CN202462594U - Steam curing pool for prefabricated part - Google Patents

Steam curing pool for prefabricated part Download PDF

Info

Publication number
CN202462594U
CN202462594U CN 201220070223 CN201220070223U CN202462594U CN 202462594 U CN202462594 U CN 202462594U CN 201220070223 CN201220070223 CN 201220070223 CN 201220070223 U CN201220070223 U CN 201220070223U CN 202462594 U CN202462594 U CN 202462594U
Authority
CN
China
Prior art keywords
pond
maintenance
steel plate
steam curing
curing pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220070223
Other languages
Chinese (zh)
Inventor
吴建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongji Pile Industry Co Ltd
Original Assignee
Shanghai Zhongji Pile Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongji Pile Industry Co Ltd filed Critical Shanghai Zhongji Pile Industry Co Ltd
Priority to CN 201220070223 priority Critical patent/CN202462594U/en
Application granted granted Critical
Publication of CN202462594U publication Critical patent/CN202462594U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a steam curing pool for a prefabricated part. The steam curing pool for the prefabricated part comprises a curing pool and a pool cover positioned at the top of the curing pool, and is characterized in that winches are respectively arranged at both sides of the curing pool, and guide rails are arranged at the bottom of the curing pool; and movably steel sheets are arranged on the guide rails, and are connected with the winches through steel wire ropes. The steam curing pool for the prefabricated part has the beneficial effects that the structure is simple, the design is skillful, and the size of the internal space of the curing pool can be changed according to actual needs, and thus the consumption of steam is reduced, and the cost is saved.

Description

A kind of prefabricated components steam curing pond
Technical field
The utility model relates to a kind of novel maintenance pond that prefabricated components are produced that is used for.
Background technology
At present, in order to improve the intensity of prefabricated pile fast, excite the chemical property of Binder Materials in the production procedure of pile tube and side's stake industry, be unable to do without this link of steam curing.Steam curing mainly is the goods behind the centrifugal forming and punching block to be put into the maintenance pond add a cover and feed steam and carry out maintenance, and this process duration is longer, needs to consume a large amount of steam.It is existing that nowadays the size in each maintenance pond on same production line all is identical, and the size of punching block and inconsistent.In the production usually the punching block of size enter same maintenance pond, so just caused that the space is not fully utilized in maintenance the pond in, having consumed many steam in vain more.And steam is from the boiler room burning coal, and this process has strengthened environmental pollution undoubtedly.
In sum, to the defective of prior art, need a kind of prefabricated components steam curing pond especially, with the problem of mentioning more than solving.
The utility model content
The purpose of the utility model is to provide a kind of prefabricated components steam curing pond, through setting up the moveable steel plate in inside, maintenance pond, thereby changes the inner space size in maintenance pond, thereby realizes the purpose of the utility model.
The technical problem that the utility model solved can adopt following technical scheme to realize:
A kind of prefabricated components steam curing pond comprises maintenance pond and the Chi Gai that is positioned at top, maintenance pond, it is characterized in that; Both sides in said maintenance pond are respectively arranged with hoist engine; Bottom, said maintenance pond is equipped with guide rail, and guide rail is provided with movable steel plate, and movable steel plate connects hoist engine through steel wire rope.
In an embodiment of the utility model, said movable steel plate is processed hollow form, and guide wheel is equipped with in the bottom, is provided with elaxtic seal around the steel plate.
In an embodiment of the utility model, said movable steel plate is connected through steel wire rope, fixed pulley with hoist engine, and steel wire rope is arranged in inwall, bottom along the maintenance pond.
In an embodiment of the utility model, the groove that the inwall setting in said maintenance pond provides steel wire rope to move has the covering channel-section steel on the groove.
The beneficial effect of the utility model is: simple in structure, design ingeniously, and can change the inner space size in maintenance pond according to the actual requirements, thereby reduce the consumption of steam, practiced thrift cost.
Description of drawings
Fig. 1 is the side sectional view in the described novel maintenance of the utility model pond.
Fig. 2 is the front section view in the described novel maintenance of the utility model pond.
Fig. 3 is the vertical view in the described novel maintenance of the utility model pond.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, below in conjunction with the specific embodiment, further set forth the utility model.
Referring to Fig. 1, the external motive device hoist engine 1,6 in maintenance pond is connected to the both sides bottom of steel plate 9 through steel wire rope 2 fixed pulleys 3,5, and guide wheel 8 is equipped with in steel plate 9 bottoms, and guide wheel can move around along guide rail 7.In order to improve the stability and the high accuracy of steel plate operation, guide wheel adopts bilateral location, and four guide wheels are installed to keep steel plate stable in the steel plate bottom.So just can drive steel plate through the rotation of outside hoist engine moves around.
Referring to Fig. 2, carry out in the production adding pond lid 1 after the preceding elder generation of maintenance moves to suitable position with steel plate 4, do main accuracy like this in order to operate.Steel plate 4 links to each other with pond lid 1, maintenance pond concrete inner wall 3 after adding a cover, and fill through elastic washer 2 in middle slit.
Referring to Fig. 3, in the time of increasing maintenance pond usage space, can make hoist engine 5 rotations and spur steel plates 2 near maintenance pond inwall 3 through steel wire rope 4, fixed pulley 6.When increasing the space, hoist engine 1 is rotated and through steel wire rope 7, fixed pulley 9, be pulled away from maintenance pond inwall 3. Steel wire rope 4,7 shown in the figure has part to be distributed in maintenance pond bottom, rubs with punching block 8 when not influencing steel plate 2 mobile, and available channel-section steel covers.
The utility model has changed traditional maintenance pond and has unified the way that size is built; An inwall in maintenance pond can be moved freely; Can farthest improve the utilization rate of inner space, maintenance pond so that the independent varying sized size of pond punching block length can both be gone into according to maximum in each maintenance pond like this.Go into pond punching block size hour, can move a side inwall by post personnel's free operant, reduce inner space, maintenance pond size greatly, employed like this steam consumption just can reduce.If can reasonably arrange scheduling, can make the close punching block of dimensions go into same maintenance pond in the production, effect is more obvious like this.If the stub demand increases on the market sometime, the utility model effect is more obvious.
More than show and described basic principle of the utility model and the advantage of principal character and the utility model.The technical staff of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the specification that the utility model just is described; Under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications, and these variations and improvement all fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (4)

