CN202280463U - Universal lining trolley for tunnel construction - Google Patents

Universal lining trolley for tunnel construction Download PDF

Info

Publication number
CN202280463U
CN202280463U CN 201120400112 CN201120400112U CN202280463U CN 202280463 U CN202280463 U CN 202280463U CN 201120400112 CN201120400112 CN 201120400112 CN 201120400112 U CN201120400112 U CN 201120400112U CN 202280463 U CN202280463 U CN 202280463U
Authority
CN
China
Prior art keywords
door frame
gantry
backform
chord member
die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120400112
Other languages
Chinese (zh)
Inventor
梁超
李彬
李波
杨真
程静敏
何宏盛
帅勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN 201120400112 priority Critical patent/CN202280463U/en
Application granted granted Critical
Publication of CN202280463U publication Critical patent/CN202280463U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a universal lining trolley for tunnel construction. The universal lining trolley is composed of a gantry bracket and a top-die truss, wherein the top-die truss is arranged above the gantry bracket, and the gantry bracket is composed of a gantry beam, two side gantry pillars and an inclined gantry struts supported among the gantry beam and the two side gantry pillars; and a top-die chord member in the top-die truss is supported on the gantry beam by a jacking cylinder. The universal lining trolley for tunnel construction is characterized in that the top-die chord member and the gantry beam are in segmented arrangement at the center and are connected by bolts at the segmented positions; and widened top-die chord members and widened gantry beams which are connected by bolts and can be detached are respectively arranged at the segmented positions of the top-die chord member and the gantry beam. According to the utility model, lining trolleys with different widths can be set according to the requirements of tunnel construction, thereby improving the utilization rate of the lining trolley, saving materials, and reducing the cost of tunnel construction.

Description

The universal lining trolley of constructing tunnel
Technical field
The utility model relates to a kind of constructing tunnel equipment, a kind of applicable two lining construction lining trolleys in the different section tunnel of more specifically saying so.
Background technology
Along with expanding economy, the railway in the infrastructure, the construction of highway tunnel constantly increase, and in the practice of construction, because the Tunnel Design section has nothing in common with each other, cause the two lining chassis utilization rates of using in the work progress low.
Two lining chassis are nonstandard products indispensable in the tunnel double-lining work progress, are used for the concrete lining construction to the tunnel inwall.Because form surfacing adopts the monoblock steel plate cold bending assembled; So concrete surface smooth after the tunnel double-lining demoulding, splicing seams is little, and outward appearance is beautiful attractive in appearance; Reduce the labour intensity of mounting template simultaneously in the work progress greatly, so two lining chassis become the special equipment of tunnel double-lining construction.Because two lining chassis belows need be open to traffic, so the door frame crossbeam generally is not less than 5.5m.
At present, two lining chassis in the tunnel double-lining construction adopt prefabrication more, and this chassis is narrow application range in actual use, can not satisfy multibreak constructing tunnel; Cause stock utilization low thus, the waste resource, cost is high.
The utility model content
The utility model is for avoiding above-mentioned existing in prior technology not enough, provide a kind of constructing tunnel universal lining trolley, expending to satisfy various road and rail constructing tunnels, saving material and minimizing.
The utility model adopts following technical scheme for the technical solution problem:
The universal lining trolley of the utility model constructing tunnel is to be made up of door shaped stent and the backform truss that is positioned at door shaped stent top, said door shaped stent be by door frame beam, both sides door frame post and be supported on the door frame beam and both sides door frame post between the door frame diagonal brace constitute; Backform chord member in the backform truss is bearing on the said door frame beam by jacking cylinder; Its design feature is that said backform chord member and door frame beam are in the central segments setting, and on the position of segmentation, connects with bolt; Setting can be respectively be connected with bolt on the segmentation position of backform chord member and door frame beam and removablely widens the backform chord member and widen the door frame beam.
The design feature of the universal lining trolley of the utility model constructing tunnel also is between said both sides door frame post and door frame beam, the reinforcement diagonal brace to be set.
Compared with present technology, the utility model beneficial effect is embodied in:
1, the utility model is applied widely, can satisfy the constructing tunnel of multiple different section width, and economic results in society are remarkable;
2, the utility model steel structure material is reusable, has reduced spillage of material, reduces cost;
3, the utility model can be simplified manufacturing process, reduces the constructing tunnel cost.
Description of drawings
Fig. 1 is the utility model light section chassis front schematic view;
Fig. 2 is the big section chassis of a utility model front schematic view;
Fig. 3 is the utility model chassis side schematic view.
Label among the figure: 1 door frame beam; 2 door frame diagonal braces; 3 door frame posts; 4 prepared screw-bolt holes; 5 backform chord members; 6 widen the door frame beam; 7 widen the backform chord member; 8 strengthen diagonal brace.
The specific embodiment
Referring to Fig. 1, Fig. 2 and Fig. 3, identical with prior art is that universal lining trolley is to be made up of door shaped stent and the backform truss that is positioned at the door shaped stent top equally in the present embodiment.Wherein, door shaped stent be by door frame beam 1, both sides door frame post 3 and be supported on door frame beam 1 and both sides door frame post 3 between door frame diagonal brace 2 constitute; Backform chord member 5 in the backform truss is bearing on the door frame beam 1 by jacking cylinder.
Shown in the figure, with backform chord member 5 and door frame beam 1 segmentation setting on middle position, and on the position of its segmentation, connect and compose overall structure in the present embodiment with bolt; In order to adjust the width of chassis, setting can be respectively be connected with bolt on the segmentation position of backform chord member 5 and door frame beam 1 and removablely widens backform chord member 7 and widen door frame beam 6.
For guaranteed strength, can between both sides door frame post 3 and door frame beam 1, increase to be provided with and strengthen diagonal brace 8, strengthen diagonal brace 8 and be bolt hole 4 through reservation on door frame post 3 and the door frame beam 1 and carry out bolt and be connected, with easy disassembly.
In the practical implementation; Lining trolley is in the tunnel during big section; In the centre of door frame beam 1 and backform chord member 5 according to tunnel cross-section width setting widening door frame beam 6 with widen backform chord member 7; Between door frame beam 1 and door frame post 3, increase simultaneously and strengthen diagonal brace 8, to increase the rigidity (as shown in Figure 2) of lining trolley; When the narrow-bore tunnel, remove and to widen door frame beam 6 and to widen backform chord member 7, also remove simultaneously and strengthen diagonal brace 8, increase the space (as shown in Figure 1) that is open to traffic, chassis below with this.

