CN202383770U - Intelligent electric meter fee control device - Google Patents

Intelligent electric meter fee control device Download PDF

Info

Publication number
CN202383770U
CN202383770U CN2011205525915U CN201120552591U CN202383770U CN 202383770 U CN202383770 U CN 202383770U CN 2011205525915 U CN2011205525915 U CN 2011205525915U CN 201120552591 U CN201120552591 U CN 201120552591U CN 202383770 U CN202383770 U CN 202383770U
Authority
CN
China
Prior art keywords
load switch
intelligent electric
external
electric meter
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205525915U
Other languages
Chinese (zh)
Inventor
胡绳刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI JINGDEZHEN POWER SUPPLY Co
State Grid Corp of China SGCC
Original Assignee
JIANGXI JINGDEZHEN POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI JINGDEZHEN POWER SUPPLY Co filed Critical JIANGXI JINGDEZHEN POWER SUPPLY Co
Priority to CN2011205525915U priority Critical patent/CN202383770U/en
Application granted granted Critical
Publication of CN202383770U publication Critical patent/CN202383770U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to an intelligent electric meter fee control device, which comprises an intelligent electric meter and an externally arranged load switch, wherein a built-in relay is also arranged in the intelligent electric meter, the externally arranged load switch is provided with a shunt release and a control circuit, and the externally arranged load switch is controlled to be switched on and off by the shunt release and the control circuit. The intelligent electric meter can output a group of switch signals under a working state, and at a normally working state, the output switch signals can maintain the externally arranged load switch to be switched on and allow users to use electricity; and when a control condition is met, and the output switch signals can drive the externally arranged load switch to act and interrupt power supply, so that the purpose of remotely controlling user circuits by the intelligent electric meter is realized.

