CN202423986U - Spacer installation device - Google Patents

Spacer installation device Download PDF

Info

Publication number
CN202423986U
CN202423986U CN 201120519066 CN201120519066U CN202423986U CN 202423986 U CN202423986 U CN 202423986U CN 201120519066 CN201120519066 CN 201120519066 CN 201120519066 U CN201120519066 U CN 201120519066U CN 202423986 U CN202423986 U CN 202423986U
Authority
CN
China
Prior art keywords
plate
lateral plate
installation device
conductor spacer
pulleys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120519066
Other languages
Chinese (zh)
Inventor
魏晓辉
古长周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jiaozuo Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Jiaozuo Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaozuo Power Supply Co of Henan Electric Power Co filed Critical Jiaozuo Power Supply Co of Henan Electric Power Co
Priority to CN 201120519066 priority Critical patent/CN202423986U/en
Application granted granted Critical
Publication of CN202423986U publication Critical patent/CN202423986U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a spacer installation device, which comprises a right lateral plate and a left lateral plate. Two pulleys are arranged between the left lateral plate and the right lateral plate. The left lateral plate comprises a left upper lateral plate and a left lower lateral plate which are connected through a bolt. The spacer installation device can convey a spacer board to the corresponding position of a transmission wire by means of the pulleys on the ground, thereby not only saving labor but also further reducing risk of high-altitude work of workers.

Description

The conductor spacer erecting device
Technical field
The utility model relates to a kind of electric power tool, is specifically related to a kind of conductor spacer erecting tools.
Background technology
On transmission line, need the installation interval rod, the power transmission sequence bundle conductor is relative motion between the siding stopping lead and the geometry that under normal operation, keeps bundle conductor with the main application of conductor spacer.Existing conductor spacer installation process is following: the staff moves to conductor spacer on the iron tower earlier, relies on artificial with the unlucky relevant position to transmission pressure of conductor spacer afterwards.This process wastes time and energy on the one hand, the danger of staff's work high above the ground is bigger on the other hand.
The utility model content
The purpose of the utility model is the deficiency to above-mentioned prior art, and a kind of conductor spacer erecting device is provided, and does not need workman's height to bear conductor spacer in the air, has improved the fail safe of operation, reduces labour intensity.
The technical scheme of the utility model realizes in the following manner: a kind of conductor spacer erecting device; Comprise right plate and left plate; Be provided with two pulleys between left plate and the right plate, said left plate comprises upper left side plate and left lower side panel, links to each other through bolt between upper left side plate and the left lower side panel.
Be provided with suspended axle between said upper left side plate and the right plate, be fixed with drag-line on the suspended axle.
The utility model can rely on pulley on the ground space bar to be transported to the relevant position of transmission pressure, has not only saved the labour, has also reduced the danger of staff's work high above the ground.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is that sketch map is looked on the left side of Fig. 1.
Embodiment
Shown in accompanying drawing, a kind of conductor spacer erecting device comprises right plate 5 and left plate, is provided with two pulleys 2 between left plate and the right plate 5, and said left plate comprises upper left side plate 1 and left lower side panel 3, links to each other through bolt 4 between upper left side plate 1 and the left lower side panel 3.
Be provided with suspended axle 6 between said upper left side plate 1 and the right plate 5, be fixed with drag-line 7 on the suspended axle 6.
The utility model use is following: suspension sliding traction rope on the pulley 2 below; Unclamp bolt 4; Rotate left lower side panel, aerial condutor is placed between two pulleys, tighting a bolt afterwards 4 hardens left lower side panel and upper left side to lump together, utilize drag-line to move whole device to relevant position; Conductor spacer is fixed on pull rope one end, and the pulling traction rope other end can lift conductor spacer the position of needs afterwards.

Claims (2)

1. conductor spacer erecting device; Comprise right plate (5) and left plate; Be provided with two pulleys (2) between left plate and the right plate (5); It is characterized in that: said left plate comprises upper left side plate (1) and left lower side panel (3), links to each other through bolt (4) between upper left side plate (1) and the left lower side panel (3).
2. conductor spacer erecting device according to claim 1 is characterized in that: be provided with suspended axle (6) between said upper left side plate (1) and the right plate (5), be fixed with drag-line (7) on the suspended axle (6).
CN 201120519066 2011-12-13 2011-12-13 Spacer installation device Expired - Fee Related CN202423986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120519066 CN202423986U (en) 2011-12-13 2011-12-13 Spacer installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120519066 CN202423986U (en) 2011-12-13 2011-12-13 Spacer installation device

Publications (1)

Publication Number Publication Date
CN202423986U true CN202423986U (en) 2012-09-05

Family

ID=46748712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120519066 Expired - Fee Related CN202423986U (en) 2011-12-13 2011-12-13 Spacer installation device

Country Status (1)

Country Link
CN (1) CN202423986U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108767737A (en) * 2018-06-15 2018-11-06 国家电网有限公司 A kind of lead spacer high-altitude transport device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108767737A (en) * 2018-06-15 2018-11-06 国家电网有限公司 A kind of lead spacer high-altitude transport device
CN108767737B (en) * 2018-06-15 2024-02-02 国家电网有限公司 High-altitude conveying device for conductor spacer

Similar Documents

Publication Publication Date Title
CN107013080B (en) A kind of power grid electric pole erection construction method
CN201729557U (en) Device with elevator and ladder stand arranged in tower tube of wind generating set
CN202379595U (en) Hoisting tool for C-shaped web of wind-driven generator blade
CN202358850U (en) Light lift-type cantilever crane
CN202423986U (en) Spacer installation device
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN201473253U (en) Mobile light hydraulic crane
CN103001152A (en) Overhead ground wire lifter of power transmission line
CN203159151U (en) Cover plate lifting tool
CN202737386U (en) Insulator string fixing traction tool
CN202465073U (en) Crane traveling mechanism
CN202787930U (en) Hanging basket for high-place operations
CN202424002U (en) Spacer rod hoisting tool used safely
CN204185773U (en) A kind of Bridge Erector rail moves rail device
CN203079643U (en) High-altitude hoisting apparatus
CN106315413B (en) A kind of control system and its control method of gantry truss robot
CN206691869U (en) A kind of single pile movement system
CN203151001U (en) A power cable lifting device
CN202423985U (en) Rapidly installed spacing bar transportation device
CN203794495U (en) Lifting device for generator set draft tube manhole door
CN205023768U (en) Solar energy type hoist davit
CN204897264U (en) A lifting machine for transmission line lays
CN203306988U (en) High-place operation auxiliary transfer car
CN203722143U (en) System for novel mechanized laying of large cross-section power cable
CN203439903U (en) Pole erecting and lifting tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELE

Effective date: 20140210

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELECTRIC POWER COMPANY

Effective date: 20140210

C56 Change in the name or address of the patentee

Owner name: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELE

Free format text: FORMER NAME: HENAN ELECTRIC POWER COMPANY, JIAOZUO POWER SUPPLY COMPANY

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 454150 JIAOZUO, HENAN PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 454150 No. 299 South Tower Road, Henan, Jiaozuo

Patentee after: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Address before: 454150 No. 299 South Tower Road, Henan, Jiaozuo

Patentee before: Jiaozuo Power Supply Company, Henan Electric Power Corp.

CP03 Change of name, title or address
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20140210

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Address before: 454150 No. 299 South Tower Road, Henan, Jiaozuo

Patentee before: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20181213