CN202360107U - 隧道泡沫混凝土减震结构 - Google Patents
隧道泡沫混凝土减震结构 Download PDFInfo
- Publication number
- CN202360107U CN202360107U CN2012200296825U CN201220029682U CN202360107U CN 202360107 U CN202360107 U CN 202360107U CN 2012200296825 U CN2012200296825 U CN 2012200296825U CN 201220029682 U CN201220029682 U CN 201220029682U CN 202360107 U CN202360107 U CN 202360107U
- Authority
- CN
- China
- Prior art keywords
- layer
- tunnel
- foam concrete
- shock
- absorbing structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型涉及一种隧道泡沫混凝土减震结构,隧道泡沫混凝土减震结构,在隧道拱部和边墙的内层和外层之间设置缓冲层,内层为初期支护层,包括钢拱架和钢筋网片;外层为二次衬砌层;缓冲层为泡沫混凝土层,在初期支护层的外侧钢筋网片上焊接连接钢筋;连接钢筋沿隧道拱部和边墙按周向均布,连接钢筋的连接钢筋的长度设定为伸到泡沫混凝土层中。利用泡沫混凝土的低弹减震性,对地震产生的冲击载荷起到良好的吸收和分散作用。隧道内围岩结合初期支护层能最大限度的起到受力作用,二次衬砌层起到安全储备和美观的作用。
Description
技术领域
本实用新型涉及一种隧道内减震结构,特别是在隧道初期支护和二次衬砌之间采用泡沫混凝土减震的结构。
背景技术
目前大部分隧道设计原理均为新奥法,新奥法是应用岩体力学理论,以维护和利用围岩的自承能力为基点,采用锚杆和喷射混凝土为主要手段进行支护,控制围岩的变形和松弛,使围岩成为支护体系的组成部分,并通过对围岩和支护的量测、监控来指导隧道施工和地下工程设计施工的方法。地震时对岩层的冲击作用会使围岩的自承能力在瞬间受到破坏。
实用新型内容
本实用新型的目的在于克服上述现有技术存在的不足,提供一种隧道泡沫混凝土减震结构,采用该结构,隧道坚固美观,在发生地震灾害时能够最大限度减少破坏程度,保障隧道及隧道通行安全。
为实现上述目的,本实用新型采取如下技术方案:
隧道泡沫混凝土减震结构,在隧道拱部和边墙的内层和外层之间设置缓冲层,内层为初期支护层,外层为二次衬砌层;其特征在于:缓冲层为泡沫混凝土层。
按上述技术方案,泡沫混凝土层厚度为20-30cm。
按上述技术方案,在初期支护层的外侧钢筋网片上焊接连接钢筋;连接钢筋沿隧道拱部和边墙按周向均布;同时,连接钢筋沿隧道里程方向在钢筋网片上均匀间隔分布。
按上述技术方案,连接钢筋沿隧道拱部和边墙的周向间距为30-50mm;连接钢筋起始于钢筋网片,连接钢筋的长度设定为伸到泡沫混凝土层中10±cm。
按上述技术方案,所述的初期支护层中,连接钢筋与钢筋网片固定在一起后安装。
按上述技术方案,所述的二次衬砌层在泡沫混凝土层成型后施工。
上述隧道泡沫混凝土减震结构的施工方法,其特征在于包括如下流程:
第一步 施工准备:根据洞内围岩类别,首先进行辅助施工,插打超前注浆小导管或者超前锚杆后将洞身开挖成型;同时制备钢筋网片,在钢筋网片上焊接连接钢筋;
第二步 洞身开挖成型后,进行初期支护层的施工,包括插打***锚杆、钢拱架、安装钢筋网片,喷射混凝土施工形成初期支护层;
第三步 衬砌台车拼装;
第四步 隧道内铺设好衬砌台车走行轨道,将衬砌台车走行到泡沫混凝土层施工位置;
第五步 调试衬砌台车,将台车模板顶推到位,同时将原材料、制作泡沫混凝土的发泡机就位;
第六步 浇筑泡沫混凝土层:用发泡机制作泡沫混凝土,通过台车模板的预留孔,进行泡沫混凝土层的浇筑;
第七步 泡沫混凝土层施工完毕七天后进行脱模;
第八步 衬砌台车移位或进行走行到下一施工节段;
第九步 泡沫混凝土层施工完毕后,施工二次衬砌层。
与传统的衬砌结构和施工方式相比,本实用新型具有如下优点:
1、利用泡沫混凝土的低弹减震性,对地震产生的冲击载荷起到良好的吸收和分散作用;在围岩结构遭到破坏后,能够重新形成一个稳定结构,在隧道内起到很好的减震效果。
2、采用衬砌台车移位施工,配合台车模板进行泡沫混凝土层浇筑,在施工工程中没有设备之间的更换协调,节省了时间。
3、隧道内围岩结合初期支护层能最大限度的起到受力作用,二次衬砌层起到安全储备和美观的作用。
附图说明:
图1是根据本实用新型实施的隧道泡沫混凝土减震结构示意图(断面图);
图2是图1的隧道拱部部分放大图;
图3是本实用新型的施工方法流程图。
图中1.初期支护层,2.钢筋网片,3.泡沫混凝土层,4.二次衬砌层,5.连接钢筋。
具体实施方式:
以下结合实施实例及附图对本实用新型作进一步说明,但不限定本实用新型。