Description

Intelligent electric meter takes the control device
Technical field
The utility model relates to a kind of intelligent electric meter expense control device, is specifically related to a kind of intelligent electric meter expense control device that can Long-distance Control intelligent electric meter user power utilization loop.
Background technology
Intelligent electric energy meter has compositions such as measuring unit, data processing unit, communication unit, has functions such as electrical energy metering, data processing, monitoring in real time, control automatically, information interaction.Intelligent electric meter is many at present is used with external on-load switch (isolating switch); The external on-load switch (isolating switch) of existing use only possesses functions such as conventional traffic overload, open circuit fault protection and complete electrical isolation; Do not possess the intelligence of to receive and show the control signal of sending and the function of cutting off the power supply automatically, can't realize the Long-distance Control power down function of intelligent electric meter.
Summary of the invention
To the problems referred to above, the utility model provides a kind of intelligent electric meter expense control device that can realize the Long-distance Control power down function.
The purpose of the utility model is achieved in that a kind of intelligent electric meter expense control device that the utility model provides; Comprise have measuring unit, intelligent electric meter that data processing unit, communication unit, power consumption metering show and the external on-load switch of supporting installation with it; It is characterized in that: also be provided with built-in relay in the said intelligent electric meter; Said external on-load switch is provided with shunt release and operation circuit; The combined floodgate of said external on-load switch and disconnection are controlled by shunt release and operation circuit; Said built-in relay outputs control signals in the operation circuit on the external on-load switch with Chang Kai or normally closed two kinds of different conditions, external on-load switch is in allows to close a floodgate or two kinds of different conditions of instantaneous trip.The principle of work of the utility model is: shunt release RL1 has or not through operation circuit voltage, thereby the break-make of control solenoid reaches the purpose of shunted exciter tripping work. when control circuit is switched on, and can the reliable closed closing position that also remains on for a long time.When control circuit broke off, time-delay was broken off in 0.5s to 2s.The utility model adopts technique scheme; When normal electricity consumption of ammeter user or full-amount electricity payment; Main website sends close command through local mode or remote mode; After this relay closes, external on-load switch control loop through closure obtained low-voltage signal, external on-load switch was in the permission "on" position; When the ammeter user is in the arrearage state; Main website sends open command through local mode or remote mode; The built-in relay of intelligent electric meter breaks off, and external on-load switch control loop breaks off, external on-load switch tripping operation; And being in can not "on" position, and the back of promptly forcing to close a floodgate instantaneous trip will take place at once.
The general selection of above-mentioned relay is in normally open, output control signal when built-in relay is in closure state, and external on-load switch obtains low-voltage signal through the control loop of closure, makes external on-load switch be in the permission "on" position; No-output control signal when built-in relay is in off-state, the control loop of external on-load switch does not have low-voltage signal, makes external on-load switch be in the instantaneous trip state.
The preferred scheme of above-mentioned control signal is for adopting ac sinusoidal voltage signal, its effective value 220V, frequency 50Hz.
The utility model is threaded off by the single-phase control intelligent electric meter may command shunt opening that takes.During operate as normal, intelligent electric meter output control signal, external on-load switch maintains "on" position, allows user power utilization; When satisfying controlled condition, ammeter breaks off the control signal of output, and external on-load switch should break off and keep off-state; Interruption of power supply, and break off during the control signal external on-load switch can not manual closing operation, realized the intelligent electric meter Long-distance Control; Manpower and materials have been reduced; Evade security risk, reach the purpose of the conscious electricity payment of user, effectively promote these district's electricity charge to reclaim.
Description of drawings
Fig. 1 ForExternal on-load switch control panel wiring diagram.
Fig. 2 is the wiring diagram of 1P+N.
Fig. 3 is the wiring diagram of 3P+N.
Embodiment
Among Fig. 1, N is the neutral line, and L is a phase line, and E is a control signal wire, and RL1 is a magnetictrip, and 1 is intelligent electric meter (IC table), and K is that the intelligent electric meter output control relay is claimed built-in relay, U again n=AC230V, control signal U k=(60%~120%) U n, the steering logic table is:
N,L K RL1 Remarks
0 0 0 Do not thread off
1 1 0 Do not thread off
1 0 1 Thread off
Among Fig. 2 and Fig. 3,1 is intelligent electric meter (IC table), and 2 is external on-load switch (isolating switch).
Intelligent electric meter take the control device by intelligent electric meter 1 and with it the external on-load switch 2 (isolating switch) of supporting installation form; Intelligent electric meter comprises measuring unit, data processing unit, communication unit etc.; Have functions such as electrical energy metering, data processing, monitoring in real time, control automatically, information interaction; Also be provided with built-in relay K; External on-load switch except that have single-phase terminal distribution system overload, short trouble is protected and fully the conventional func such as electrical isolation, also on external on-load switch control circuit board, be provided with shunt release RL1 and operation circuit, and normal circuit breaker does not have shunt release RL1 and operation circuit; The combined floodgate of external on-load switch and disconnection are controlled by shunt release and operation circuit; Built-in relay outputs control signals in the operation circuit on the external on-load switch with Chang Kai or normally closed two kinds of different conditions, external on-load switch is in allows to close a floodgate or two kinds of different conditions of instantaneous trip.The principle of work of the utility model is: shunt release RL1 has or not through operation circuit voltage, thereby the break-make of control solenoid reaches the purpose of shunted exciter tripping work. when control circuit is switched on, and can the reliable closed closing position that also remains on for a long time.When control circuit broke off, time-delay was broken off in 0.5s to 2s.
When intelligent electric meter calculated the electricity charge in real time, when remaining sum was less than or equal to the warning amount of money of setting, electric energy meter was reminded the user with sound, light or other modes; Simultaneously the overdraw amount of money is carried out real time record, when the overdraw amount of money was lower than the overdraw thresholding amount of money of setting, electric energy meter can send power-off signal, controls external on-load switch (being isolating switch) interruption of power supply; At this moment the user through local mode (solid state mediums such as CPU card, radio-frequency card) or remote mode (long-range) through power line carrier, radio, phone or cable and long-range electricity-selling system electric company handle purchase electric hand continuous after; To purchase electrical information and be transferred to intelligent electric meter; After intelligent electric meter receives the effectively continuous information of paying tariff; At first the deduction overdraw amount of money is (when load control switch breaks down can not cut off the power supply the time; The electric weight electricity charge that the user buys on dredit); When remaining sum during greater than setting value (be defaulted as zero), can make intelligent electric meter be in the permission "on" position through long-range or local mode, local external on-load switch (being isolating switch) is restored electricity by artificial.

Claims (3)

1. an intelligent electric meter takes the control device; Comprise have measuring unit, intelligent electric meter that data processing unit, communication unit, power consumption metering show and the external on-load switch of supporting installation with it; It is characterized in that: also be provided with built-in relay in the said intelligent electric meter; Said external on-load switch is provided with shunt release and operation circuit; The combined floodgate of said external on-load switch and disconnection are controlled by shunt release and operation circuit, and said built-in relay outputs control signals in the operation circuit on the external on-load switch with Chang Kai or normally closed two kinds of different conditions, external on-load switch is in allows to close a floodgate or two kinds of different conditions of instantaneous trip.
2. take the control device according to the said intelligent electric meter of claim 1; It is characterized in that: output control signal when built-in relay is in closure state; External on-load switch obtains low-voltage signal through the control loop of closure, makes external on-load switch be in the permission "on" position; No-output control signal when built-in relay is in off-state, the control loop of external on-load switch does not have low-voltage signal, makes external on-load switch be in the instantaneous trip state.
3. take the control device according to claim 1 or 2 said intelligent electric meters, it is characterized in that: said output control signal is the ac sinusoidal voltage signal, effective value 220V, frequency 50Hz.
CN2011205525915U 2011-12-27 2011-12-27 Intelligent electric meter fee control device Expired - Fee Related CN202383770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205525915U CN202383770U (en) 2011-12-27 2011-12-27 Intelligent electric meter fee control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205525915U CN202383770U (en) 2011-12-27 2011-12-27 Intelligent electric meter fee control device

