CN202299362U - Erecting structure for suspension type scaffold of pipe rack - Google Patents
Erecting structure for suspension type scaffold of pipe rack Download PDFInfo
- Publication number
- CN202299362U CN202299362U CN2011204509262U CN201120450926U CN202299362U CN 202299362 U CN202299362 U CN 202299362U CN 2011204509262 U CN2011204509262 U CN 2011204509262U CN 201120450926 U CN201120450926 U CN 201120450926U CN 202299362 U CN202299362 U CN 202299362U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- suspension type
- cross bar
- rods
- vertical pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to an erecting structure for a suspension type scaffold of a pipe rack. The erecting structure comprises a plurality of horizontal rods, a plurality of longitudinal rods, a plurality of vertical rods, a plurality of fasteners, a beam on a constructed building and a door-shaped frame, wherein the horizontal rods, the longitudinal rods and the vertical rods are fastened through the fasteners; the door-shaped frame is a rectangle with an opening; circular rings are respectively connected with tail ends on two sides of an opening end; the two circular rings are same in axial direction; the planes of the circular rings are vertical to the plane of the rectangle; the horizontal rods or the longitudinal rods pass through the two circular rings; and the door-shaped frame is suspended on the beam. In order to overcome the difficulty in erecting the scaffold, a suspension type full framing scaffold is selected in the erecting structure, so that the safety risk in the crosswise operated ground civil work and pipe distributing operation for the pipe rack is reduced, the ground under the pipe rack after the civil work is finished is used as a place for the prefabricating and heat-insulating prefabricating of the pipeline, and the problem of narrow place is completely solved.
Description
Technical field
The present technique scheme belongs to construction engineering technical field, specifically is a kind of suspension type piping lane scaffold building structure.
Background technology
Construction work is increasingly high for the safety requirements of engineering during engineering construction now, scaffold as the application of a conventional means of safety in production also more and more widely, scaffold had become essential technical safety measures in the project construction that has in the past.In the prior art, the difficult point that scaffold building generally can run into has: the project construction period is tighter; Crossed construction is frequent, and the piping lane main structure had been basically completed and has possessed the craft piping condition at that time, but the ground construction of civil engineering still has a lot; Project plant area space is comparatively compact; It is higher to set up the full hall of tradition scaffold expense.Because crossed construction often can not be set up scaffold from bottom to top with following the prescribed order, runs into and must use the scene that scaffold could be constructed, and just can not in time complete.
Summary of the invention
In order to solve the problems referred to above that exist in the prior art, the present technique scheme proposes a kind of suspension type piping lane scaffold building structure, and concrete technical scheme is following:
A kind of suspension type piping lane scaffold building structure comprises the beam on many cross bars, many vertical poles, many montants, a plurality of fastener and the construction building things; Said cross bar, vertical pole and montant are through the fastener snapping.Also comprise portal, said portal is the rectangle of opening, and the end on the both sides of openend is connected with annulus respectively, two annulus axially identical, and each plane, annulus place is perpendicular to plane, said rectangle place; Said cross bar or vertical pole pass said two annulus, and the portal beam hangs on the beam.
Comprise scaffold floor, scaffold floor is laid on adjacent cross bar and/or the adjacent vertical pole.
Comprise protective guard, protective guard is connected between the bilevel cross bar and/or between the bilevel vertical pole.
Comprise bridging, bridging is connected with cross bar, vertical pole and/or montant through fastener.
Difficult point to the scaffold building existence; This device is selected the full hall of suspension type scaffold; The ground civil engineering work of cross-operation and the security risk of piping lane piping work have been reduced like this; Ground can also and be incubated prefabricated place as pipe prefabrication below piping lane behind the civil engineering end-of-job, has solved the narrow and small problem in place fully.
Description of drawings
Fig. 1 is the sketch map of the utility model specific embodiment.Among the figure, 1-cross bar, 2-vertical pole, 3-montant, 4-fastener, 5-portal, 6-beam.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment present technique scheme is further specified as follows:
A kind of suspension type piping lane scaffold building structure comprises the beam on many cross bars, many vertical poles, many montants, a plurality of fastener and the construction building things; Said cross bar, vertical pole and montant are through the fastener snapping.Also comprise portal, said portal is the rectangle of opening, and the end on the both sides of openend is connected with annulus respectively, two annulus axially identical, and each plane, annulus place is perpendicular to plane, said rectangle place; Said cross bar or vertical pole pass said two annulus, and the portal beam hangs on the beam.
Comprise scaffold floor, scaffold floor is laid on adjacent cross bar and/or the adjacent vertical pole.
Comprise protective guard, protective guard is connected between the bilevel cross bar and/or between the bilevel vertical pole.
Comprise bridging, bridging is connected with cross bar, vertical pole and/or montant through fastener.
Set up at boat scaffold: cancellation is as the scaffolding steel pipe of suspension material; And use the round steel of φ 12mm instead; Making is simple, and is easy to operate, reduced the working time and the labour intensity of scaffolder's work high above the ground; Reduced and set up the process safe risk, saved scaffold building time and expenses.This frock is applicable to the scaffold building of the open type frame construction that the duration is nervous, cross-operation is frequent.
