CN202452925U - High-precision measurement structure of jacking displacement amount in non-electric-hydraulic-control building jacking engineering - Google Patents

High-precision measurement structure of jacking displacement amount in non-electric-hydraulic-control building jacking engineering Download PDF

Info

Publication number
CN202452925U
CN202452925U CN2011205386255U CN201120538625U CN202452925U CN 202452925 U CN202452925 U CN 202452925U CN 2011205386255 U CN2011205386255 U CN 2011205386255U CN 201120538625 U CN201120538625 U CN 201120538625U CN 202452925 U CN202452925 U CN 202452925U
Authority
CN
China
Prior art keywords
jacking
counter
nut
force
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205386255U
Other languages
Chinese (zh)
Inventor
卫龙武
章文舒
王科伟
陈文海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HONGJI TECHNOLOGY Co Ltd
Original Assignee
JIANGSU HONGJI TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HONGJI TECHNOLOGY Co Ltd filed Critical JIANGSU HONGJI TECHNOLOGY Co Ltd
Priority to CN2011205386255U priority Critical patent/CN202452925U/en
Application granted granted Critical
Publication of CN202452925U publication Critical patent/CN202452925U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a high-precision measurement structure of a jacking displacement amount in non-electric-hydraulic-control building jacking engineering, which not only provides a condition for mounting a high-precision measurement tool, namely a dial indicator, but also can construct a necessary environment of the jacking engineering. With regard to a building with n jacking points, jacking equipment which is distributed at each jacking point of the building comprises a framework of a jacking stand column, a bracket manufactured at the bottom of the jacking stand column, a jack and the dial indicator. The framework of the jacking stand column is constructed by surrounding a stand column to be jacked, and the condition for mounting the dial indicator and forms an upper end counter force point of a suspended jacking stand column is provided. In a jacking process, the bracket manufactured at the bottom of the jacking stand column provides a measurement platform of a dial indicator measurement rod and provides a lower end counter force point of the suspended jacking stand column when the jack changes a route. The jack is used for ejecting the stand column of the building. The dial indicator is mounted on the framework of the jacking stand column; and the measurement rod of the dial indicator is contacted with the measurement platform at the part of the bracket of the jacking stand column and is used for measuring the jacking displacement amount.

