CN202238332U - Flotation assembly - Google Patents

Flotation assembly Download PDF

Info

Publication number
CN202238332U
CN202238332U CN2011203757617U CN201120375761U CN202238332U CN 202238332 U CN202238332 U CN 202238332U CN 2011203757617 U CN2011203757617 U CN 2011203757617U CN 201120375761 U CN201120375761 U CN 201120375761U CN 202238332 U CN202238332 U CN 202238332U
Authority
CN
China
Prior art keywords
flotation
sleeve
machines
flotation device
communicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203757617U
Other languages
Chinese (zh)
Inventor
荆正强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CINF Engineering Corp Ltd
Original Assignee
CINF Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CINF Engineering Corp Ltd filed Critical CINF Engineering Corp Ltd
Priority to CN2011203757617U priority Critical patent/CN202238332U/en
Application granted granted Critical
Publication of CN202238332U publication Critical patent/CN202238332U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Paper (AREA)

Abstract

The utility model discloses a flotation assembly, which belongs to the field of ore dressing equipment and aims to overcome the shortcoming that the flotation machine in the prior art has low flotation recovery rate. The flotation assembly comprises flotation machines, a stirring device arranged inside each flotation machine, a false bottom arranged at the bottom of the interior of each flotation machine, and a sleeve arranged at the bottom of each flotation machine and communicated with the false bottom; the stirring device is positioned above the sleeve; the flotation assembly comprises at least two floatation machines, the lower parts of the two adjacent flotation machines are communicated through a tailings tube, the sleeve of one of the two adjacent flotation machines is communicated with the upper part of the other flotation machine through a return tube. The flotation assembly disclosed by the utility model effectively increases the contact time and change between ore slurry and bubbles in the flotation machines, remarkably increases the recovery rate of useful minerals, and increases the economic benefit of a mine.

