CN202362089U - Overload pre-warning system for transformer - Google Patents

Overload pre-warning system for transformer Download PDF

Info

Publication number
CN202362089U
CN202362089U CN2011204996422U CN201120499642U CN202362089U CN 202362089 U CN202362089 U CN 202362089U CN 2011204996422 U CN2011204996422 U CN 2011204996422U CN 201120499642 U CN201120499642 U CN 201120499642U CN 202362089 U CN202362089 U CN 202362089U
Authority
CN
China
Prior art keywords
transformer
module
data acquisition
processing module
detection module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204996422U
Other languages
Chinese (zh)
Inventor
魏本刚
黄华
傅晨钊
张鹏翔
刘红星
姜林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO LIGONG ONLINE MONITORING TECHNOLOGY Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
NINGBO LIGONG ONLINE MONITORING TECHNOLOGY Co Ltd
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO LIGONG ONLINE MONITORING TECHNOLOGY Co Ltd, East China Power Test and Research Institute Co Ltd filed Critical NINGBO LIGONG ONLINE MONITORING TECHNOLOGY Co Ltd
Priority to CN2011204996422U priority Critical patent/CN202362089U/en
Application granted granted Critical
Publication of CN202362089U publication Critical patent/CN202362089U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model relates to an overload pre-warning system for a transformer. A transformer top-layer oil temperature detection module, a transformer high-voltage side load current detection module and a substation environment temperature detection module are connected into a data acquisition and processing module; the data acquisition and processing module is connected into an upper computer display and control module; and a transformer device parameter module is connected into the upper computer display and control module which is connected into the data acquisition and processing module. The overload pre-warning system for the transformer has the beneficial effects that the transformer middle-layer oil temperature is collected to establish an equivalent thermal circuit model to calculate the hot spot temperature on the transformer in a certain time length in advance; and each data of the existing transformer at an overload working condition can be accurately analyzed and processed by adopting an upper-limit prewarning and tendency prewarning mechanism of the hot spot temperature, thereby achieving safe estimation and reducing occurrence of accidents.