Description

Jacking displacement high-acruracy survey structure in the non-electro-hydraulic control buildings jacking engineering
Technical field
What the utility model patent related to is a kind of structure of carrying out precision measurement to non-electro-hydraulic control buildings jacking process, belongs to field of measuring technique.
Background technology
Buildings jacking engineering refers to: the engineering of carrying out " lifting " with jack pair monolithic architecture thing.
The operation of buildings jacking engineering is at present: 1) the buildings bottom is blocked.2) settle some lifting jack on column at the bottom of the buildings.3) mode with hydraulic pressure imposes the power that stretch on the top to each lifting jack simultaneously.When 4) each jack piston rod all stretches out, just accomplished " jacking impulse stroke " of buildings.5) complete jacking engineering is made up of a plurality of " jacking impulse strokes ".
Generally place a lifting jack, and impose power and carry out jacking at each Jacking point of buildings bottom.Yet the load capacity of each Jacking point of buildings is different.And the load capacity that in the jacking process, receives various factors to influence each Jacking point also can change.Difference and uncertainty that this has just caused each lifting jack load make the process of each Jacking point produce difference.This difference has caused the strain (i.e. distortion) of buildings base cross members or bottom bearing wall.When it surpassed certain value, buildings base cross members or bottom bearing wall will be damaged, even fracture.In whole building jacking process, require the jacking displacement one of each lifting jack of the control jacking speed of making peace to satisfy the speed setting value requirement that project engineering stage is drafted so that the jacking process of engineering synchronously with steadily.
At present in the buildings jacking engineering of non-electro-hydraulic control.Synchronous in order to control each lifting jack jacking displacement, the operating personnel on each Jacking point position observe the jacking process of Jacking point separately by means of " milimeter scale " of a fixed position.In this case, the measuring accuracy of engineering is limited on the rank of millimeter.Can not satisfy the engineering that some is had relatively high expectations to the jacking process synchronously.
Summary of the invention
In order to solve the problems referred to above that exist in the prior art, the utility model proposes jacking displacement high-acruracy survey structure in a kind of non-electro-hydraulic control buildings jacking engineering, it is characterized in that comprising the n group Lifting Equipment of each Jacking point that is distributed in buildings; Said Lifting Equipment comprises framework, bottom bracket, dial gauge, lifting jack;
Said framework is around being built by the jacking column, and framework comprises the suspension nut of H steel vertical beam, counter-force crossbeam, counter-force crossbeam nut, reinforcement, counter-force joist, counter-force joist nut, jacking column, the nut of suspension jacking column;
Said H steel vertical beam has 2, and symmetry is located at by the both sides of jacking column;
Said counter-force crossbeam is connected between the two H steel vertical beams; The screw that said counter-force crossbeam is provided with, said suspension nut passes this screw, and the top of suspension nut is connected on the counter-force crossbeam through counter-force joist nut;
The bottom bracket is connected by the bottom of jacking column; The bottom bracket is provided with the through hole that is used to pass the suspension nut, and said suspension nut passes this through hole, and said jacking column flag nut is spun on the suspension nut of bracket below, bottom of jacking column;
Said counter-force joist is provided with the through hole that is used to pass the suspension nut, and said suspension nut passes this through hole, and the nut of said suspension jacking column is above the counter-force joist;
Said lifting jack is located between the bottom bracket and counter-force joist of jacking column, and the piston rod of lifting jack withstands on bracket bottom surface, bottom; Be rotary with counter-force joist nut on the suspension nut of counter-force joist below.
Said dial gauge is installed on the H steel vertical beam, and the sounding rod of dial gauge contacts on the surface measurements of bottom bracket.
Also comprise reinforcement, reinforcement is connected between the two H steel vertical beams, and below the counter-force crossbeam; Said reinforcement be provided with the counter-force crossbeam on the corresponding screw of screw, said suspension nut passes this screw.
Also comprise the dial gauge magnet base, dial gauge is installed on the dial gauge magnet base, and the dial gauge magnet base is installed on the mode of magnetic on the H steel vertical beam of framework of jacking column.
Said bottom bracket is the concrete component of made before the jacking engineering construction.
The utility model is the high-precision measurement structure of jacking displacement in a kind of non-electro-hydraulic control buildings jacking engineering.This structure can make up the necessary environment of jacking engineering, again the condition that high-precision survey instrument dial gauge is installed can be provided.
The framework of jacking column is around being built by the jacking column.It had both made up the necessary environment of suspention jacking column in the jacking engineering, again the condition that high-precision survey instrument dial gauge is installed can be provided.The bracket that the bottom of said jacking column makes is before the jacking engineering is carried out; The concrete member of making in jacking column bottom, it provides the measuring table of dial gauge sounding rod and the jacking column is draped when lifting jack line feed journey is provided counter-force point in the jacking process.Said lifting jack is in order to the power-equipment of the column of jacking buildings, and it is located between the bottom bracket and counter-force joist of jacking column, and its piston rod withstands on by the bracket bottom surface of jacking column.Said dial gauge has comprised the table body of dial gauge magnet base and dial gauge.The dial gauge magnet base is installed on the mode of magnetic on the perpendicular frame of H steel of framework of jacking column; The table body earrings of dial gauge is installed on the dial gauge magnet base; On the sounding rod contact of dial gauge and the measuring table at jacking upright column bracket position, to measure by the resetting of post amount of jacking.By means of high-precision survey instrument dial gauge, the utility model is under the preceding topic of having accomplished the necessary environment that makes up non-electro-hydraulic control buildings jacking engineering, for high-precision measurement means is provided in the engineering.
Description of drawings
Fig. 1 .1 is the scheme of installation figure of dial gauge and jacking column frame in the utility model.
Fig. 1 .2 is the A-A diagrammatic cross-section of Fig. 1 .1;
Fig. 1 .3 is the B-B diagrammatic cross-section of Fig. 1 .1;
Among the figure, by nut 9, lifting jack 10, counter-force joist 11, counter-force joist nut 12, manual governing valve 13, lifting jack oil inlet pipe 14, the lifting jack scavenge pipe 15 of jacking column 1, suspension nut 2, bottom bracket 3, counter-force crossbeam 4, H steel vertical beam 5, reinforcement 6, dial gauge 7, dial gauge magnet base 8, suspension jacking column.
Embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified as follows:
Fig. 1 .1~1.3; For the engineering that n Jacking point position arranged; The present technique scheme has comprised the n group equipment in the engineering, and every group equipment comprises: nut, dial gauge magnet base, dial gauge, the lifting jack of the suspension nut of H steel vertical beam, counter-force crossbeam, counter-force crossbeam nut, reinforcement, counter-force joist, counter-force joist nut, jacking column, suspension jacking column.Manual governing valve, lifting jack oil inlet pipe, lifting jack scavenge pipe.
Made up the framework of jacking column by H steel vertical beam, counter-force crossbeam, reinforcement and counter-force joist.
H steel vertical beam is in order to support the framework of jacking column, and the counter-force crossbeam supplies suspention jacking column counter-force in order to constitute; Reinforcement is in order to reinforce the framework of jacking column.The suspension nut of jacking column vertically passes the reach through hole on reach through hole on the counter-force crossbeam, the reach through hole on the reinforcement, the jacking upright column bracket position, the reach through hole on the counter-force joist.Lifting jack places on the plane of counter-force joist.Counter-force joist nut when the process of jacking is carried out, forms counter-force joist location to hold by the counter-force of jacking column.When lifting jack changes jobs stroke (that is: lifting jack shrinks the piston rod of full scale jacking), counter-force joist nut is up moved.Make on the counter-force joist and move, so that set up the counter-force point of next jacking impulse stroke.The nut of suspension jacking column be used for lifting jack line feed journey (piston rod of the lifting jack that at this moment is retracted has broken away from by the column of jacking, and the counter-force joist also moves on to the position on not) intermittently in, suspension is lived by the column of jacking.Lifting jack is in order to produce the power of jacking buildings column, stretches out the buildings column by jacking along with jack piston rod.In the jacking process, the jacking column is to top offset, and it is motionless that the nut of suspension jacking column rests on original position, and the jacking column has left the nut of suspension jacking column gradually, and this nut does not stress.It does not influence by the upwards displacement movement of jacking column, and when lifting jack changed jobs stroke, the nut rotation direction top of suspension jacking column was in order to hang by the column of jacking.Counter-force joist nut rotation direction top is in order to again to the location of counter-force joist.
The magnet base of dial gauge is installed on the H steel vertical beam with the mode of magnetic, and follows each time " jacking impulse stroke " constantly along H steel vertical beam upward displacement.(that is: lifting jack is changed impulse stroke each time; Percentage just table magnet base just once along H steel vertical beam upward displacement) the table body earrings of dial gauge is installed on the dial gauge magnet base; On the sounding rod contact of dial gauge and the platform at jacking upright column bracket position, to measure by the resetting of post amount of jacking.
Said bottom bracket is the concrete component of made before the jacking engineering construction.