Publications (1)

Publication Number Publication Date
CN202383770U true CN202383770U (en) 2012-08-15

Family

ID=46632258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205525915U Expired - Fee Related CN202383770U (en) 2011-12-27 2011-12-27 Intelligent electric meter fee control device

Country Status (1)

Country Link
CN (1) CN202383770U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104391173A (en) * 2014-12-08 2015-03-04 国网宁夏电力公司固原供电公司 Jump-out type expenditure-controlled intelligent electric energy meter system and jump-out type expenditure-controlled intelligent electric energy meter
CN105911344A (en) * 2016-04-26 2016-08-31 宁波三星智能电气有限公司 Intelligent electric energy meter supporting electric leakage protection
CN107450421A (en) * 2017-10-10 2017-12-08 南昌市永峰科技有限公司 A kind of multi-functional logical process system and its method for operation
CN108120951A (en) * 2018-02-01 2018-06-05 国网江西省电力有限公司电力科学研究院 A kind of achievable built-in switch fault detect takes control intelligent electric energy meter
CN114113727A (en) * 2021-10-21 2022-03-01 广西电网有限责任公司崇左供电局 Heavy current cost control switch converter

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104391173A (en) * 2014-12-08 2015-03-04 国网宁夏电力公司固原供电公司 Jump-out type expenditure-controlled intelligent electric energy meter system and jump-out type expenditure-controlled intelligent electric energy meter
CN105911344A (en) * 2016-04-26 2016-08-31 宁波三星智能电气有限公司 Intelligent electric energy meter supporting electric leakage protection
CN107450421A (en) * 2017-10-10 2017-12-08 南昌市永峰科技有限公司 A kind of multi-functional logical process system and its method for operation
CN108120951A (en) * 2018-02-01 2018-06-05 国网江西省电力有限公司电力科学研究院 A kind of achievable built-in switch fault detect takes control intelligent electric energy meter
CN108120951B (en) * 2018-02-01 2024-04-02 国网江西省电力有限公司电力科学研究院 Cost control intelligent electric energy meter capable of realizing built-in switch fault detection
CN114113727A (en) * 2021-10-21 2022-03-01 广西电网有限责任公司崇左供电局 Heavy current cost control switch converter

Similar Documents

Publication Publication Date Title
CN202383770U (en) Intelligent electric meter fee control device
CN203537062U (en) System for managing electric power supply of grid
CN202948040U (en) Intelligent electric energy meter having power failure monitoring and protection functions
CN101964516B (en) Three-phase four-wire system zero-line failure and open-phase intelligent protector
CN102830255A (en) Smart electricity meter with function of monitoring and protecting power failure
CN101673964B (en) Modular UPS integrated power distribution system
CN104113047A (en) Electricity utilization protection method and electricity utilization protection device based on comprehensive integration of public transformers
CN202957611U (en) Three-phase current unbalance adjusting system of power distribution network
CN101695906B (en) Automatic switch-on and switch-off device of overhead line of electric locomotive
CN204243884U (en) For the supply unit of distribution terminal
CN201506266U (en) Automatic power-on and power-off device for electric locomotive stringing
CN103427394A (en) Mining flame-proof type selective leakage protector
CN207301220U (en) A kind of intelligent subscriber boundary switch controllers
CN208723530U (en) Intelligent microcomputer protecting controller
CN201616596U (en) Single-phase intelligent type alternating-current distribution box
CN203445594U (en) Novel explosion-proof type low-voltage selective electric leakage protector used for mining
CN203774211U (en) Automatic closing control circuit of universal circuit breaker
CN201985047U (en) Circuit breaker for prepaid electric energy meter
CN202094598U (en) Rated current adjustable leakage protector
CN103840564A (en) Remote control loop comprehensive misoperation-preventive locking device
CN205029333U (en) Little electric wire netting intelligent protection device based on regional information
CN204086340U (en) A kind of switch external intelligent electric energy meter stops repeating installation
CN206401875U (en) A kind of micro- disconnected reclosing electronic controller and miniature circuit breaker
CN207559538U (en) A kind of three-phase automatic reclosing device with wireless communication function
CN106532687A (en) Remote switch-on household distribution box

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121122

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121122

Address after: 333000, No. 5 West Zhushan Road, Jingdezhen, Jiangxi, Jingdezhen

Patentee after: Jiangxi Jingdezhen Power Supply Company

Patentee after: State Grid Corporation of China

Address before: 333000, No. 5 West Zhushan Road, Jingdezhen, Jiangxi, Jingdezhen

Patentee before: Jiangxi Jingdezhen Power Supply Company

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120815

Termination date: 20191227