Description

A kind of flotation unit
Technical field
The utility model relates to the preparation equipment field, is specially a kind of flotation unit.
Background technology
At present, China mine is along with suitable ore dressing stone reduces, and the exploitation refractory ore has become inevitable, and the ore-dressing technique of these ores often all needs mog very thin, and selected operation also increases to some extent.Because after mog attenuates; Adopt the collision probability of adhering to of present flotation device valuable mineral particle and bubble to diminish; Perhaps remedy thereby have influence on flotation recovery rate, cause equipment investment to increase the also corresponding increase of operating cost like this through the quantity that increases scavenging flotation machine.
Summary of the invention
In order to overcome the not high deficiency of existing flotation device flotation recovery rate; The utility model aims to provide a kind of flotation unit; This unit adopts scalable to reflux and designs the time of contact and the probability that can effectively prolong interior ore pulp of flotation device and bubble; Can significantly improve the rate of recovery of valuable mineral, improve mine economic profit.
To achieve these goals, the technical scheme that the utility model adopted is: said flotation unit comprises flotation device, is located at the agitating device in the flotation device, is located at the false end of flotation device inner bottom part, the sleeve that is located at the interior bottom of flotation device and is communicated with the said false end; Said agitating device is positioned at this sleeve top; Its design feature is, said flotation unit comprises at least two flotation devices, and adjacent two flotation device bottoms are connected through debris tube, and the sleeve of a flotation device in said adjacent two flotation devices is connected through return duct with the top of another flotation device.
In order to control return flow; Regulate the backflow pulp levels, be provided with adjustable pipe in the said return duct, as entering the mouth when needing the fine-graded ore pulp of backflow can increase adjustable pipe; Adopt screwed connection between adjustable pipe, the coarsely graded ore pulp that needs to reflux can reduce the adjustable pipe inlet.
For the real-time regulated return flow, thereby regulate the backflow pulp levels, be provided with control valve in the said return duct, this control valve is preferably the taper control valve.
In order in whipping process, to form negative pressure better, mineral aggregate is sucked in the sleeve, the distance between the bottom of said agitating device and the sleeve top is preferably 1cm ~ 2cm.
Above-mentioned flotation unit preferably is made up of two flotation devices.
By said structure; After previous flotation device was opened, agitating device began rotation, in sleeve, forms negative pressure; Air also gets in the sleeve under the suction function in external atmosphere pressure and sleeve; Ore pulp gets into first flotation device through the false end sleeve with carry out flotation operation after air mixes, the part valuable mineral is along with bubble floating goes out flotation device, and part valuable mineral owing to well do not mix with bubble passes through next step operation of flotation device entering after the debris tube entering; In order to cross this part mineral is also reclaimed in last flotation device, the return duct that the design of one flotation device is communicated with last flotation device in the back.The ore pulp that back one flotation device includes the part valuable mineral is back at the false end of last flotation device along return duct; And with sleeve in air mix once more and carry out flotation operation; Thereby the time of contact and the probability of ore pulp and air have been improved; Improve the operation recovery of last flotation device, alleviated the burden of subsequent job simultaneously.
Compared with prior art; The beneficial effect of the utility model is: the present invention utilizes the flotation device agitating device to stir the negative pressure that produces, and is connected with sleeve through return duct, and the operation flotation tailing is refluxed; Improved the time of contact of ore pulp and this operation bubble; Thereby improved flotation efficiency significantly, reduced the flotation cost, improved mine economic profit.
Below be that a flotation unit combines accompanying drawing and embodiment that the utility model is done further to set forth with regard to two flotation devices.
Description of drawings
Fig. 1 is the structure principle chart of a kind of embodiment of the utility model.
In the drawings
1, the 10-flotation device; The 2-agitating device; The 3-sleeve; The 4-return duct;
The 5-adjustable pipe; The 6-control valve; The 7-debris tube; The false end of 8-.
The specific embodiment
A kind of flotation unit, as shown in Figure 1, comprise two flotation devices 1,10, in each flotation device 1,10, be equipped with agitating device 2, each flotation device 1,10 inner bottom part is equipped with the false end 8, and the bottom in each flotation device 1,10 is provided with the sleeve 3 that is communicated with the said false end 8; Said agitating device 2 is positioned at this sleeve 3 tops, and the distance between the bottom of this agitating device 2 and sleeve 3 tops is 1cm; Two flotation device 1,10 bottoms are connected through debris tube 7, and the sleeve 3 of a flotation device 1 in said two flotation devices 1 is connected through return duct 4 with the top of another flotation device 10, are provided with adjustable pipe 5 and control valve 6 in the said return duct 4.
Describe for ease, the last flotation device that the present invention defines in two flotation devices 1,10 is the 1# flotation device, and back one flotation device is the 2# flotation device.
After the 1# flotation device is opened; Agitating device begins rotation; In sleeve, form negative pressure, air also gets under the suction function in external atmosphere pressure and sleeve in the sleeve, and 1# flotation device ore pulp carries out flotation operation after getting into sleeve and air mixes through the false end; The part valuable mineral is along with bubble floating goes out flotation device, and the part valuable mineral gets into next operation owing to well do not mix with bubble through debris tube entering 2# flotation device; In order to cross this part mineral is also reclaimed in the 1# flotation device, at 2# flotation device design return duct; The ore pulp that the 2# flotation device includes the part valuable mineral is back to the 1# tank diameter along return duct under the action of negative pressure in 1# flotation device sleeve; And with sleeve in air mix once more and carry out flotation operation; Thereby the time of contact and the probability of ore pulp and air have been improved; Improve the operation recovery of 1# flotation device, alleviated the burden of subsequent job simultaneously.
Present embodiment adopts scalable to reflux and designs the time of contact and the probability that can effectively prolong interior ore pulp of flotation device and bubble, significantly improved the rate of recovery of valuable mineral, has improved mine economic profit.
The content that the foregoing description is illustrated is to be understood that to these embodiment and only is used to be illustrated more clearly in the utility model; And be not used in the restriction the utility model scope; After having read the utility model, those skilled in the art all fall within the application's accompanying claims institute restricted portion to the modification of the various equivalent form of values of the utility model.

Claims (6)

1. a flotation unit comprises flotation device (1), is located at the agitating device (2) in the flotation device (1), is located at the false end (8) of flotation device (1) inner bottom part, the sleeve (3) that is located at the interior bottom of flotation device (1) and is communicated with the said false end (8); Said agitating device (2) is positioned at this sleeve (3) top; It is characterized in that; Said flotation unit comprises at least two flotation devices; Adjacent two flotation devices (1; 10) bottom is connected through debris tube (7), and the sleeve (3) of the flotation device (1) in said adjacent two flotation devices (1,10) is connected through return duct (4) with the top of another flotation device (10).
2. flotation unit according to claim 1 is characterized in that, is provided with adjustable pipe (5) in the said return duct (4).
3. flotation unit according to claim 1 is characterized in that, is provided with control valve (6) in the said return duct (4).
4. flotation unit according to claim 3 is characterized in that, said control valve (6) is a taper control valve (6).
5. flotation unit according to claim 1 is characterized in that, the distance between the bottom of said agitating device (2) and sleeve (3) top is 1cm ~ 2cm.
6. according to the described flotation unit of one of claim 1 ~ 4, it is characterized in that said flotation unit is made up of two flotation devices (1,10).
CN2011203757617U 2011-09-28 2011-09-28 Flotation assembly Expired - Fee Related CN202238332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203757617U CN202238332U (en) 2011-09-28 2011-09-28 Flotation assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203757617U CN202238332U (en) 2011-09-28 2011-09-28 Flotation assembly

