CN202252366U - Multilayer bridge frame support arm installation mold - Google Patents

Multilayer bridge frame support arm installation mold Download PDF

Info

Publication number
CN202252366U
CN202252366U CN2011203736447U CN201120373644U CN202252366U CN 202252366 U CN202252366 U CN 202252366U CN 2011203736447 U CN2011203736447 U CN 2011203736447U CN 201120373644 U CN201120373644 U CN 201120373644U CN 202252366 U CN202252366 U CN 202252366U
Authority
CN
China
Prior art keywords
mold
round steel
support arm
trailing arm
construction cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203736447U
Other languages
Chinese (zh)
Inventor
刘维峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN2011203736447U priority Critical patent/CN202252366U/en
Application granted granted Critical
Publication of CN202252366U publication Critical patent/CN202252366U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a mold, in particular to a multilayer bridge frame support arm installation mold, which comprises a hanging frame and support arms, wherein the hanging frame comprises two round steel hooks in horizontal arrangement, the top ends of the round steel hooks are in a reverse U shape, and the support arms are welded on the hanging frame at intervals. The mold is convenient to process and manufacture, so the work efficiency is greatly improved, and the construction cost is reduced. The mold has a use method that only the top layer of the support arm of a multilayer bridge frame needs to be leveled, all layers under the top layer can be conveniently installed through the mold, and the complicated work procedures of level instrument dotting, line hanging and levelling instrument levelling are omitted, so the construction schedule is accelerated, and the construction cost is reduced. When the mold is popularized, good effects can be realized in the following aspects of reducing the construction cost, shortening the work period, improving the construction quality, and the like.

Description

Multilayer crane span structure trailing arm installation mold
Technical field
The utility model relates to a kind of mould, especially a kind of multilayer crane span structure trailing arm installation mold.
Background technique
The metallurgy industry scale increases day by day in recent years; In the cable through especially in places such as cable tunnel, cable interlayers; The design of multilayer crane span structure is increasing; So in cable testing bridge construction, how to guarantee the construction speed and the quality of cable testing bridge, the overall progress and the quality of electric installation played crucial effects.
Summary of the invention
The technical problem that the utility model will solve is: provide a kind of simple and reasonable, be convenient to install, need not to get ready, the multilayer crane span structure trailing arm installation mold of operation such as levelling.
The technological scheme that solves its technical problem employing is:
A kind of multilayer crane span structure trailing arm installation mold comprises: hanger, trailing arm, said hanger comprise two round steel hooks that are horizontal arrangement, and the top of this round steel hook is handstand U-shaped shape, are welded with trailing arm on this hanger at interval.
The beneficial effect of the utility model: this kind mould is convenient to processing and fabricating, thereby improves work efficiency greatly, reduces construction cost; This mould method for using only needs the last layer of levelling multilayer crane span structure trailing arm, below each layer mould capable of using install easily, saved that level instrument is got ready, hanging wire and these complicated operations of spirit level levelling, thereby accelerating construction progress reduces construction cost.This kind mould if can be promoted, and can obtain effect preferably at aspects such as reducing this construction cost, quickening duration and raising construction quality.
Description of drawings
Fig. 1 is the utility model master TV structure schematic representation.
Among the figure: hanger 1, trailing arm 2.
Embodiment
Below in conjunction with accompanying drawing and embodiment model utility is described further:
Referring to accompanying drawing 1, a kind of multilayer crane span structure trailing arm installation mold comprises: hanger 1, trailing arm 2, said hanger 1 comprise two round steel hooks that are horizontal arrangement, and the top of this round steel hook is handstand U-shaped shape, are welded with trailing arm 2 on this hanger 1 at interval.
As a kind of preferred version of the utility model, said round steel is linked up with at least two of numbers, can add arbitrarily according to requirement of engineering like this to subtract.
The working principle of the utility model is summarized as follows:
The hanger 1 of this mould utilizes two φ 10 round steel to process, and U-shaped level hook is simmered in the upper end portion, with so that this die horizontal hang on the last layer trailing arm 2 of multilayer crane span structure; The trailing arm 2 of this mould adopts the 30*4 angle steel to make, and the number of plies confirms that according to the crane span structure number of plies its length is confirmed according to trailing arm 2 length, and is generally slightly short than trailing arm 2 length.This angle steel is supported with being welded in behind the level leveling on the round steel hanger 1, and spacing is confirmed according to the crane span structure interlamellar spacing.