如图1和2中所示的隧道泡沫混凝土减震结构,其特征在于:在隧道拱部和边墙的初期支护层和二次衬砌层之间增加泡沫混凝土层,利用泡沫混凝土的低弹减震性,对地震产生的冲击载荷起到良好的吸收和分散作用。
在隧道初期支护层1和隧道二次衬砌层4中间施工20-30cm厚度的泡沫混凝土层3。
为增加泡沫混凝土层3与初期支护层1的连接力,在初期支护层1的钢筋网片2上焊接连接钢筋5;连接钢筋5沿隧道拱部和边墙按周向均布,且周向间距为30-50mm,优选40cm;同时,连接钢筋5沿隧道里程方向(垂直于周向)钢筋网片2上按间距1m均匀间隔分布;连接钢筋5起始于钢筋网片2的内侧环周,连接钢筋5的长度设定为伸到泡沫混凝土层3中10cm左右。
如图3所示,上述隧道泡沫混凝土减震结构的施工方法包括如下流程:
第一步 施工准备:
根据洞内围岩类别,首先进行辅助施工,插打超前注浆小导管或者超前锚杆后将洞身开挖成型;同时制备钢筋网片2,在钢筋网片2上焊接连接钢筋5;
第二步 洞身开挖成型后,进行初期支护层1的施工,包括插打***锚杆、钢拱架、安装钢筋网片2,喷射混凝土施工形成初期支护层1;
第三步 衬砌台车拼装;
第四步 隧道内铺设好衬砌台车走行轨道,将衬砌台车走行到泡沫混凝土层3施工位置;
第五步 调试衬砌台车,将台车模板顶推到位,同时将原材料、制作泡沫混凝土的发泡机就位;
第六步 浇筑泡沫混凝土层3:用发泡机制作泡沫混凝土,通过台车模板的预留孔,进行泡沫混凝土层3的浇筑;
第七步 泡沫混凝土层3施工完毕七天后进行脱模;
第八步 衬砌台车移位或进行走行到下一施工节段;
第九步 泡沫混凝土层3施工完毕后,施工二次衬砌层4。
上述方法形成的减震结构有如下优势:在围岩结构遭到破坏后,能够重新形成一个稳定结构,所以在隧道结构中增加泡沫混凝土层3作为缓冲层来减缓冲击是必要而可行的;由于隧道内围岩结合初期支护层能最大限度的起到受力作用,二次衬砌层起到安全储备和美观的作用,故将缓冲层设置在初期支护和二次衬砌之间是最恰当的。
以上所揭露的仅为本实用新型的较佳实施例而已,本实用新型的核心在于利用泡沫混凝土的低弹减震性,在隧道初期支护与二次衬砌之间起到良好的缓冲减震作用,当然不能以此来限定本实用新型之权利范围,因此依本实用新型申请专利范围所作的等效变化,仍属本实用新型的保护范围。
Claims (2)
1.隧道泡沫混凝土减震结构,在隧道拱部和边墙的内层和外层之间设置缓冲层,内层为初期支护层,外层为二次衬砌层;其特征在于:缓冲层为泡沫混凝土层;
泡沫混凝土层厚度为20-30cm;
在初期支护层的外侧钢筋网片上焊接连接钢筋;连接钢筋沿隧道拱部和边墙按周向均布,同时,连接钢筋沿隧道里程方向在钢筋网片上均匀间隔分布。
2.根据权利要求1所述的减震结构,其特征在于:连接钢筋沿隧道拱部和边墙的周向间距为30-50mm;连接钢筋起始于钢筋网片,连接钢筋的长度设定为伸到泡沫混凝土层中10±cm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200296825U CN202360107U (zh) | 2012-01-30 | 2012-01-30 | 隧道泡沫混凝土减震结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200296825U CN202360107U (zh) | 2012-01-30 | 2012-01-30 | 隧道泡沫混凝土减震结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202360107U true CN202360107U (zh) | 2012-08-01 |
Family
ID=46571298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200296825U Expired - Lifetime CN202360107U (zh) | 2012-01-30 | 2012-01-30 | 隧道泡沫混凝土减震结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202360107U (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368720A (zh) * | 2016-10-10 | 2017-02-01 | 三峡大学 | 胎式衬砌与泡沫混凝土联合使用的支护结构及施工方法 |
CN106401612A (zh) * | 2016-12-01 | 2017-02-15 | 河北工程大学 | 一种隧道内预制钢板支撑结构 |
CN106555598A (zh) * | 2016-11-15 | 2017-04-05 | 成都天佑智隧科技有限公司 | 一种初支二衬留空分离式结构及其外模与缓冲层施作方法 |
CN106593493A (zh) * | 2017-01-05 | 2017-04-26 | 陈立平 | 一种具有自动荷载调节功能的隧道防水层 |
CN106703884A (zh) * | 2017-01-13 | 2017-05-24 | 中南大学 | 一种深井硬岩高温巷道壁面隔热层降温方法 |
