmetry to build aid, can make both sides body of wall symmetry build stress balance.
The technical scheme of the utility model is following:
A kind of pipe trench symmetry is built aid; Comprise with hinge flexibly connect about two templates, its special feature is, two template top respectively is provided with a left and right sides steel pipe parallel with two template connecting lines; Said steel pipe flexibly connects through steel pipe geometrical clamp and template; The steel pipe both ends are provided with through hole respectively, and the through-hole aperture of a steel pipe is inserted with stay pipe respectively greater than the through-hole aperture of another steel pipe in the through hole; Said stay pipe is provided with some anchoring keyholes, and left and right sides stay pipe is pegged graft with the latch that inserts the anchoring keyhole.
The utility model is through effective combination of hinge and steel pipe, designed can free stretch-draw the triangle template, both sides body of wall symmetry is built stress balance when having guaranteed construction.The utlity model has economy, simplicity, practicality, portability, convenience operation.
Description of drawings
Fig. 1 is the vertical view of the utility model.
Fig. 2 is the front view of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further explanation.
A kind of pipe trench symmetry is built aid; Comprise with two templates 1 about hinge 2 flexible connections; Two template top respectively is provided with a left and right sides steel pipe 3 parallel with two template connecting lines, and said steel pipe flexibly connects through steel pipe geometrical clamp 4 and template, and the steel pipe both ends are provided with a through hole 5 respectively; The through-hole aperture of one steel pipe is greater than the through-hole aperture of another steel pipe; Be inserted with stay pipe 6 in the through hole respectively, said stay pipe 6 is provided with anchoring keyhole 7, and left and right sides stay pipe is pegged graft with the latch that inserts anchoring keyhole 78.
During concreting, the triangle template is stood on the body of wall of both sides according to developed width, bracing frame is installed, on the anchoring keyhole 7 of fine steel tube, insert latch 8 according to developed width and fix, can carry out concreting.After building completion, steel pipe is taken off, template separately, and is convenient and swift.

Claims (1)

1. a pipe trench symmetry is built aid; Comprise with hinge flexibly connect about two templates, it is characterized in that two template top respectively is provided with a left and right sides steel pipe parallel with two template connecting lines; Said steel pipe flexibly connects through steel pipe geometrical clamp and template; The steel pipe both ends are provided with through hole respectively, and the through-hole aperture of a steel pipe is inserted with stay pipe respectively greater than the through-hole aperture of another steel pipe in the through hole; Said stay pipe is provided with some anchoring keyholes, and left and right sides stay pipe is pegged graft with the latch that inserts the anchoring keyhole.
CN2012201836708U 2012-04-27 2012-04-27 Auxiliary tool for symmetrically pouring pipe ditch Expired - Lifetime CN202509523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201836708U CN202509523U (en) 2012-04-27 2012-04-27 Auxiliary tool for symmetrically pouring pipe ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201836708U CN202509523U (en) 2012-04-27 2012-04-27 Auxiliary tool for symmetrically pouring pipe ditch

Publications (1)

Publication Number Publication Date
CN202509523U true CN202509523U (en) 2012-10-31

Family

ID=47062018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201836708U Expired - Lifetime CN202509523U (en) 2012-04-27 2012-04-27 Auxiliary tool for symmetrically pouring pipe ditch

Country Status (1)

Country Link
CN (1) CN202509523U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942154A (en) * 2021-02-28 2021-06-11 广西路建工程集团有限公司 Culvert cover plate movable type support-free cast-in-place device and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942154A (en) * 2021-02-28 2021-06-11 广西路建工程集团有限公司 Culvert cover plate movable type support-free cast-in-place device and construction method thereof
CN112942154B (en) * 2021-02-28 2022-06-21 广西路建工程集团有限公司 Culvert cover plate movable type support-free cast-in-place device and construction method thereof

Similar Documents

Publication Publication Date Title
CN104452516B (en) For the instrument of the prefabricated concrete roads plate of handling
CN202787328U (en) Underground continuous wall connecting device
CN204960353U (en) Take bearing diagonal subassembly of drag hook
CN202509523U (en) Auxiliary tool for symmetrically pouring pipe ditch
CN204402030U (en) A kind of oval door opening concrete wall template
CN103643798A (en) Pouring device used for constructional column top and large- section beam column closed opening
CN2927439Y (en) Connecting structure of preset cable calandria and station
CN201605807U (en) Toilet pipe preformed hole mould
WO2009005244A3 (en) Method for burying hume pipes and support block used in the method
CN102031774A (en) V-shaped pile-slab
CN210034704U (en) Water conservancy pipeline supports connecting device
CN101250870A (en) Positioning device for filling pile reinforcement cage
CN103912289A (en) Tunnel grouting model test sequential segmented grouting device and using method thereof
CN200975106Y (en) Formwork used for pipeline sealing
CN204959733U (en) Bored concrete pile steel reinforcement cage structure
CN202866279U (en) Connecting structure for plastic formwork fixing part
CN210127578U (en) Plugging device for sleeve grouting hole
CN204875549U (en) Device is buried underground to precast box girder tabula girder iron muscle
CN204645641U (en) Construction formwork is to drawing device
CN210651199U (en) Formwork frame for building concrete pouring
CN203769789U (en) Shield constructs quick-witted reaction unit that starts in hole
CN209425801U (en) The die assembly of big cross section tube coupling
CN206844636U (en) Wall and the cast-in-place aluminum alloy pattern plate support system of superstructure
CN214573947U (en) Tubular column positioning tool
CN204282920U (en) A kind of communication tower being furnished with spliced pedestal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 3201, floor 32, North building, China Life Insurance Building, 11001 Jingshi Road, Lixia District, Jinan City, Shandong Province

Patentee after: JINAN YELLOW RIVER BRIDGE CONSTRUTION GROUP Co.,Ltd.

Address before: 250022, No. 8, building 3, sixteen Ji Zhen River Village, Li Li Town, Ji'nan City, Shandong Province

Patentee before: JINAN HUANGHE ROAD AND BRIDGE ENGINEERING Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20200413

Address after: 250000 No. 1, north section, Huanggang Road, Tianqiao District, Shandong, Ji'nan

Patentee after: Jinan Haihe Construction Project Management Co.,Ltd.

Address before: 3201, floor 32, North building, China Life Insurance Building, 11001 Jingshi Road, Lixia District, Jinan City, Shandong Province

Patentee before: JINAN YELLOW RIVER BRIDGE CONSTRUTION GROUP Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20121031

CX01 Expiry of patent term