Adopt this structure, the flow process of scaffold building is: the round steel portal is prefabricated → location is provided with → and vertical leger → little cross bar (joist) → bridging → shop scaffold floor → guard rail;
Round steel portal prefabricated: 200 of prefabricated quantity, round steel need be brushed corrosion resistant coating;
Cross bar: 2 scaffolders stand on 2 beams that close on and respectively the round steel portal that arranges are mentioned, and steel pipe is passed in the portal dicyclo, slowly it are put down then; Vertically connect with fastener between the leger;
Vertical pole: after treating that vertical pole connects completion, every separated 1.8m is arranged on the vertical pole with cross bar, and connects with fastener;
Bridging: after treating that vertical leger and little cross bar deploy, arrange horizontal cross brace, connection horizontal, vertical pole; Every group of about at interval 20m of bridging;
Scaffold floor is laid: after treating that above-mentioned work is all accomplished, lay the thick wooden springboard of 50mm;
Guard rail: with steel tube fastener guard rail is set apart from scaffold floor 200mm place in the suspension bracket outside.
Claims (4)
1. suspension type piping lane scaffold building structure comprises the beam on many cross bars, many vertical poles, many montants, a plurality of fastener and the construction building things; Said cross bar, vertical pole and montant are through the fastener snapping; It is characterized in that also comprising portal, said portal is the rectangle of opening, and the end on the both sides of openend is connected with annulus respectively; Two annulus axially identical, each plane, annulus place is perpendicular to plane, said rectangle place; Said cross bar or vertical pole pass said two annulus, and the portal beam hangs on the beam.
2. suspension type piping lane scaffold building structure according to claim 1 is characterized in that comprising scaffold floor, and scaffold floor is laid on adjacent cross bar and/or the adjacent vertical pole.
3. suspension type piping lane scaffold building structure according to claim 1 and 2 is characterized in that comprising protective guard, and protective guard is connected between the bilevel cross bar and/or between the bilevel vertical pole.
4. suspension type piping lane scaffold building structure according to claim 3 is characterized in that comprising bridging, and bridging is connected with cross bar, vertical pole and/or montant through fastener.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204509262U CN202299362U (en) | 2011-11-15 | 2011-11-15 | Erecting structure for suspension type scaffold of pipe rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204509262U CN202299362U (en) | 2011-11-15 | 2011-11-15 | Erecting structure for suspension type scaffold of pipe rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202299362U true CN202299362U (en) | 2012-07-04 |
Family
ID=46368288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204509262U Expired - Lifetime CN202299362U (en) | 2011-11-15 | 2011-11-15 | Erecting structure for suspension type scaffold of pipe rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202299362U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797991A (en) * | 2018-06-27 | 2018-11-13 | 中国化学工程第四建设有限公司 | Suspension type lifting lug scaffold installation method |
CN111706056A (en) * | 2020-06-18 | 2020-09-25 | 上海建工集团股份有限公司 | Construction device for scaffold, scaffold system and construction method thereof |
CN111894253A (en) * | 2020-07-23 | 2020-11-06 | 中国三冶集团有限公司 | Ring type sliding scaffold for corridor and construction method thereof |
-
2011
- 2011-11-15 CN CN2011204509262U patent/CN202299362U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797991A (en) * | 2018-06-27 | 2018-11-13 | 中国化学工程第四建设有限公司 | Suspension type lifting lug scaffold installation method |
CN111706056A (en) * | 2020-06-18 | 2020-09-25 | 上海建工集团股份有限公司 | Construction device for scaffold, scaffold system and construction method thereof |
CN111894253A (en) * | 2020-07-23 | 2020-11-06 | 中国三冶集团有限公司 | Ring type sliding scaffold for corridor and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104153587B (en) | A kind of built with ribbed bricks body of wall assembly construction method | |
CN103711323B (en) | Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing | |
CN103982040B (en) | A kind of construction of super highrise building vertical multi-transportation device | |
CN202324571U (en) | Overhanging type double-row scaffold | |
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN104831812A (en) | Whole assembly-type precast concrete frame structure, structural part production technology and mounting method | |
CN205575408U (en) | Concrete precast component shedder | |
CN203238780U (en) | Prefabricated stirrup cage of beam column core area | |
CN105484502B (en) | A kind of industrial premises steel structural roof purlin and support bar combined installation method | |
CN104790675A (en) | Reinforced concrete block masonry structure assemblage construction method | |
CN101775896B (en) | Rigid suspended scaffold for installing pipeline of steel roof equipment | |
CN108360380A (en) | A kind of bridge pier column construction operation platform and its construction method | |
CN203779015U (en) | Reinforcement cage forming machine | |
CN107165281A (en) | A kind of high-altitude long-span overhung steel platform mould bases construction | |
CN103993666A (en) | Improved supporting system construction method suitable for large overhung outer floating plate roof | |
CN203963265U (en) | Pipeline layout support | |
CN202299362U (en) | Erecting structure for suspension type scaffold of pipe rack | |
CN209293474U (en) | A kind of support device that cantilevered structure falsework is shared with external scaffolding | |
CN201635377U (en) | Rigid suspended type scaffold provided with large-span steel roof equipment pipeline | |
CN203808249U (en) | Column stirrup cage assembly for beam-column joint core region | |
CN105839907A (en) | Suspension type steel platform scaffold foundation and method for mounting same | |
CN109162447A (en) | Steel platform of climbing support device and its application method | |
CN202658867U (en) | Overhanging construction platform | |
CN203977840U (en) | A kind of high-altitude long-span strengthening concrete vestibule braced structures | |
CN110030005A (en) | The light-duty guarantor's circle support system of shield tunnel and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120704 |
|
CX01 | Expiry of patent term |