Description

A kind of transformer overload early-warning system
Technical field
The utility model relates to a kind of power equipment detection system, particularly a kind of transformer overload early-warning system.
Background technology
Existing detection system comprises transformer top-oil temperature detection module, transformer high-voltage lateral load current detection module, substation temperature detecting module, data acquisition and processing module, host computer demonstration and control module and transformer equipment parameter module; Collection transformer middle level oil temperature is set up equivalent hot road model and had both been shifted to an earlier date the hot(test)-spot temperature after the certain time length on the calculating transformer; Do not adopt the alert mechanism of pre-alarm of the hot(test)-spot temperature upper limit and trend prediction yet; Can accurately not handle, can not give warning in advance each item data analysis of existing transformer under the overload condition of work.
The utility model content
The purpose of the utility model provides a kind of transformer overload early-warning system, to overcome above-mentioned described defective.
The described a kind of transformer overload early-warning of the utility model system realizes through following technical scheme: a kind of transformer overload early-warning system; Comprise transformer top-oil temperature detection module, transformer high-voltage lateral load current detection module, substation temperature detecting module, data acquisition and processing module, host computer demonstration and control module and transformer equipment parameter module; Transformer top-oil temperature detection module, transformer high-voltage lateral load current detection module and the equal parallel connection of substation temperature detecting module are linked into data acquisition and processing module; Data acquisition and processing module insert host computer and show and control module, data interaction between said data acquisition and processing module and host computer demonstration and the control module; The transformer equipment parameter module inserts host computer and shows and control module, and host computer shows and control module access data acquisition and processing module.
The beneficial effect of the described a kind of transformer overload early-warning of the utility model system is: gather transformer middle level oil temperature and set up that equivalent hot road model can shift to an earlier date on the calculating transformer hot(test)-spot temperature after the certain time length and to have adopted pre-alarm of the hot(test)-spot temperature upper limit and trend prediction alert machine-processed; Can be to existing transformer each association under overload condition of work analyzing and processing accurately; Reach safe estimation, the generation of minimizing accident.
Description of drawings
According to accompanying drawing the utility model is done further explain below.
Fig. 1 is the structured flowchart of the described a kind of transformer overload early-warning of the utility model embodiment system.
The name that mark is corresponding among the figure is called:
1, transformer top-oil temperature detection module; 2, transformer high-voltage lateral load current detection module; 3, substation temperature detecting module; 4, data acquisition and processing module; 5, host computer shows and control module; 6, transformer equipment parameter module.
Embodiment
As shown in Figure 1; The described a kind of transformer overload early-warning of the utility model embodiment system; Comprise that transformer top-oil temperature detection module 1, transformer high-voltage lateral load current detection module 2, substation temperature detecting module 3, data acquisition and processing module 4, host computer show and control module 5 and transformer equipment parameter module 6; Transformer top-oil temperature detection module 1, transformer high-voltage lateral load current detection module 2 and the 3 equal parallel connections of substation temperature detecting module are linked into data acquisition and processing module 4; Data acquisition and processing module 4 insert host computer and show and control module 5; Data interaction between data acquisition and processing module 4 and host computer demonstration and the control module 5; Transformer equipment parameter module 6 inserts host computer and shows and control module 5, and host computer shows and control module 5 inserts data acquisition and processing module 4.
The described transformer overload early-warning of the utility model system works principle: obtain in the survey sensor of the data in the transformer top-oil temperature detection module 1 by the configuration of transformer body, sensor output signal is the current signal of 4-20mA.Data in the transformer high-voltage lateral load current detection module 2 can be measured CT secondary side current data through the punching small electric current sensor and obtain, and small electric current sensor output signal still is the current signal of 4-20mA.For fear of receiving the transformer-cabinet Influence of Temperature, environment temperature detects data need adopt the PT100 temperature sensor in the position measurement with a certain distance from transformer, its output signal also is set to the current signal of 4-20mA.Data acquisition and processing module are based on the signals collecting and the processing module of DSP exploitation, and the analog signal conversion that sensor is exported is that digital signal is analyzed and handled, and adopts TCP communication protocol that the result is uploaded to host computer then and shows.Simultaneously; Can show with 5 pairs of data collections of control module and processing unit through host computer and control; As the following biography of transformer equipment parameter and modification, signal acquisition periods setting, system stop with operation etc. all be data or instruction to be issued in the dsp processor through host computer; The host computer instruction issues adopts UDP communication, and adopts answer-mode.In the data inputting interface of host computer demonstration and control module 5, transformer equipment parameter module 6 is imported; Data collection cycle nT, pre-estimation duration pT etc. are set; The host computer data message will reach among the DSP down when system start-up automatically, also can through following teletype command with data transmission to DSP.When system does not start, the sampling of data acquisition and processing module 4 stop signals, but transformer top-oil temperature detection module 1, transformer high-voltage lateral load current detection module 2, substation temperature detecting module 3 keep uploading current signal.When system start-up, data acquisition and processing module 4 begin sensor signal is sampled so, and the sampling period is nT.The current value that sampling is obtained is converted into the actual value of detected object by calibration formula; And combine the long pT of potential device parameter prediction timing, through hot-spot temperature of transformer value and current hot(test)-spot temperature behind the operation pT duration under the equivalent hot road model assessment present load of setting up based on transformer middle level oil temperature.Result of calculation is uploaded to host computer to be shown and control module 5; Be provided with alarm mechanism in the host computer; Adopt upper limit pre-alarm and trend prediction alert; If the hot(test)-spot temperature behind the pT duration is greater than alarm threshold value, then system will send upper limit pre-alarm signal, and trend prediction is alert then to be judged whether to report to the police through the variation tendency of analyzing current hot(test)-spot temperature value and history value.
The utility model is not limited to above-mentioned preferred forms; Anyone can draw other various forms of products under the enlightenment of the utility model; No matter but on its shape or structure, do any variation; Every have identical with a application or akin technical scheme, all drops within the protection domain of the utility model.

Claims (1)

1. transformer overload early-warning system; Comprise that transformer top-oil temperature detection module (1), transformer high-voltage lateral load current detection module (2), substation temperature detecting module (3), data acquisition and processing module (4), host computer show and control module (5) and transformer equipment parameter module (6); It is characterized in that: transformer top-oil temperature detection module (1), transformer high-voltage lateral load current detection module (2) and substation temperature detecting module (3) all parallel connection are linked into data acquisition and processing module (4); Data acquisition and processing module (4) insert host computer and show and control module (5); Transformer equipment parameter module (6) inserts host computer and shows and control module (5), and host computer shows and control module (5) inserts data acquisition and processing module (4).
CN2011204996422U 2011-12-05 2011-12-05 Overload pre-warning system for transformer Expired - Fee Related CN202362089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204996422U CN202362089U (en) 2011-12-05 2011-12-05 Overload pre-warning system for transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204996422U CN202362089U (en) 2011-12-05 2011-12-05 Overload pre-warning system for transformer

