CN202466525U - Cement-sand-gravel dam - Google Patents

Cement-sand-gravel dam Download PDF

Info

Publication number
CN202466525U
CN202466525U CN2011203776980U CN201120377698U CN202466525U CN 202466525 U CN202466525 U CN 202466525U CN 2011203776980 U CN2011203776980 U CN 2011203776980U CN 201120377698 U CN201120377698 U CN 201120377698U CN 202466525 U CN202466525 U CN 202466525U
Authority
CN
China
Prior art keywords
dam
impervious barrier
gravel
cement sand
spua
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203776980U
Other languages
Chinese (zh)
Inventor
贾金生
张国新
刘毅
张磊
李炳奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Institute of Water Resources and Hydropower Research
Original Assignee
China Institute of Water Resources and Hydropower Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Institute of Water Resources and Hydropower Research filed Critical China Institute of Water Resources and Hydropower Research
Priority to CN2011203776980U priority Critical patent/CN202466525U/en
Application granted granted Critical
Publication of CN202466525U publication Critical patent/CN202466525U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

A cement-sand-gravel dam is disclosed. Impervious layers, which are disposed on surfaces of an upper stream and a lower stream of a dam body, are polyureas elastomer impervious layers obtained by using the rotary spraying film construction method or other construction methods. In case of necessity, polyureas elastomer impervious layers can be disposed on all water stop and overflowing surfaces of the dam body. The polyureas is a waterproof, anti-corrosion, anti-punching, wear resistant, wet-slip resistant, and heatproof material, and has advantages of zero VOC, rapid solidification, excellent physical and chemical mechanical properties, high construction efficiency, and ability of meeting the needs of environmental protection. The impervious performance of the cement-sand-gravel dam can be greatly improved by adopting the polyureas elastomer impervious layers.

