CN202356658U - Four-axis parallel boring machine with high efficiency and high accuracy - Google Patents

Four-axis parallel boring machine with high efficiency and high accuracy Download PDF

Info

Publication number
CN202356658U
CN202356658U CN2011204157329U CN201120415732U CN202356658U CN 202356658 U CN202356658 U CN 202356658U CN 2011204157329 U CN2011204157329 U CN 2011204157329U CN 201120415732 U CN201120415732 U CN 201120415732U CN 202356658 U CN202356658 U CN 202356658U
Authority
CN
China
Prior art keywords
boring
lathe bed
machine
high efficiency
high accuracy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204157329U
Other languages
Chinese (zh)
Inventor
付文锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011204157329U priority Critical patent/CN202356658U/en
Application granted granted Critical
Publication of CN202356658U publication Critical patent/CN202356658U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model relates to a boring machine, specifically relating to a four-axis parallel boring machine with high efficiency and high accuracy. The four-axis parallel boring machine with high efficiency and high accuracy comprises a mechanical skid plateform, a boring and milling head, machine body carriages, a machine body, a cross adjustment device, a vertical adjustment device and a motor, wherein two ends on the machine body are respectively provided with a machine body carriage; the vertical adjustment device is arranged between the machine tool carriage of the right end and the machine body; the motor is arranged on the vertical adjustment device; the machine tool carriages are respectively provided with the mechanical skid plateform and the boring and milling head; and the cross adjustment is arranged between the mechanical skid plateform and the boring and milling head. Compared with the prior arts, the above technical scheme provided by the utility model has the advantages of having simple structure, being easy in operation, and fixing each group of boring heads on the same benchmark, wherein the boring heads can move along the same benchmark with reliable movement, high efficiency, high accuracy and high quality stability.

Description

High efficiency, four parallel boring machines of high accuracy
Technical field:
The utility model relates to a kind of boring machine, specifically a kind of high efficiency, four parallel boring machines of high accuracy.
Background technology:
In machine industry, the car body of extensive use has four wheels more, and the positioning accuracy of four wheels often directly influences its running precision.The quality of the form and position tolerance of four hole work in-processes of four installation wheel shafts and phase closing precision is one of key that guarantees its quality on the car body.Otherwise, have to take other remedial measures.
For example; In the continuous pallettype sintering machine of metallurgy industry; Its car body is extremely important parts, accounts for the over half of complete machine weight, and the machining accuracy of its four axle holes particularly positional precision directly influences its running quality; Take place if " gnaw " phenomenon, can have a strong impact on life-span and the production efficiency and the product quality of entire equipment.And this phenomenon is very general in the same industry!
In reality, manufactory is to use common boring machine to carry out bore hole more, workpiece through the moving of workbench, four axis holes are processed in rotation; The precision in each hole leans on the operator to grasp with technology by rule of thumb at random entirely; Be difficult to realize the accuracy of form and position requirement in four holes, quality is extremely unstable, and efficient is very low.Every per tour can only be processed one generally speaking.The same flatness that at first is four hole axial lines is poor, secondly is that the axiality in relative two holes is poor, moreover is the pitch-row low precision, is that the depth of parallelism of axial line is poor in addition.Error amount is extremely dispersed.
Summary of the invention:
The goal of the invention of the utility model is to overcome the prior art deficiency; Provide a kind of simple in structure, processing ease, every group of boring head to be fixed on the same benchmark; And can move along same benchmark, reliable in action, efficient are high, precision is high, a kind of high efficiency that quality stability is good, four parallel boring machines of high accuracy.
The purpose of the utility model is to adopt following technical scheme to accomplish:
A kind of high efficiency, four parallel boring machines of high accuracy comprise mechanical skid plateform, milling and boring heads, lathe bed planker, lathe bed, horizontal adjusting device, longitudinal adjusting device, motor; Described
The lathe bed planker is equipped with at two ends respectively on the lathe bed; Between the lathe bed planker of said right-hand member and the lathe bed longitudinal adjusting device is housed; On the described longitudinal adjusting device motor is housed; Mechanical skid plateform and milling and boring heads are housed respectively on the described lathe bed planker successively; Between described mechanical skid plateform and the lathe bed planker horizontal adjusting device is housed.
Adopt technique scheme, compared with prior art, the utility model has the advantages that:
The utility model is simple in structure, processing ease, every group of boring head are fixed on the same benchmark, and can move along same benchmark, reliable in action, efficient is high, precision is high, quality stability is good.
Description of drawings
Fig. 1 is the front view of the utility model.
Fig. 2 is the vertical view of the utility model.
Among the figure: mechanical skid plateform 1, milling and boring heads 2, lathe bed planker 3, lathe bed 4, workpiece installing rack 5, horizontal adjusting device 6, longitudinal adjusting device 7, motor 8.
The specific embodiment:
See Fig. 1, Fig. 2, a kind of high efficiency, four parallel boring machines of high accuracy comprise mechanical skid plateform 1, milling and boring heads 2, lathe bed planker 3, lathe bed 4, horizontal adjusting device 6, longitudinal adjusting device 7, motor 8; Two lathe bed plankers 3 are equipped with at two ends respectively on the lathe bed 4; Between the lathe bed planker 3 of its right-hand member and the lathe bed 4 longitudinal adjusting device 7 is housed; Motor 8 is housed on the longitudinal adjusting device 7; Two mechanical skid plateforms and two milling and boring heads 2 are housed respectively on each lathe bed planker 3 successively; Horizontal adjusting device 6 is housed between mechanical skid plateform 1 and the lathe bed planker 3.
The method for using of the utility model is:
See Fig. 1, Fig. 2, precision adjustment: make the spindle centerline of two milling and boring heads 2 be adjusted to concentricity and reach technological requirement, and reach technological requirement with the bed ways keeping parallelism; Adjust other two milling and boring heads 2 as stated above and reach technological requirement; Adjust the centre-to-centre spacing between per two groups then, reach technological requirement.When they on lathe bed supporting plate 3, adjust apart from the time because on same lathe bed 4, can keep precision unified.
Processing work: workpiece installing rack 6 is installed on the lathe bed supporting plate 3 by technological requirement; Again work piece is installed on the workpiece installing rack 6; And, each milling and boring heads 2 is loaded onto rough turn knife bar respectively with behind the buting iron location, location, start button carries out once rough turn work step by the cutting data of setting automatically; Half finish turning knife bar is installed is respectively again accomplished secondary half finish turning work step; The finish turning knife bar is installed is respectively at last accomplished the finish turning work step, after the inspection precision according with process requirements, unload work piece, change new part, repeat tooling step, need be at the adjustment lathe.

