CN202440762U - Simple channel platform bracket for synchronous jacking construction of bridges - Google Patents

Simple channel platform bracket for synchronous jacking construction of bridges Download PDF

Info

Publication number
CN202440762U
CN202440762U CN2012200550972U CN201220055097U CN202440762U CN 202440762 U CN202440762 U CN 202440762U CN 2012200550972 U CN2012200550972 U CN 2012200550972U CN 201220055097 U CN201220055097 U CN 201220055097U CN 202440762 U CN202440762 U CN 202440762U
Authority
CN
China
Prior art keywords
heavy frame
bolt
platform
bridges
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200550972U
Other languages
Chinese (zh)
Inventor
陈志勇
孙懿
杨铠
陈军生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN HUADING CONSTRUCTION TECHNOLOGY Co Ltd
Original Assignee
HUNAN HUADING CONSTRUCTION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN HUADING CONSTRUCTION TECHNOLOGY Co Ltd filed Critical HUNAN HUADING CONSTRUCTION TECHNOLOGY Co Ltd
Priority to CN2012200550972U priority Critical patent/CN202440762U/en
Application granted granted Critical
Publication of CN202440762U publication Critical patent/CN202440762U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A simple channel platform bracket for synchronous jacking construction of bridges comprises a heavy frame, a regulating nut, a heavy frame stand column, a fixing bolt, an upper connecting bolt, a diagonal pull rod, a platform, a lower connecting bolt and a railing. The heavy frame is mounted between a beam plate and a bent cap. The regulating nut is arranged on the heavy frame, the heavy frame stand column is fixed on a bridge pier through the fixing bolt, the diagonal pull rod is fixed on the heavy frame stand column through the upper connecting bolt and the lower connecting bolt, and the heavy frame stand column is fixed on the platform. The simple channel platform bracket for the synchronous jacking construction of bridges is simple in structure and excellent in performance.

Description

The bridge synchronization of jacking up simple and easy access platform frame of constructing
Technical field
The utility model relates to bridge synchronization of jacking up equipment, is specially the bridge synchronization of jacking up simple and easy access platform frame of constructing.
Background technology
In bridge industry, the bridge synchronization of jacking up simple and easy access platform frame of constructing is absolutely necessary, but present equipment, simple and crude, the poor safety performance of structure, fitting operation is complicated, brings very big inconvenience to construction.
The utility model content
The technical problem that the utility model solved is to provide the bridge synchronization of jacking up simple and easy access platform frame of constructing, to solve the shortcoming in the above-mentioned background technology.
The technical problem that the utility model solved adopts following technical scheme to realize:
The bridge synchronization of jacking up simple and easy access platform frame of constructing comprises heavy frame, adjusting nut, heavy frame column, set bolt, goes up attachment bolt, diagonal member, platform, lower link bolt and railing, and said heavy frame is installed between beam slab and the bent cap; Said adjusting nut is installed on the heavy frame, and the heavy frame column is fixed on the bridge pier with set bolt, and diagonal member uses attachment bolt and lower link is bolted on the column, and said column is fixed on the platform.
Beneficial effect
The utility model is rational in infrastructure, safe and reliable, excellent performance.
Description of drawings
Fig. 1 is the elevation of the utility model.
Fig. 2 is the lateral view of the utility model.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, below in conjunction with concrete diagram, further set forth the utility model.
Referring to Fig. 1, Fig. 2; Bridge synchronization of jacking up the construct lateral view of simple and easy access platform frame of elevation, the bridge synchronization of jacking up of simple and easy access platform frame of constructing; The bridge synchronization of jacking up simple and easy access platform frame of constructing; Comprise heavy frame 1, adjusting nut 2, heavy frame column 3, set bolt 4, go up attachment bolt 5, diagonal member 6, platform 7, lower link bolt 8 and railing 9, said heavy frame 1 is installed between beam slab and the bent cap; Said adjusting nut 2 is installed on the heavy frame 1; If the height between beam slab and the bent cap surpasses 5 centimetres, available adjustment nut 2 is regulated, and heavy frame column 3 usefulness set bolts 4 are fixed on the bridge pier; Diagonal member 6 is used attachment bolt 5 and is fixed on the column 3 with lower link bolt 8; Said column 3 is fixed on the platform 7, and paralell is fixedly mounted on bridge pier one side by a determining deviation, on platform 7, sets up steel plate and forms simple and easy passage; This passage only is used for the constructor to be passed through, and must not use with stacking as large-tonnage object lifting bracket.
More than show and described basic principle of the utility model and the advantage of principal character and the utility model; The technician of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the manual that the utility model just is described, under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications; These variations and improvement all fall in the utility model scope that requires protection, and the utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (1)