Description

A kind of cement sand and gravel dam
Technical field
The utility model relates to the technical field of hydraulic engineering, particularly a kind of cement sand and gravel dam.
Background technology
The cement sand and gravel dam is a kind of new dam type that on face dam and Compacted Concrete Gravity Dam Section basis, grows up, and is characterized in adopting the cement sand and gravel material to build a dam, and uses high efficiency cubic metre of earth and stone Transport Machinery and compacting machinary construction.Because the gelatification of cement has increased the shear strength of material, compare with face dam and can dwindle the dam body section, and flood spillway can be set at dam crest; Owing to used the continuous job practices of earth and rockfill dam, compare with RCCD and can simplify construction, reduction of erection time and reduce expense in addition.Cement sand and gravel dam dam material obtains easily, mix is simple, cement consumption is few, and not only the economic security but also the material abandoned that can make full use of in the work progress reduce the influence to surrounding environment.The cement sand and gravel dam is lower to the requirement of dam material, construction technology and the dam foundation; Big construction is basic to realize that zero abandons material; Highlighted in the advantage that conforms, alleviates aspect the environmental disruption, added the low attention that has begun to obtain international Ba Gongjie of short cost of its duration.
But people find in to the concrete dam Study on durability: constuction joint face and structural joint face seepage are to influence the impervious key factor of dam body, become the central core of circulation of infiltration.Such as adhesive surface of the aspect of building, seam face and the New-old concrete of dam etc., these positions often become cracking resistance, antiskid and impervious weak link under the influence of factors such as thermal stresses and environment.In addition, the cement sand and gravel material aggregate is without the flushing screening, and permeability resistance is relatively poor, and gel material content is low, and the admixture volume is higher, Ca in the hydrated product (OH) 2Therefore content is few, and under the effect of press water prolonged permeation, cement sand and gravel dam material performance can decrease, and the quality of its anti-permeability performance directly influences the safety and the reliability of this class formation, and is most important to the stablizing of total, cracking resistance etc.The leakage preventing structure of tradition dam is to adopt cement mortar or impervious good concrete mostly; This structure corrosion resistance and cracking resistance are all limited; Particularly, will destroy its antiseepage function to some extent owing to reasons such as construction quality and operation maintenance may produce the crack.In addition, for the cement sand and gravel dam, speed of application is its remarkable advantage soon, and traditional leakage preventing structure will have a strong impact on its speed of application.Therefore the antiseepage problem on cement sand and gravel dam becomes its fast-developing key factor of restriction.
Summary of the invention
The technical problem that the utility model will solve provides the strong cement sand and gravel dam of a kind of barrier performance.
The technical scheme that addresses the above problem is: this cement sand and gravel dam is provided with the SPUA impervious barrier at the upstream and downstream face of dam body.
In case of necessity, also can be provided with the SPUA impervious barrier at the whole dash and the flow-passing surface of dam body.
Because polyureas is a kind of waterproof, anticorrosion, impact-resisting wear-resisting, anti-slippery, heat-resisting material; Has zero VOC (Volatile Organic Compounds; VOC), meet environmental protection, solidify fast, the physics and chemistry mechanical property is excellent, high efficient construction, adopts this impervious barrier can significantly improve the barrier performance on cement sand and gravel dam.
Description of drawings
Fig. 1 be according to an embodiment of the utility model the position view of impervious barrier.
Specific embodiments
Before the Spray Polyurea Elastomer impervious barrier, should adopt instruments such as angle grinding machine, giant that concrete surface is handled.Adopt giant to dash hair, pressure should be controlled between 5MPa~40MPa.
Fig. 1 is that the position view according to the impervious barrier of an embodiment of the utility model shows the surface that dam body contacts and possibly contact with current.This cement sand and gravel dam is provided with impervious barrier 3 on the upstream and downstream surface of dam body, and this impervious barrier is the SPUA impervious barrier that adopts churning film worker method.The spraying scope of this impervious barrier runs through the left bank to right bank, spraying highly can be at check flood level 2 downward h places at the bottom of the dam elevation 4 places.H is a safety water head, and its design formulas is following:
h = σ w kρg
σ wherein wThe anti-permeability strength of-cement sand and gravel
The k-safety factor
The density of ρ-water
G-acceleration of gravity
So, elevation-safety water head (as shown in Figure 1) at the bottom of dam body spraying height=check flood level-dam.
In addition; Consider that construction quality is uneven; For the relatively poor engineering of construction quality, should improve its safety factor, increase its spraying scope; Can consider whole dash of dam body and flow-passing surface spray polyurea material in case of necessity, promptly be provided with and adopt churning film worker's method or hand to scrape the SPUA impervious barrier of worker's method.Can certainly adopt general spraying process.
Preferably, the location of cracks on the surface between upstream and downstream is provided with and adopts churning film worker's method or hand to scrape the SPUA of worker's method.Can certainly adopt general spraying process.Need be for transverse joint 1 and existing location of cracks thickness according to wide definite its thickness of seam.Need carry out specially treated during in addition, for transverse joint and the spraying of other privileged sites.
Preferably, be provided with employing churning film worker's method or hand on the surface of flood spillway, aperture, dam body spillwag chute and scrape the SPUA impervious barrier of worker's method.Can certainly adopt general spraying process.
Preferably, safety water head smaller or equal to 50 meters situation under the thickness of impervious barrier be 2 millimeters, safety water head greater than 50 meters situation under the thickness of 50 meters impervious barriers of the every increase of safety water head increase by 1 millimeter.That is it is 3 millimeters, if safety water head equals the thickness of impervious barrier under 100 meters the situation.
The beneficial effect of the utility model had both comprised that cement sand and gravel dam construction technology was simple, and dam material is easy to get, and made full use of to abandon to expect to alleviate environmental disruption; The aquation temperature rise is low, and on-the-spot quality control is easy, is fit to mechanized construction; Advantages such as speed of application is fast, and cost is low, the polyurea materials of cooperation spraying " churning film " worker's method; In energy-conserving and environment-protective, successfully solve its antiseepage problem, and have both anticorrosion, impact-resisting wear-resisting, advantage such as anti-slippery, heat-resisting." churning film " worker's method has also overcome the drum of having filmed, basal plane that polyurea materials and construction technology deficiency the cause problem such as bad of peeling off, harden, and makes that this The Application of Technology is more secure.The determined spraying scope of the utility model, coating thickness have guaranteed that this has reasonability, economy and the safety on polyureas impervious barrier cement sand and gravel dam.
The above; It only is the preferred embodiment of the utility model; Be not that the utility model is done any pro forma restriction; Every technical spirit according to the utility model all still belongs to the protection domain of the utility model technical scheme to any simple modification, equivalent variations and modification that above embodiment did.

