CN202305748U - Testing device for remote control motherboard of distribution automation terminal - Google Patents

Testing device for remote control motherboard of distribution automation terminal Download PDF

Info

Publication number
CN202305748U
CN202305748U CN2011204158603U CN201120415860U CN202305748U CN 202305748 U CN202305748 U CN 202305748U CN 2011204158603 U CN2011204158603 U CN 2011204158603U CN 201120415860 U CN201120415860 U CN 201120415860U CN 202305748 U CN202305748 U CN 202305748U
Authority
CN
China
Prior art keywords
remote control
control mainboard
testing device
terminal remote
distribution automation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204158603U
Other languages
Chinese (zh)
Inventor
何远文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aerospace Science and Industry Shenzhen Group Co Ltd
Original Assignee
Aerospace Science and Industry Shenzhen Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aerospace Science and Industry Shenzhen Group Co Ltd filed Critical Aerospace Science and Industry Shenzhen Group Co Ltd
Priority to CN2011204158603U priority Critical patent/CN202305748U/en
Application granted granted Critical
Publication of CN202305748U publication Critical patent/CN202305748U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

The utility model relates to a testing device for a remote control motherboard, in particular to the testing device for the remote control motherboard of a distribution automation terminal. The testing device comprises twelve buttons and a serial interface, wherein twelve joints of the serial interface are respectively connected with twelve joints of an interface of the remote control motherboard of the tested terminal and connected with a first end of each of the twelve buttons which can control corresponding indicator lamps on the remote control motherboard to be turned on or turned off; and a second end of each of the twelve buttons is connected with a remote control power supply of the tested terminal. The testing device is connected with a +24V remote control power supply of the tested terminal, the serial interface of the testing device is connected with the interface of the remote control motherboard of the tested terminal, the corresponding buttons are pressed down to simulate turn-off or turn-on, the indicator lamps on the remote control motherboard of the tested terminal are observed to judge whether the remote control motherboard of the tested terminal is poor, the test can be conducted only by one person, and the testing device for the remote control motherboard of the distribution automation terminal is implemented.

Description

The proving installation of a kind of distribution automation terminal remote control mainboard
Technical field
The utility model relates to a kind of proving installation of remote control mainboard, relates in particular to the proving installation of a kind of distribution automation terminal remote control mainboard.
Background technology
Remote control mainboard in distribution automation terminal has 12 pilot lamp to be used to indicate remote control to carry out the situation of divide-shut brake above.In the time will testing to this remote control mainboard, a necessary personal computation maintenance software remote control separating brake or a combined floodgate, another one people then observes the light on and off of remote control mainboard pilot lamp at the scene and the situation of divide-shut brake checks whether this remote control mainboard is bad.
The utility model content
The fundamental purpose of the utility model is to provide the proving installation of a kind of distribution automation terminal remote control mainboard, need two people to cooperate when being intended to solve present debugging remote control mainboard and the test that causes slow with the problem that is not easy to produce in batches.
The utility model is to realize like this; The proving installation of a kind of distribution automation terminal remote control mainboard; It comprises 12 buttons and 1 serial line interface that can control corresponding pilot lamp light on and off on the remote control mainboard, and said proving installation is connected with dut terminal remote control mainboard interface; Said dut terminal remote control mainboard interface comprise respectively with said remote control mainboard on 12 12 joints that pilot lamp is connected; It is characterized in that; Said serial line interface comprises 12 joints that are connected with 12 joints of said dut terminal remote control mainboard interface respectively; 12 joints of said serial line interface also are connected with first end of said 12 buttons respectively, and second end of said 12 buttons all connects the dut terminal remote circuit.
In the said structure, said serial line interface is 15 pin serial line interfaces.
In the said structure, the voltage of said dut terminal remote circuit is+24V.
In the utility model; Proving installation is met dut terminal remote circuit+24V; Then the serial ports of proving installation is connect the interface of dut terminal remote control mainboard, press corresponding button and simulate separating brake or combined floodgate, observe dut terminal remote control mainboard pilot lamp and judge whether dut terminal remote control mainboard is bad; Only need a people just can test, realized the proving installation of distribution automation terminal remote control mainboard.
Description of drawings
Fig. 1 is the structural drawing of the proving installation of the distribution automation terminal remote control mainboard that provides of the utility model embodiment;
Embodiment
For the purpose, principle and the advantage that make the utility model is clearer,, the utility model is further elaborated below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
Fig. 1 shows the structure of the proving installation of the distribution automation terminal remote control mainboard that the utility model embodiment provides, and for the ease of explanation, only shows the part relevant with the utility model embodiment, and details are as follows.
The proving installation of a kind of distribution automation terminal remote control mainboard; Be connected with the interface of dut terminal remote control mainboard 300; The interface of dut terminal remote control mainboard 300 comprise respectively with remote control mainboard 300 on 12 12 joints that pilot lamp is connected; Proving installation comprises 12 button 100 and 1 serial line interface 200 that can control corresponding pilot lamp light on and off on the remote control mainboard; 12 joints of serial line interface 200 respectively with the interface of dut terminal remote control mainboard 300 on 12 joints be connected, 12 joints of serial line interface 200 also are connected with first end of said 12 buttons 100 respectively, second end of said 12 buttons 100 all connects the dut terminal remote circuit.
As the utility model one embodiment, serial line interface 200 is 15 pin serial line interfaces.
As the utility model one embodiment, the voltage of dut terminal remote circuit is+24V.
In the utility model; Proving installation is met dut terminal remote circuit+24V; Then the serial ports of proving installation is connect the interface of dut terminal remote control mainboard, press corresponding button and simulate separating brake or combined floodgate, observe dut terminal remote control mainboard pilot lamp and judge whether dut terminal remote control mainboard is bad; Only need a people just can test, realized the proving installation of distribution automation terminal remote control mainboard.
The above is merely the preferred embodiment of the utility model; Not in order to restriction the utility model; Any modification of being done within all spirit and principles at the utility model, be equal to replacement and improvement etc., all should be included within the protection domain of the utility model.