Claims (1)

1. a high efficiency, four parallel boring machines of high accuracy is characterized in that: comprise mechanical skid plateform, milling and boring heads, lathe bed planker, lathe bed, horizontal adjusting device, longitudinal adjusting device, motor; The lathe bed planker is equipped with at two ends respectively on the described lathe bed; Between the lathe bed planker of said right-hand member and the lathe bed longitudinal adjusting device is housed; On the described longitudinal adjusting device motor is housed; Mechanical skid plateform and milling and boring heads are housed respectively on the described lathe bed planker successively; Between described mechanical skid plateform and the lathe bed planker horizontal adjusting device is housed.
CN2011204157329U 2011-10-18 2011-10-18 Four-axis parallel boring machine with high efficiency and high accuracy Expired - Fee Related CN202356658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204157329U CN202356658U (en) 2011-10-18 2011-10-18 Four-axis parallel boring machine with high efficiency and high accuracy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204157329U CN202356658U (en) 2011-10-18 2011-10-18 Four-axis parallel boring machine with high efficiency and high accuracy

Publications (1)

Publication Number Publication Date
CN202356658U true CN202356658U (en) 2012-08-01

Family

ID=46567875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204157329U Expired - Fee Related CN202356658U (en) 2011-10-18 2011-10-18 Four-axis parallel boring machine with high efficiency and high accuracy

Country Status (1)

Country Link
CN (1) CN202356658U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104475796A (en) * 2014-12-11 2015-04-01 无锡大龙马数控机床制造有限责任公司 Circular shaft dual-end surface synchronous boring and milling device
CN104607688A (en) * 2014-12-12 2015-05-13 芜湖奇峰操控索有限公司 Double-end ring rolling machine for inhaul cable sheath

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104475796A (en) * 2014-12-11 2015-04-01 无锡大龙马数控机床制造有限责任公司 Circular shaft dual-end surface synchronous boring and milling device
CN104607688A (en) * 2014-12-12 2015-05-13 芜湖奇峰操控索有限公司 Double-end ring rolling machine for inhaul cable sheath

Similar Documents

Publication Publication Date Title
CN201613452U (en) Gantry type boring, milling and grinding combined numerical control machine
CN107052802B (en) Turning and milling composite machine tool
CN103042393A (en) Combined milling and grinding machine tool
CN204235120U (en) Numerical control pipe bores milling machine
CN201552473U (en) Long-axis part two-end hole processing numerical control machine tool
CN204430333U (en) The special purpose machine tool of processing differential casing
CN202356658U (en) Four-axis parallel boring machine with high efficiency and high accuracy
CN204935081U (en) Control arm special machine tool
CN204381470U (en) A kind of novel vertical sleeping combination multi spindle drilling machine
CN102152177A (en) Five-axis linkage tool grinder with detection device
CN106975986B (en) Double-shaft composite processing equipment for automobile front bridge
CN203380704U (en) Vertical and horizontal type processing machine
CN203557219U (en) Multi-shaft machine head numerical control machine tool
CN201168808Y (en) Boring machine
CN101195175A (en) Coaxial large strided distance ear base hole boring auxiliary device and boring process method
CN203343760U (en) Spindle sleeve finish machining jig
CN104924085A (en) Milling and drilling combined machine tool for car axle head
CN205393993U (en) Bore to high speed in multidirectional valve flange hole and mill lathe
CN204673280U (en) Machining aggregate machinery is bored in the milling of Automobile shaft spindle nose
CN210451822U (en) Supporting mechanism capable of keeping linear motion precision of boring and milling spindle boring rod
CN204075998U (en) A kind of column for grinding machine
CN204108647U (en) Handle of a knife
CN102975021A (en) Numerical control turning and grinding compound lathe
CN102896363A (en) Drilling jig device for positioning pin hole of shell of coal cutter
CN208977520U (en) Horizontal cold carving machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NORTH CHINA ELECTRIC POWER UNIVERSITY (BAODING)

Free format text: FORMER OWNER: FU WENFENG

Effective date: 20120723

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 063000 TANGSHAN, HEBEI PROVINCE TO: 071000 BAODING, HEBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120723

Address after: 071000 21-2-701, Century Chinese community, Baoding, Hebei

Patentee after: North China Electric Power University (Baoding)

Address before: 063000 Hebei Province, Tangshan City Road North Yufeng Building 305 Building 2 101

Patentee before: Fu Wenfeng

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120801

Termination date: 20121018