1. prefabricated components steam curing pond; Comprise maintenance pond and the Chi Gai that is positioned at top, maintenance pond; It is characterized in that, be respectively arranged with hoist engine in the both sides in said maintenance pond, bottom, said maintenance pond is equipped with guide rail; Guide rail is provided with movable steel plate, and movable steel plate connects hoist engine through steel wire rope.
2. a kind of prefabricated components steam curing according to claim 1 pond is characterized in that said movable steel plate is processed hollow form, and guide wheel is equipped with in the bottom, is provided with elaxtic seal around the steel plate.
3. a kind of prefabricated components steam curing according to claim 1 pond is characterized in that said movable steel plate is connected through steel wire rope, fixed pulley with hoist engine, and steel wire rope is arranged in inwall, bottom along the maintenance pond.
4. a kind of prefabricated components steam curing according to claim 1 pond is characterized in that the groove that the inwall setting in said maintenance pond provides steel wire rope to move has the covering channel-section steel on the groove.
CN 201220070223 2012-02-28 2012-02-28 Steam curing pool for prefabricated part Expired - Fee Related CN202462594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220070223 CN202462594U (en) 2012-02-28 2012-02-28 Steam curing pool for prefabricated part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220070223 CN202462594U (en) 2012-02-28 2012-02-28 Steam curing pool for prefabricated part

Publications (1)

Publication Number Publication Date
CN202462594U true CN202462594U (en) 2012-10-03

Family

ID=46910786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220070223 Expired - Fee Related CN202462594U (en) 2012-02-28 2012-02-28 Steam curing pool for prefabricated part

Country Status (1)

Country Link
CN (1) CN202462594U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104045012A (en) * 2014-06-28 2014-09-17 安徽省神洲建材科技有限公司 Traction device of steam-curing trolley
CN111496992A (en) * 2019-01-31 2020-08-07 天津北方首创建筑工程试验检测有限公司 Constant temperature and humidity standard maintenance system
CN113084983A (en) * 2021-03-11 2021-07-09 建华建材(安徽)有限公司 Steam curing pool for processing concrete pile
CN115070920A (en) * 2022-06-23 2022-09-20 成都蜀源港泰新型建材有限公司 Vertical concrete member curing means

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104045012A (en) * 2014-06-28 2014-09-17 安徽省神洲建材科技有限公司 Traction device of steam-curing trolley
CN111496992A (en) * 2019-01-31 2020-08-07 天津北方首创建筑工程试验检测有限公司 Constant temperature and humidity standard maintenance system
CN113084983A (en) * 2021-03-11 2021-07-09 建华建材(安徽)有限公司 Steam curing pool for processing concrete pile
CN115070920A (en) * 2022-06-23 2022-09-20 成都蜀源港泰新型建材有限公司 Vertical concrete member curing means
CN115070920B (en) * 2022-06-23 2024-02-13 成都蜀源港泰新型建材有限公司 Vertical concrete member curing means

Similar Documents

Publication Publication Date Title
CN202462594U (en) Steam curing pool for prefabricated part
CN203162821U (en) Liftable solar street lamp
CN205819688U (en) Carton box opening device
CN201390574Y (en) Slip-ring type internal motor cable winch
CN203429644U (en) Tension force and pressure dispersed type anchor cable bearing plate
CN202324567U (en) Moving type large-scale operation platform
CN203874318U (en) Novel climbing-assisting device
CN202304430U (en) Automatic feeding device of aluminum smelting furnace
CN202508723U (en) Novel construction lifter
CN202915389U (en) Coal feeding device of steam furnace
CN202299061U (en) Reinforced concrete honeycomb core
CN202296763U (en) Gantry crane installation structure installed on door head
CN202880727U (en) Lifting device for large lifting platform
CN205753327U (en) A kind of Novel high-voltage cable feeder pillar
CN203487536U (en) Concrete feeding machine
CN204511493U (en) A kind of throttle locking device
CN202922162U (en) Integration support frame for gear of wind-driven generator
CN203173735U (en) Remote manual brake-releasing device
CN204330105U (en) A kind of novel automatic goods weigher device for railway warehouse
CN202785194U (en) Lug plate pull-rod type speed reducer of building lift
CN204369457U (en) For installing the Transporting equipment of gates of segmental shape
CN202181156U (en) Hopper lifting machine
CN205933115U (en) From hoisting device
CN202924300U (en) Outdoor transport vehicle
CN202130924U (en) Rope guiding mechanism of rope coiling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20180228

CF01 Termination of patent right due to non-payment of annual fee