Claims (10)

1. cement sand and gravel dam, it is characterized in that: the upstream and downstream face at dam body is provided with the SPUA impervious barrier.
2. cement sand and gravel according to claim 1 dam is characterized in that: impervious barrier is to adopt churning film worker's method or hand to scrape the SPUA impervious barrier of worker's method.
3. cement sand and gravel according to claim 1 dam is characterized in that: the location of cracks on the upstream and downstream surface is provided with the SPUA impervious barrier.
4. cement sand and gravel according to claim 3 dam is characterized in that: impervious barrier is to adopt churning film worker's method or hand to scrape the SPUA impervious barrier of worker's method.
5. cement sand and gravel according to claim 3 dam is characterized in that: the surface at flood spillway, aperture, dam body spillwag chute is provided with the SPUA impervious barrier.
6. cement sand and gravel according to claim 5 dam is characterized in that: impervious barrier is to adopt churning film worker's method or hand to scrape the SPUA impervious barrier of worker's method.
7. according to each described cement sand and gravel dam of claim 1-6; It is characterized in that: safety water head smaller or equal to 50 meters situation under the thickness of impervious barrier be 2 millimeters, safety water head greater than 50 meters situation under the thickness of 50 meters impervious barriers of the every increase of safety water head increase by 1 millimeter.
8. cement sand and gravel dam, it is characterized in that: whole dash and flow-passing surface at dam body are provided with the SPUA impervious barrier.
9. cement sand and gravel according to claim 8 dam is characterized in that: this impervious barrier is to adopt churning film worker's method or hand to scrape the SPUA impervious barrier of worker's method.
10. cement sand and gravel according to claim 8 dam; It is characterized in that: safety water head smaller or equal to 50 meters situation under the thickness of impervious barrier be 2 millimeters, safety water head greater than 50 meters situation under the thickness of 50 meters impervious barriers of the every increase of safety water head increase by 1 millimeter.
CN2011203776980U 2011-09-29 2011-09-29 Cement-sand-gravel dam Expired - Fee Related CN202466525U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203776980U CN202466525U (en) 2011-09-29 2011-09-29 Cement-sand-gravel dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203776980U CN202466525U (en) 2011-09-29 2011-09-29 Cement-sand-gravel dam

Publications (1)

Publication Number Publication Date
CN202466525U true CN202466525U (en) 2012-10-03

Family

ID=46914693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203776980U Expired - Fee Related CN202466525U (en) 2011-09-29 2011-09-29 Cement-sand-gravel dam

Country Status (1)

Country Link
CN (1) CN202466525U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505667A (en) * 2011-09-29 2012-06-20 中国水利水电科学研究院 Cemented gravel dam
CN104695455A (en) * 2015-03-06 2015-06-10 华能澜沧江水电股份有限公司 High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102505667A (en) * 2011-09-29 2012-06-20 中国水利水电科学研究院 Cemented gravel dam
CN104695455A (en) * 2015-03-06 2015-06-10 华能澜沧江水电股份有限公司 High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN202787333U (en) Concrete surface protection structure of marine construction
CN207499173U (en) A kind of waterproof construction based on cement based penetration crystallization type water proofing paint layer
CN100439600C (en) Treatment method of newly built high way railway engineering soft foundation
CN103643656A (en) High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body
CN102505667A (en) Cemented gravel dam
CN104153401A (en) Waterproof construction method for anti-floating anchor rods
CN104652371B (en) The glue of crossing set up based on old dam coagulates rock-fill dams and construction method thereof
CN101435192A (en) New and old concrete combining construction method
CN202466525U (en) Cement-sand-gravel dam
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN106884436A (en) A kind of construction method of the waterproof connecting structure of foundation ditch uplift pile and structure base slab
CN101560777A (en) Waterproof construction method for bottom plate of basement with anti-float anchor rod
CN102322042A (en) Rockfill concrete dam
CN202175936U (en) Rock-mounded concrete dam
CN104963323B (en) A kind of chain prefabricated section mask anti-scour trench
CN202181540U (en) RCC (roller compacted concrete) arch dam
CN102108691A (en) High polymer curtain grouting drilling tool and hole pattern construction method
CN208395869U (en) Using the offshore pile basis Anti-scouring structure of concrete platoon
CN103061352A (en) Salt lake region bridge foundation concrete anticorrosion structure and construction method
CN202170499U (en) Grouted stone masonry dam
CN203768869U (en) Slip mat type connector structure between bituminous concrete impervious body and foundation concrete of dam
CN108643132B (en) Rolled concrete structure with composite slurry injected into stone slag material and construction method thereof
CN103334425B (en) Joint protection structure of anti-corrosion hollow square pile
CN203361135U (en) Adapter protection structure of corrosion-resistant hollow square pile
CN208055783U (en) A kind of concrete road surface structure being arranged on geomembrane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20130929