Claims (3)

1. the proving installation of a distribution automation terminal remote control mainboard, it comprises 12 buttons and 1 serial line interface that can control corresponding pilot lamp light on and off on the remote control mainboard, said proving installation is connected with dut terminal remote control mainboard interface; Said dut terminal remote control mainboard interface comprise respectively with said remote control mainboard on 12 12 joints that pilot lamp is connected; It is characterized in that; Said serial line interface comprises 12 joints that are connected with 12 joints of said dut terminal remote control mainboard interface respectively; 12 joints of said serial line interface also are connected with first end of said 12 buttons respectively, and second end of said 12 buttons all connects the dut terminal remote circuit.
2. the proving installation of distribution automation as claimed in claim 1 terminal remote control mainboard is characterized in that, said serial line interface is 15 pin serial line interfaces.
3. the proving installation of distribution automation as claimed in claim 1 terminal remote control mainboard is characterized in that the voltage of said dut terminal remote circuit is+24V.
CN2011204158603U 2011-10-27 2011-10-27 Testing device for remote control motherboard of distribution automation terminal Expired - Fee Related CN202305748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204158603U CN202305748U (en) 2011-10-27 2011-10-27 Testing device for remote control motherboard of distribution automation terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204158603U CN202305748U (en) 2011-10-27 2011-10-27 Testing device for remote control motherboard of distribution automation terminal

Publications (1)

Publication Number Publication Date
CN202305748U true CN202305748U (en) 2012-07-04

Family

ID=46374620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204158603U Expired - Fee Related CN202305748U (en) 2011-10-27 2011-10-27 Testing device for remote control motherboard of distribution automation terminal

Country Status (1)

Country Link
CN (1) CN202305748U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104331061A (en) * 2014-08-28 2015-02-04 航天科工深圳(集团)有限公司 Test method and test device of core board of distribution network terminal device
CN108594105A (en) * 2018-02-07 2018-09-28 深圳微步信息股份有限公司 The detection method of mainboard indication lamp control circuit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104331061A (en) * 2014-08-28 2015-02-04 航天科工深圳(集团)有限公司 Test method and test device of core board of distribution network terminal device
CN108594105A (en) * 2018-02-07 2018-09-28 深圳微步信息股份有限公司 The detection method of mainboard indication lamp control circuit

Similar Documents

Publication Publication Date Title
CN203396869U (en) Integrated test equipment
CN202305748U (en) Testing device for remote control motherboard of distribution automation terminal
CN202256646U (en) Analog remote signaling control and measurement device
CN202421395U (en) Testing tool for universal serial bus (USB) interface
CN104407537A (en) Multifunctional intelligent socket system
CN204228912U (en) A kind of electric automatization facility switching tests pick-up unit automatically
CN202330638U (en) Online automatic test system for printed circuit board
CN205427133U (en) A stretcher for subway signal modules simulation tests
CN202210373U (en) Digital circuit and micro-processing system development board
CN203759956U (en) Special transformer collection information acquiring simulated training device
CN203929914U (en) Test the protective relaying device servicing unit of actuation time
CN203733339U (en) Anti-electricity stealing program controlled simulation apparatus
CN202711239U (en) Computer system
CN202795888U (en) Modular programmable control practical training device
CN207007879U (en) High pressure and ground connection Auto-Test System
CN205158761U (en) Electrician is equipment of instructing in fact
CN205038276U (en) Intelligence boundary switch computer protection device output functional test platform
CN202332026U (en) Simulative function board for desktop computer interface circuit
CN205643683U (en) Ampere meter with measurement interface
CN203480004U (en) Power supply test fixture system
CN205301522U (en) Digit NULL tester
CN204903692U (en) Multicore cable wire size measuring device
CN202453871U (en) Reset circuit simulation functional board for desktop computer
CN203812034U (en) Comprehensive training device for ship/vessel-used lighting system
CN109697911A (en) A kind of driver's terminal emulator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20201027