Claims (2)

1. multilayer crane span structure trailing arm installation mold comprises: hanger, trailing arm, it is characterized in that said hanger comprises two round steel hooks that are horizontal arrangement, and the top of this round steel hook is handstand U-shaped shape, is welded with trailing arm on this hanger at interval.
2. multilayer crane span structure trailing arm installation mold according to claim 1 is characterized in that at least two of said round steel hook numbers.
CN2011203736447U 2011-09-30 2011-09-30 Multilayer bridge frame support arm installation mold Expired - Fee Related CN202252366U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203736447U CN202252366U (en) 2011-09-30 2011-09-30 Multilayer bridge frame support arm installation mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203736447U CN202252366U (en) 2011-09-30 2011-09-30 Multilayer bridge frame support arm installation mold

Publications (1)

Publication Number Publication Date
CN202252366U true CN202252366U (en) 2012-05-30

Family

ID=46113608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203736447U Expired - Fee Related CN202252366U (en) 2011-09-30 2011-09-30 Multilayer bridge frame support arm installation mold

Country Status (1)

Country Link
CN (1) CN202252366U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105202265A (en) * 2015-08-28 2015-12-30 中国一冶集团有限公司 Multilayer bridge framework bracket arm mounting locating device and method
CN109494647A (en) * 2018-12-17 2019-03-19 陕西化建工程有限责任公司 A kind of cable bridge bracket Rapid installing mould and its production/application method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105202265A (en) * 2015-08-28 2015-12-30 中国一冶集团有限公司 Multilayer bridge framework bracket arm mounting locating device and method
CN109494647A (en) * 2018-12-17 2019-03-19 陕西化建工程有限责任公司 A kind of cable bridge bracket Rapid installing mould and its production/application method
CN109494647B (en) * 2018-12-17 2024-01-23 陕西化建工程有限责任公司 Quick installation die for cable bridge bracket and manufacturing/using method thereof

Similar Documents

Publication Publication Date Title
CN202252366U (en) Multilayer bridge frame support arm installation mold
CN203690795U (en) Carriage used for overhaul of insulator chain
CN202910099U (en) Fixing device of wire-drawing die box for bar reinforcement
CN201596693U (en) Gate screw straightening device
CN202124420U (en) Porcelain bushing blank hoisting device
CN205444692U (en) Dendroid steel pipe concrete beam forming post
CN104495534A (en) Pipe core skid resistance anchoring device for vertical wire wrapping machine for prestressed concrete cylinder pipe
CN202611077U (en) Light steel keel boom back supporting member
CN205104193U (en) Propaganda banner suspension support frame
CN203624768U (en) Construction hoist capable of carrying climbing formwork
CN202039632U (en) Straight line angle tower for ultrahigh voltage direct current circuit 720/50 lead
CN202070613U (en) Aligning system for derusting machine
CN205768767U (en) A kind of bracket type Messenger Wire base
CN203879367U (en) Tower ladder structure for electric transmission line
CN204729763U (en) Deposit the hook support of cable
CN201927936U (en) Bracket for lifting wire
CN203097758U (en) Oil rod layer board of oil pipe lifting device
CN209860499U (en) Be applied to cable support device that is connected with pre-buried spout in subway tunnel
CN202706328U (en) Cantilever support mechanism for building concrete structure
CN204918730U (en) Material compression rod that looses is prevented to zinc pot
CN202186849U (en) Concrete static cut hoisting mechanism
CN203781636U (en) Hoisting device for stove shell of hot blast stove
CN202358825U (en) Hoisting device for zinc-plated sink roller
CN202408375U (en) Wall-hung type embedded part
CN202080763U (en) Power cable returning and collecting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20140930

EXPY Termination of patent right or utility model