Publications (1)

Publication Number Publication Date
CN202238332U true CN202238332U (en) 2012-05-30

Family

ID=46099637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203757617U Expired - Fee Related CN202238332U (en) 2011-09-28 2011-09-28 Flotation assembly

Country Status (1)

Country Link
CN (1) CN202238332U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105251623A (en) * 2015-11-23 2016-01-20 四川安宁铁钛股份有限公司 Middling ore box of flotation machine
CN105498941A (en) * 2016-01-05 2016-04-20 天津美腾科技有限公司 Combined TCS intelligent coarse slime sorting machine
CN106457262A (en) * 2014-05-15 2017-02-22 Fl史密斯公司 Valve apparatus for flotation cells
CN107051752A (en) * 2017-06-15 2017-08-18 西南科技大学 Flotation device
CN107138290A (en) * 2017-06-27 2017-09-08 北矿机电科技有限责任公司 Flotation device bottom ore pulp orientation dual-cycle plant

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106457262A (en) * 2014-05-15 2017-02-22 Fl史密斯公司 Valve apparatus for flotation cells
CN106457262B (en) * 2014-05-15 2019-05-28 Fl史密斯公司 Valve gear for flotation cell
CN105251623A (en) * 2015-11-23 2016-01-20 四川安宁铁钛股份有限公司 Middling ore box of flotation machine
CN105498941A (en) * 2016-01-05 2016-04-20 天津美腾科技有限公司 Combined TCS intelligent coarse slime sorting machine
CN107051752A (en) * 2017-06-15 2017-08-18 西南科技大学 Flotation device
CN107051752B (en) * 2017-06-15 2019-02-19 西南科技大学 Flotation device
CN107138290A (en) * 2017-06-27 2017-09-08 北矿机电科技有限责任公司 Flotation device bottom ore pulp orientation dual-cycle plant

Similar Documents

Publication Publication Date Title
CN202238332U (en) Flotation assembly
CN101844113B (en) Flotation machine for efficiently recovering fine-particle minerals
CN207521171U (en) Jet stream micro-bubble flotation machine
CN103480502B (en) Three-product cyclone microbubble floatation column screening installation and method
CN206701482U (en) A kind of new elutriation magnetic separator
CN103480503B (en) Settling cyclonic micro-bubble flotation column separation unit and method
CN105880032B (en) A kind of mid-low grade collophanite ore floats combined sorting method again
CN203899729U (en) Pulsating-flow teetered bed separator suitable for separation of coarse coal slime in wide granularity grade
CN204122256U (en) A kind of fluorite ore sorting unit
CN202845173U (en) Short floatation column used for gold selection and identification
CN206996817U (en) Grinding attachment
CN202199415U (en) Pretreatment device for rare earth processing flotation and magnetic separation
CN201052478Y (en) Bauxite pole type short flow path separation equipment
CN207204390U (en) A kind of ore floatation device
CN104624392A (en) Single-groove inflation stirring type flotation machine
CN201644236U (en) High-efficiency self-circulation flotation cell
CN113477412B (en) High-efficiency energy-saving middling negative pressure circulation jet flow micro-bubble flotation column
Lin et al. Experimental research on anionic reverse flotation of hematite with a flotation column
CN107511254A (en) Carry essence drop slag magnetic separator distribution device
CN207222160U (en) Qu Pao mechanisms on jet stream micro-bubble flotation machine
CN112221692A (en) Low-grade fine-grained embedded mineral enrichment and separation device
CN206276494U (en) A kind of hydraulic classiciation case with hydraulic cyclone
CN205392721U (en) Strong desliming sieve moves tailing flotation chute
CN205761475U (en) A kind of grinder slurry blood circulation
CN106824554B (en) Flotation machine for flotation of coarse fraction materials

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120530

Termination date: 20190928

CF01 Termination of patent right due to non-payment of annual fee