CN202444205U - Grounding wire which people can hang without mounting a pole - Google Patents

Grounding wire which people can hang without mounting a pole Download PDF

Info

Publication number
CN202444205U
CN202444205U CN2012200779110U CN201220077911U CN202444205U CN 202444205 U CN202444205 U CN 202444205U CN 2012200779110 U CN2012200779110 U CN 2012200779110U CN 201220077911 U CN201220077911 U CN 201220077911U CN 202444205 U CN202444205 U CN 202444205U
Authority
CN
China
Prior art keywords
grounding wire
hook
earth conductor
pole
lifting rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200779110U
Other languages
Chinese (zh)
Inventor
李秋峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Raoyang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Raoyang county electric power bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raoyang county electric power bureau filed Critical Raoyang county electric power bureau
Priority to CN2012200779110U priority Critical patent/CN202444205U/en
Application granted granted Critical
Publication of CN202444205U publication Critical patent/CN202444205U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the technical field of a grounding wire and particularly discloses a grounding wire which people can hang without mounting a pole. The grounding wire comprises an earth conductor, a grounding wire body composed of a hook rail and a hook. An insulation lifting rope is arranged on the top of the hook. The insulation lifting rope winds a pulley located above the earth conductor and the insulation lifting rope on two sides of the pulley is placed on two sides of the earth conductor. The insulation lifting rope is pulled, the hook of the grounding wire body moves to a position above the earth conductor, the hook is connected with the grounding wire, the earth conductor is hung on the hook and the operation of hanging the grounding wire is completed. After the operation of hanging the grounding wire, the insulation lifting rope is pulled upwards and the hook is removed from the earth conductor. People can hang the grounding wire on the earth conductor aloft without mounting a pole or a tower and accordingly labor intensity is reduced. Under the condition of severe environment such as the pole and the tower attached with ice, thick fog and the like, the operation can also be carried out and people are free of mounting the pole. Therefore, the risk of operating aloft is reduced, labor resources are saved, enterprise cost is reduced, working efficiency is improved and economical efficiency of enterprises is created.

Description

Exempt to step on bar suspension earth connection
Technical field
The utility model belongs to the earth connection technical field, particularly a kind ofly exempts to step on bar suspension earth connection.
Background technology
In the middle of power line construction, must carry out the electrical verification hanging earthing conductor before the construction because ground line configuration, hanging earthing conductor must be stepped on bar or tower etc. at present, when stepping on bar and operating not only charge for loss of working time, simultaneously also guarantee not workmen's personal safety.Especially run into dense fog or shaft tower and freeze to wait bad weather, often so and influence project progress, make company aspect engineering construction, suffer bigger economic loss, wasted human resources again.
The utility model content
The technical problem that the utility model solves just provide a kind of on ground with regard to hanging convenient, safe and convenient to usely, weatherproof exempt to step on bar suspension earth connection.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is:
Comprise the earth connection body of forming by earth lead, peg and hook, be provided with insulated sling on described hook top.
Its additional technical feature is:
Be provided with suspension ring on said hook top, described insulated sling is fixed on the described suspension ring;
Be provided with drop-down insulation rope at said peg end.
The utility model provided exempts to step on bar suspension earth connection and compares with prior art and have the following advantages: one of which, owing to comprise and be provided with insulated sling on described hook top by the earth connection body of forming by earth lead, peg and hook, insulated sling is walked around the pulley that is positioned at above the lead; The insulated sling of pulley both sides is positioned at the both sides of lead, and pulling insulated sling, the hook of earth connection body move to lead top, drop-down earth connection; Hang on the lead, accomplish ground wire hitching work, after construction is accomplished; Upwards draw insulated sling, hook removes from lead, need not step on bar or tower and just can earth connection be hung on the high hollow wire; Reduced labour intensity, attached at shaft tower under the condition of adverse circumstances such as ice, dense fog, can operate equally; Exempt to step on the bar operation, reduce the work high above the ground risk, save human resources; Reduce entreprise cost, improve construction efficiency, for enterprise creates economic benefit; Its two owing to be provided with suspension ring on said hook top, described insulated sling is fixed on the described suspension ring, is convenient to the fixing of insulated sling; Its three owing to be provided with drop-down insulation rope at said peg end, hook arrives the lead top, directly drags drop-down insulation rope downwards, the safe ready more of constructing like this.
Description of drawings
Fig. 1 is the structural representation of exempting to step on bar suspension earth connection that the utility model provided.
Embodiment
Exempt to step on the structure of bar suspension earth connection below in conjunction with accompanying drawing and specific embodiment to the utility model provided and do further detailed description.
As shown in Figure 1, this is exempted to step on bar suspension earth connection and comprises by earth lead 1, peg 2 and link up with the 3 earth connection bodies 4 formed, is provided with insulated sling 5 linking up with 3 tops.Insulated sling 5 is walked around the pulley that is positioned at the lead top, and pulling insulated sling 5, the hook 3 of earth connection body 4 move to lead top, drop-down earth lead 1; Hook 3 hangs on the lead, accomplishes ground wire hitching work, and construction is upwards drawn insulated sling after accomplishing; Hook removes from lead, and excision need not step on bar or tower just can hang over earth connection on the high hollow wire, has reduced labour intensity, attaches at shaft tower under the condition of adverse circumstances such as ice, dense fog; Can operate equally, exempt to step on the bar operation, reduce the work high above the ground risk, save human resources; Reduce entreprise cost, improve construction efficiency, for enterprise creates economic benefit.
Be provided with suspension ring 6 on hook 3 tops, insulated sling 5 is fixed on the described suspension ring 6, is convenient to the fixing of insulated sling 5.
End at said peg 2 is provided with drop-down insulation rope 7, and hook 3 arrives the lead top, directly drags drop-down insulation rope 7 downwards, the safe ready more of constructing like this.
Just to the explanation of the utility model, therefore, the protection range of the utility model not only is confined to the foregoing description to the foregoing description, and is identical as long as structure and the utility model exempt to step on bar suspension earth connection, just drops on the scope that the utility model is protected.