Claims (2)

1. universal lining trolley of constructing tunnel; Constitute by door shaped stent and the backform truss that is positioned at door shaped stent top, said door shaped stent be by door frame beam (1), both sides door frame posts (3) and be supported on door frame beam (1) with both sides door frame posts (3) between door frame diagonal brace (2) formation; Backform chord member (5) in the backform truss is bearing on the said door frame beam (1) by jacking cylinder; It is characterized in that said backform chord member (5) and door frame beam (1) are in the central segments setting, and on the position of segmentation, connect with bolt; Setting can be respectively be connected with bolt on the segmentation position of backform chord member (5) and door frame beam (1) and removablely widens backform chord member (7) and widen door frame beam (6).
2. the universal lining trolley of constructing tunnel according to claim 1 is characterized in that between said both sides door frame posts (3) and door frame beam (1), being provided with reinforcement diagonal brace (8).
CN 201120400112 2011-10-19 2011-10-19 Universal lining trolley for tunnel construction Expired - Fee Related CN202280463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120400112 CN202280463U (en) 2011-10-19 2011-10-19 Universal lining trolley for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120400112 CN202280463U (en) 2011-10-19 2011-10-19 Universal lining trolley for tunnel construction

Publications (1)

Publication Number Publication Date
CN202280463U true CN202280463U (en) 2012-06-20

Family

ID=46226636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120400112 Expired - Fee Related CN202280463U (en) 2011-10-19 2011-10-19 Universal lining trolley for tunnel construction

Country Status (1)