Claims (4)

1. jacking displacement high-acruracy survey structure in the non-electro-hydraulic control buildings jacking engineering is characterized in that comprising the n group Lifting Equipment of each Jacking point that is distributed in buildings; Said Lifting Equipment comprises framework, bottom bracket, dial gauge, lifting jack;
Said framework is around being built by the jacking column, and framework comprises the suspension nut of H steel vertical beam, counter-force crossbeam, counter-force crossbeam nut, reinforcement, counter-force joist, counter-force joist nut, jacking column, the nut of suspension jacking column;
Said H steel vertical beam has 2, and symmetry is located at by the both sides of jacking column;
Said counter-force crossbeam is connected between the two H steel vertical beams; The screw that said counter-force crossbeam is provided with, said suspension nut passes this screw, and the top of suspension nut is connected on the counter-force crossbeam through counter-force joist nut;
The bottom bracket is connected by the bottom of jacking column; The bottom bracket is provided with the through hole that is used to pass the suspension nut, and said suspension nut passes this through hole, and said jacking column flag nut is spun on the suspension nut of bracket below, bottom of jacking column;
Said counter-force joist is provided with the through hole that is used to pass the suspension nut, and said suspension nut passes this through hole, and the nut of said suspension jacking column is above the counter-force joist;
Said lifting jack is located between the bottom bracket and counter-force joist of jacking column, and the piston rod of lifting jack withstands on bracket bottom surface, bottom; Be rotary with counter-force joist nut on the suspension nut of counter-force joist below.
Said dial gauge is installed on the H steel vertical beam, and the sounding rod of dial gauge contacts on the surface measurements of bottom bracket.
2. jacking displacement high-acruracy survey structure in the non-electro-hydraulic control buildings jacking engineering according to claim 1 is characterized in that comprising reinforcement, and reinforcement is connected between the two H steel vertical beams, and below the counter-force crossbeam; Said reinforcement be provided with the counter-force crossbeam on the corresponding screw of screw, said suspension nut passes this screw.
3. jacking displacement high-acruracy survey structure in the non-electro-hydraulic control buildings jacking engineering according to claim 1; It is characterized in that comprising the dial gauge magnet base; Dial gauge is installed on the dial gauge magnet base, and the dial gauge magnet base is installed on the mode of magnetic on the H steel vertical beam of framework of jacking column.
4. jacking displacement high-acruracy survey structure in the non-electro-hydraulic control buildings jacking engineering according to claim 1 is characterized in that said bottom bracket is the concrete component of made before the jacking engineering construction.
CN2011205386255U 2011-12-21 2011-12-21 High-precision measurement structure of jacking displacement amount in non-electric-hydraulic-control building jacking engineering Expired - Fee Related CN202452925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205386255U CN202452925U (en) 2011-12-21 2011-12-21 High-precision measurement structure of jacking displacement amount in non-electric-hydraulic-control building jacking engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205386255U CN202452925U (en) 2011-12-21 2011-12-21 High-precision measurement structure of jacking displacement amount in non-electric-hydraulic-control building jacking engineering