Publications (1)

Publication Number Publication Date
CN202362089U true CN202362089U (en) 2012-08-01

Family

ID=46573268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204996422U Expired - Fee Related CN202362089U (en) 2011-12-05 2011-12-05 Overload pre-warning system for transformer

Country Status (1)

Country Link
CN (1) CN202362089U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102879696A (en) * 2012-10-24 2013-01-16 上海市电力公司 Automatic judgment method for over-load operational feasibility of transformer
CN103698033A (en) * 2013-12-17 2014-04-02 广西电网公司电力科学研究院 Transformer winding hot-spot temperature forecasting evaluation system with self-adaption function
CN105203887A (en) * 2015-10-20 2015-12-30 国家电网公司 Prewarning method, device and system for overload of transformer
CN108680801A (en) * 2018-03-23 2018-10-19 国网河北省电力有限公司电力科学研究院 A kind of transformer overload computational methods, system and terminal device
CN109060158A (en) * 2018-07-16 2018-12-21 深圳太辰光通信股份有限公司 Oil-immersed transformer Intellectual Gauge of Temperature and its data processing method
CN114705928A (en) * 2022-03-09 2022-07-05 天纳能源科技(上海)有限公司 Transformer data management method and system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102879696A (en) * 2012-10-24 2013-01-16 上海市电力公司 Automatic judgment method for over-load operational feasibility of transformer
CN103698033A (en) * 2013-12-17 2014-04-02 广西电网公司电力科学研究院 Transformer winding hot-spot temperature forecasting evaluation system with self-adaption function
CN105203887A (en) * 2015-10-20 2015-12-30 国家电网公司 Prewarning method, device and system for overload of transformer
CN108680801A (en) * 2018-03-23 2018-10-19 国网河北省电力有限公司电力科学研究院 A kind of transformer overload computational methods, system and terminal device
CN109060158A (en) * 2018-07-16 2018-12-21 深圳太辰光通信股份有限公司 Oil-immersed transformer Intellectual Gauge of Temperature and its data processing method
CN114705928A (en) * 2022-03-09 2022-07-05 天纳能源科技(上海)有限公司 Transformer data management method and system
CN114705928B (en) * 2022-03-09 2023-02-10 天纳能源科技(上海)有限公司 Transformer data management method and system

Similar Documents

Publication Publication Date Title
CN202362089U (en) Overload pre-warning system for transformer
CN105301281A (en) Monitoring method and device for flowing speed of transformer oil flow
CN202093670U (en) Wireless temperature measuring system based on electrical power system
CN202710132U (en) Liquid level detecting device and shield tunneling machine
CN103983881A (en) Fault diagnosis method and device for nuclear detector
CN201464067U (en) On-line monitoring instrument for transformer oil temperature
CN202885962U (en) Detection and analytic system for gas insulation composite apparatus shell vibration signal in service
CN205246243U (en) Transmission line temperature on -line monitoring system
CN202599441U (en) System for acquiring state data of power transformer
CN201884537U (en) Intelligent viscous damper
CN202600435U (en) Transformer cooling control system
CN202871012U (en) Electric fire monitor system of electric cable well of intelligent building
CN207738861U (en) A kind of aluminium electrolytic cell short-circuit port insulated monitoring warning device
CN202885987U (en) One-host multipoint wireless temperature measuring device
CN202599442U (en) A real-time data sampling device of a transformer station
CN205506200U (en) Monitoring of rotor vibration state and failure analysis system based on current vortex sensor
CN203376051U (en) Power cable operation vibration monitoring system based on acceleration sensor
CN203984098U (en) A kind of device for quick testing of powerline network
CN203310522U (en) High-voltage cabinet contact high-temperature sensor node apparatus with intelligent module
CN203629690U (en) ZigBee-based high-tension switch cabinet wireless temperature measurement system
CN203774875U (en) Power supply monitoring device
CN203149053U (en) Power quality monitoring system based on SOPC
CN205317910U (en) Battery performance monitoring circuit arrangement
CN202994318U (en) Switch cabinet temperature-rise test data acquisition system
CN202956144U (en) Transformer load monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120801

Termination date: 20151205

EXPY Termination of patent right or utility model