CN109026016A (zh) * | 2018-07-10 | 2018-12-18 | 西南交通大学 | 一种穿越走滑断层的隧道的修建方法 |
CN113309539A (zh) * | 2021-07-13 | 2021-08-27 | 辽宁工程技术大学 | 一种具有减震且应力预警作用的隧道支护结构 |
-
2012
- 2012-01-30 CN CN2012200296825U patent/CN202360107U/zh not_active Expired - Lifetime
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368720A (zh) * | 2016-10-10 | 2017-02-01 | 三峡大学 | 胎式衬砌与泡沫混凝土联合使用的支护结构及施工方法 |
CN106555598A (zh) * | 2016-11-15 | 2017-04-05 | 成都天佑智隧科技有限公司 | 一种初支二衬留空分离式结构及其外模与缓冲层施作方法 |
CN106555598B (zh) * | 2016-11-15 | 2019-06-04 | 成都天佑智隧科技有限公司 | 一种初支二衬留空分离式结构及其外模与缓冲层施作方法 |
CN106401612A (zh) * | 2016-12-01 | 2017-02-15 | 河北工程大学 | 一种隧道内预制钢板支撑结构 |
CN106593493A (zh) * | 2017-01-05 | 2017-04-26 | 陈立平 | 一种具有自动荷载调节功能的隧道防水层 |
CN106593493B (zh) * | 2017-01-05 | 2019-04-05 | 陈立平 | 一种具有自动荷载调节功能的隧道防水层 |
CN106703884A (zh) * | 2017-01-13 | 2017-05-24 | 中南大学 | 一种深井硬岩高温巷道壁面隔热层降温方法 |
CN109026016A (zh) * | 2018-07-10 | 2018-12-18 | 西南交通大学 | 一种穿越走滑断层的隧道的修建方法 |
CN113309539A (zh) * | 2021-07-13 | 2021-08-27 | 辽宁工程技术大学 | 一种具有减震且应力预警作用的隧道支护结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102562091A (zh) | 隧道泡沫混凝土减震结构及其施工方法 | |
CN202360107U (zh) | 隧道泡沫混凝土减震结构 | |
CN102383806B (zh) | 隧道穿越特大型溶洞施工工艺 | |
SE1750912A1 (en) | Support structure for tunnel having ultra-large variable section | |
CN102758642A (zh) | 上软下硬地层大跨隧道叠合承载拱结构及其施工方法 | |
CN104975861A (zh) | 用于隧道拱顶塌腔处理的非扰动型支护结构 | |
CN204877493U (zh) | 一种软岩隧道支护结构 | |
CN204729099U (zh) | 岩质地层暗挖三层地铁车站伞盖结构 | |
CN104405411A (zh) | 超大变断面隧道支护结构 | |
CN102562097A (zh) | 三维非对称支护*** | |
CN103032080A (zh) | 软弱破碎围岩隧道的支护方法 | |
CN103061779B (zh) | 矿山隧道新型支护结构的施工方法 | |
CN204920975U (zh) | 一种隧道支护结构 | |
CN106894826B (zh) | 一种洞内塌方段的支护结构及支护方法 | |
CN206957731U (zh) | 一种洞内塌方段的支护结构 | |
CN203614107U (zh) | 马头门复合支护结构 | |
CN104632248B (zh) | 一种隧道顶部溶洞的防护处治方法 | |
CN202991054U (zh) | 矿山隧道新型支护结构 | |
CN202673299U (zh) | 一种软弱围岩隧道双层模筑复合式衬砌支护结构 | |
CN204738819U (zh) | 隧道用非扰动型塌腔支护结构 | |
CN104632228A (zh) | 横通道进入正线施工方法及横通道 | |
CN201521305U (zh) | 一种用于软弱围岩支护的钢筋拱肋结构 | |
CN115142854B (zh) | 矿山法隧道单层衬砌结构体系及施工方法 | |
CN102996142B (zh) | 矿山隧道吊环固定式支护结构的施工方法 | |
CN210049909U (zh) | 一种公路隧道型钢混凝土支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120801 |