Publications (1)

Publication Number Publication Date
CN202452925U true CN202452925U (en) 2012-09-26

Family

ID=46868784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205386255U Expired - Fee Related CN202452925U (en) 2011-12-21 2011-12-21 High-precision measurement structure of jacking displacement amount in non-electric-hydraulic-control building jacking engineering

Country Status (1)

Country Link
CN (1) CN202452925U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103486934A (en) * 2013-09-13 2014-01-01 南京工业大学 Jacking displacement measuring system in non-electrohydraulic control building jacking project
CN110108214A (en) * 2019-06-05 2019-08-09 长安大学 A kind of geotechnical engineering horizontal displacement monitoring system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103486934A (en) * 2013-09-13 2014-01-01 南京工业大学 Jacking displacement measuring system in non-electrohydraulic control building jacking project
CN110108214A (en) * 2019-06-05 2019-08-09 长安大学 A kind of geotechnical engineering horizontal displacement monitoring system

Similar Documents

Publication Publication Date Title
CN109141905B (en) Six-component force test bed and method for measuring vector thrust thereof
CN104567641B (en) A kind of Short/Medium Span Bridge deflection measuring apparatus
CN202137350U (en) On-line weighing system for continuous casting slab
CN103822831B (en) A kind of rigidity following loading framed structure
CN103822830B (en) A kind of rock true triaxial test loading system
CN103698210A (en) Comprehensive mechanical property test device of fuel assembly and test method thereof
CN107238529B (en) Precast concrete member bearing capacity test device and installation method
CN106679786B (en) Dead weight and stack combined type hook balance calibrating installation
CN202452925U (en) High-precision measurement structure of jacking displacement amount in non-electric-hydraulic-control building jacking engineering
CN105004454A (en) Heavy-load single-component sensor and measuring method
CN106959216B (en) Tramcar bogie static load test device
CN102103065A (en) Device for calibrating extraction instrument
CN204718888U (en) A kind of regeneration concrete TERM DEFORMATION test loads and measurement mechanism
CN106525366A (en) Magnetic suspension type bridge deflection measuring device and measuring method thereof
CN100492441C (en) Composite twistless compound pendulus rod
CN203455067U (en) Electronic balance calibration counterweight
CN202599633U (en) Bridge deflection test instrument
CN204575459U (en) A kind of flexural member Mechanics Performance Testing device
CN207066853U (en) A kind of precast concrete test device for multifunctional
CN203454947U (en) Jacking displacement measuring system in non-electrohydraulic control building jacking project
CN109142069A (en) A kind of light steel grouting wall detection device and its application method
CN202661353U (en) Liquid viscosity measuring instrument
CN103063526A (en) Auxiliary device for experiments of behavior of concrete under axial loading at ultra low temperature
CN205313980U (en) Portable bed -jig of assembling of truss -like overline bridge steel member
CN203310500U (en) Novel flexible cup support structure with large-displacement for weighing large-scale object

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wei Longwu

Inventor after: Lu Yan

Inventor after: Lu Yan

Inventor after: Zhang Wenshu

Inventor after: Wang Kewei

Inventor after: Chen Wenhai

Inventor before: Wei Longwu

Inventor before: Zhang Wenshu

Inventor before: Wang Kewei

Inventor before: Chen Wenhai

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WEI LONGWU ZHANG WENSHU WANG KEWEI CHEN WENHAI TO: WEI LONGWU LU YAN LU YAN ZHANG WENSHU WANG KEWEI CHEN WENHAI

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120926

Termination date: 20121221