1. the bridge synchronization of jacking up simple and easy access platform frame of constructing; Comprise heavy frame, adjusting nut, heavy frame column, set bolt, go up attachment bolt, diagonal member, platform, lower link bolt and railing; It is characterized in that said heavy frame is installed between beam slab and the bent cap; Said adjusting nut is installed on the heavy frame, and the heavy frame column is fixed on the bridge pier with set bolt, and diagonal member uses attachment bolt and lower link is bolted on the column, and said column is fixed on the platform.
CN2012200550972U 2012-02-21 2012-02-21 Simple channel platform bracket for synchronous jacking construction of bridges Expired - Fee Related CN202440762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200550972U CN202440762U (en) 2012-02-21 2012-02-21 Simple channel platform bracket for synchronous jacking construction of bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200550972U CN202440762U (en) 2012-02-21 2012-02-21 Simple channel platform bracket for synchronous jacking construction of bridges

Publications (1)

Publication Number Publication Date
CN202440762U true CN202440762U (en) 2012-09-19

Family

ID=46822216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200550972U Expired - Fee Related CN202440762U (en) 2012-02-21 2012-02-21 Simple channel platform bracket for synchronous jacking construction of bridges

Country Status (1)

Country Link
CN (1) CN202440762U (en)

Similar Documents

Publication Publication Date Title
CN204030347U (en) A kind of ring main unit integration is from bogey
CN204552050U (en) A kind of anchor ear bearing frame and scaffolding platform assembly
CN201881134U (en) Special device for dismounting and mounting metro vehicle brake cylinder
CN204510842U (en) A kind of steel crane beam installed height mark adjusting device
CN201883350U (en) Track adjusting device
CN202953653U (en) Telescopic guiding rail bracket of lift
CN202440762U (en) Simple channel platform bracket for synchronous jacking construction of bridges
CN202926849U (en) Spherical hinge gasket for revolving platform anchor bolt
CN208898432U (en) A kind of jack and jacking apparatus for bridge jacking
CN203099228U (en) Anchor bolt leveling structure
CN202323727U (en) Device for adjusting horizontal position of steel box girder
CN203333116U (en) Stable easily-adjustable type elevator counterweight device
CN203547110U (en) Novel anti-falling device of lifting scaffold
CN205855702U (en) A kind of Elevator weight sensor block assembly
CN202969936U (en) Elevator shaft hanging template pedestal
CN204532376U (en) Split type lifting construction trolley
CN204023542U (en) Vertical ship lift counterweight block connecting steel wire ropes stretching adjusting device
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN204116062U (en) A kind of based on lifting jack loading guardrail level, the dual-purpose test unit of vertical load
CN203701878U (en) Split-type bearing connection mechanism for vertical columns of platform screen door
CN202811757U (en) Set bolt for aluminum mould
CN202627472U (en) Adjustable base of steel pipe scaffold
CN201142537Y (en) Large span cable bridge rack installation mold
CN204000642U (en) The concrete prefabricated board mounting assembly of a kind of bridge construction
CN205296968U (en) Pylon

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20160221

CF01 Termination of patent right due to non-payment of annual fee