Country Link
CN (1) CN202280463U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777191A (en) * 2012-08-10 2012-11-14 中国建筑第四工程局有限公司 Strengthening girder trolley
CN104088650A (en) * 2014-07-14 2014-10-08 中铁二局股份有限公司 Overall self-propelled hydraulic lining trolley and refitting method thereof
CN106437765A (en) * 2016-10-17 2017-02-22 中铁五局集团第五工程有限责任公司 Long-span variable section tunnel secondary lining trolley and construction method thereof
CN107448218A (en) * 2017-09-26 2017-12-08 中铁十七局集团第工程有限公司 A kind of single-track tunnel lining trolley constructing device
CN109882197A (en) * 2017-12-06 2019-06-14 徐州迈斯特机械科技有限公司 A kind of seperated moving die plate trolley structure of Tunnel Engineering
CN110056368A (en) * 2019-04-11 2019-07-26 中铁三局集团有限公司 A kind of two-way device and construction method of being open to traffic for single-track tunnel
CN110513126A (en) * 2019-09-27 2019-11-29 中铁四局集团有限公司 Recyclable tunnel secondary lining trolley with variable cross section

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777191A (en) * 2012-08-10 2012-11-14 中国建筑第四工程局有限公司 Strengthening girder trolley
CN102777191B (en) * 2012-08-10 2015-08-19 中国建筑第四工程局有限公司 Bracnig frame chassis
CN104088650A (en) * 2014-07-14 2014-10-08 中铁二局股份有限公司 Overall self-propelled hydraulic lining trolley and refitting method thereof
CN106437765A (en) * 2016-10-17 2017-02-22 中铁五局集团第五工程有限责任公司 Long-span variable section tunnel secondary lining trolley and construction method thereof
CN107448218A (en) * 2017-09-26 2017-12-08 中铁十七局集团第工程有限公司 A kind of single-track tunnel lining trolley constructing device
CN109882197A (en) * 2017-12-06 2019-06-14 徐州迈斯特机械科技有限公司 A kind of seperated moving die plate trolley structure of Tunnel Engineering
CN110056368A (en) * 2019-04-11 2019-07-26 中铁三局集团有限公司 A kind of two-way device and construction method of being open to traffic for single-track tunnel
CN110513126A (en) * 2019-09-27 2019-11-29 中铁四局集团有限公司 Recyclable tunnel secondary lining trolley with variable cross section
CN110513126B (en) * 2019-09-27 2020-11-13 中铁四局集团有限公司 Recyclable tunnel secondary lining trolley with variable cross section

Similar Documents

Publication Publication Date Title
CN202280463U (en) Universal lining trolley for tunnel construction
CN202578714U (en) Universal steel die lining trolley for linear and curved section tunnel
CN102650211A (en) Universal type steel mould lining trolley for linear and curved sectional tunnel
CN207315404U (en) Municipal tunnel big cross section culvert and piping lane trolley
CN102322028A (en) Semi-automatic arch culvert construction template
CN202658533U (en) Movable formwork of curved bridge with variable width
CN201496073U (en) Portal type hydraulic steel mould trolley
CN102660925A (en) Moveable formwork for variable-width curved bridge
CN205223873U (en) Reinforced structure of lateral ties between reinforcing T beam bridge girder
CN206801592U (en) Hydraulic lining trolley for cut-and-cover tunnel concreting
CN201835518U (en) Seamless combination formwork
CN109317911A (en) A kind of cross column welding production line
CN201826857U (en) Tunnel liner trolley
CN106640131B (en) A kind of modular variable cross-section tunnel lining trolley
CN207259883U (en) A kind of suspension type monorail traffic steel reinforced concrete combined track beam based on assembled technology
CN208203298U (en) A kind of big punching block of rail type side wall
CN105464000A (en) Cast-in-place box beam moving formwork
CN202208892U (en) Semi-automatic arched culvert construction template
CN206956534U (en) A kind of railway and track traffic suspended beam type Frame Pier
CN214530206U (en) Portable moving die carrier bridging machine
CN210031563U (en) Quick construction equipment of mobilizable modularization box culvert
CN201614939U (en) Three-dimensional space curved surface steel mould trolley
CN209081269U (en) Assembling truss hanging apparatus
CN202707076U (en) Double-line railway tunnel trolley
CN201459609U (en) Oblique crossing box beam bridge girder erection machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120620

Termination date: 20171019

CF01 Termination of patent right due to non-payment of annual fee