Claims (3)

1. exempt to step on bar suspension earth connection, comprise the earth connection body of forming by earth lead, peg and hook, it is characterized in that: be provided with insulated sling on described hook top.
2. according to claim 1ly exempt to step on bar suspension earth connection, it is characterized in that: be provided with suspension ring on said hook top, described insulated sling is fixed on the described suspension ring.
3. according to claim 1ly exempt to step on bar suspension earth connection, it is characterized in that: be provided with drop-down insulation rope at said peg end.
CN2012200779110U 2012-03-05 2012-03-05 Grounding wire which people can hang without mounting a pole Expired - Fee Related CN202444205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200779110U CN202444205U (en) 2012-03-05 2012-03-05 Grounding wire which people can hang without mounting a pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200779110U CN202444205U (en) 2012-03-05 2012-03-05 Grounding wire which people can hang without mounting a pole

Publications (1)

Publication Number Publication Date
CN202444205U true CN202444205U (en) 2012-09-19

Family

ID=46825635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200779110U Expired - Fee Related CN202444205U (en) 2012-03-05 2012-03-05 Grounding wire which people can hang without mounting a pole

Country Status (1)

Country Link
CN (1) CN202444205U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112945990A (en) * 2021-01-29 2021-06-11 四川赛康智能科技股份有限公司 Multi-split power transmission line electrified visual X-ray detection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112945990A (en) * 2021-01-29 2021-06-11 四川赛康智能科技股份有限公司 Multi-split power transmission line electrified visual X-ray detection device
CN112945990B (en) * 2021-01-29 2024-04-09 四川赛康智能科技股份有限公司 Electrified visual X-ray detection device for multi-split transmission line

Similar Documents

Publication Publication Date Title
CN202474702U (en) Platform mounting support for live operation of power distribution line
CN102545103B (en) Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method
CN202444206U (en) Wire clamp for grounding wire
CN202444205U (en) Grounding wire which people can hang without mounting a pole
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN206128808U (en) Novel single loop cable dead end tower
CN203932808U (en) Replacing insulator under electrified wire lifting device
CN202444202U (en) Aerial cable locking device
CN202444204U (en) Traction lifting device for high-altitude circuit tools and appliances
CN103010965A (en) Special tool of 110kVGW4-type for hoisting switch blades and porcelain bottles
CN203445520U (en) Live spanning device
CN202513517U (en) Bracket arm hoop
CN201821045U (en) Double hook lifting insulating support rod
CN202373939U (en) Live-working double-conductor lifting device
CN204538618U (en) A kind of cable clip making cable movement on steel strand wire
CN205489269U (en) Overhead earth wire hoisting device for high tension transmission line
CN202395384U (en) Operation tool for multiloop of 110-220kV electric transmission line
CN203367884U (en) Special-purpose wrench for spacers
CN202474705U (en) Electrified installation tool for bird scarer
CN202657877U (en) Circuit equipment construction lifting frame
CN208272496U (en) Hot line maintenance rope ladder lifting device
CN202657876U (en) 110-kV circuit arrester hoisting structure
CN202353102U (en) Lead lifting device for power line erection
CN207200124U (en) A kind of overhead transmission line overhauls mounting auxiliary
CN103532046B (en) A kind of straight line pole changes operational method and the device that strain section installs on-pole switch additional

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HENGSHUI POWER SUPPLY BRANCH COMPANY, STATE GRID H

Effective date: 20140717

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: STATE GRID HEBEI RAOYANG POWER SUPPLY COMPANY

Effective date: 20140717

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: STATE GRID HEBEI RAOYANG POWER SUPPLY COMPANY

Free format text: FORMER NAME: RAOYANG POWER AUTHORITY

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 053900 HENGSHUI, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Patentee after: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

Address before: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Patentee before: Raoyang County Electric Power Bureau

TR01 Transfer of patent right

Effective date of registration: 20140717

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID HEBEI ELECTRIC POWER COMPANY HENGSHUI POWER SUPPLY BRANCH

Patentee after: STATE GRID HEBEI ELECTRIC POWER Co.

Patentee after: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

Address before: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Patentee before: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20180305