CN202219536U - Die holder for assembling steel reinforcement cage of prefabricated box girder - Google Patents

Die holder for assembling steel reinforcement cage of prefabricated box girder Download PDF

Info

Publication number
CN202219536U
CN202219536U CN 201120299433 CN201120299433U CN202219536U CN 202219536 U CN202219536 U CN 202219536U CN 201120299433 CN201120299433 CN 201120299433 CN 201120299433 U CN201120299433 U CN 201120299433U CN 202219536 U CN202219536 U CN 202219536U
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
die holder
transverse
cant beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120299433
Other languages
Chinese (zh)
Inventor
王晨光
张俊艇
王超
王广松
梁乐文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CN 201120299433 priority Critical patent/CN202219536U/en
Application granted granted Critical
Publication of CN202219536U publication Critical patent/CN202219536U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a die holder for assembling the steel reinforcement cage of a prefabricated box girder, which comprises two longitudinal bases. A plurality of transverse bases are fixedly arranged on the longitudinal bases. The two sides of each transverse base are respectively and symmetrically provided with an outwards inclined cant beam. Each cant beam is vertically provided with a plurality of transverse bushings. A steel pipe capable of sliding along the bushing is arranged in each transverse bushing. Each transverse base is longitudinally provided with at least two bottom beams and each cant beam is provided with a central beam. The upper ends of the bottom beams and the central beams are provided with a plurality of notches. According to the utility model, the colligation and combination of a steel reinforcement cage realized through the die holder is simple and convenient in operation and is integrally unified so as to be consistent with the same standard. The die holder can be installed on the ground, so that the construction can be performed on the ground. Compared with a precast beam pedestal, the die holder is capacious in working environment and higher in safety performance. After being well assembled well, the steel reinforcement cage is hoisted to a beam pedestal through one shot. Therefore, the transportation cost is reduced.

Description

Prefabricated case beam steel reinforcement cage assembling mould bases
Technical field
The utility model relates to a kind of instrument of fixed buildings reinforcement foundation cage assembling, exactly is a kind of prefabricated case beam steel reinforcement cage assembling mould bases.
Background technology
The case beam is a kind of boring shape in the science of bridge building, a kind of beam that there are the wing, similar chest in the portion both sides.Prefabricated case beam is the case beam that can combine the bridge formation machine after the bottom engineering is accomplished, to set up in independent place.The skeleton structure of prefabricated case beam is a steel reinforcement cage, and the assembling of steel reinforcement cage is the committed step that whole engineering case beam is made.The assembling process of steel reinforcement cage generally speaking is processing and fabricating on the precast beam pedestal usually; And there is not standard die set; Carry out next procedure after steel reinforcement cage processes again, but there is following shortcoming in this operation: 1, do not have the mould bases of fixed standard, steel reinforcement cage colligation and anabolic process are comparatively complicated; And the steel reinforcement cage of making is uneven on the whole, and the steel reinforcement cage quality of making is low; 2, precast beam pedestal space is less, and is higher apart from ground, and workmen's working environment is dangerous; 3, the steel reinforcement cage material need lift and be transported on the precast beam pedestal, and the time that the process of transportation occupies is longer.
The utility model content
The purpose of the utility model provides a kind of prefabricated case beam steel reinforcement cage assembling mould bases, get final product so that installation process is simple to operation, and the each several part steel reinforcement cage is uniform, all meets same standard; Need not simultaneously can accomplish the assembling of steel reinforcement cage in spacious zones such as ground in the operation of precast beam pedestal; Only needing once lifting transportation to put in place after only carrying out gets final product.
The utility model is for realizing above-mentioned purpose; Realize through following technical scheme: comprise two vertical bases; Vertically fixedly mount several transverse base on the base; Each transverse base both sides is the cant beam of a flare of symmetry installation respectively, vertical several horizontal sleeve pipes of installing on the every cant beam, and installing one in each horizontal sleeve pipe can be along the steel pipe of sleeve pipe slip; At least two foundation beams vertically are installed on the transverse base, a central sill is installed on the every cant beam; Several notches are offered in bottom girder and central sill upper end.
In order further to realize the purpose of the utility model, can also adopt following technical scheme: between cant beam and the transverse base vertical beam is installed.
The advantage of the utility model is: not only simple to operation through mould bases colligation and combined reinforced bar cage, and also whole unified, meet same standard.Mould bases can be installed on the ground, promptly can construct on ground, and compares at the precast beam pedestal, and working environment is broad, can improve safety.Steel reinforcement cage once lifts to the beam pedestal after accomplishing, and can reduce cost of transportation.The utility model also has compactness simple for structure, advantage cheap for manufacturing cost and easy to use.
Description of drawings
Fig. 1 is the structural representation of the utility model; Fig. 2 is that Figure 1A is to the TV structure sketch map.
Reference numeral: 1 vertical beam, 2 cant beams, 3 horizontal sleeve pipe 4 steel pipes 5 central sills 6 bottom girders 7 transverse base 8 vertical base 9 notches.
The specific embodiment
The described prefabricated case beam steel reinforcement cage assembling of the utility model mould bases; As depicted in figs. 1 and 2; Comprise two vertical bases 8, vertically fixedly mount several transverse base 7 on the base 8, the cant beam 2 of a flare is installed in each transverse base 7 both sides symmetry respectively; Vertical several horizontal sleeve pipes 3 of installing on the every cant beam 2, installing one in each horizontal sleeve pipe 3 can be along the steel pipe 4 of sleeve pipe 3 slips; At least two foundation beams 6 vertically are installed on the transverse base 7, a central sill 5 is installed on the every cant beam 2; Bottom girder 6 is offered several notches 9 with central sill 5 upper ends.During use; On each steel pipe 4 that sets up a logical height, horizontal main muscle sets up on the notch 9 of bottom girder 6, central sill 5 with the main flaccidity of tendon and muscle of steel reinforcement cage, each reinforcement is set up on main muscle longitudinally again; The intersection point of main muscle and reinforcement is gone out welding, steel reinforcement cage assembled.Extract steel pipe 4 then out, steel reinforcement cage separates with mould bases, adopts hanging device that reinforcing bar cage hoisting to beam pedestal is got final product.Owing to adopted mould bases to assemble, convenient and quick construction not only, and its whole steel reinforcement cage is uniform, meets same standard.This mould bases can be placed in the spacious environment, compares with the construction on the beam pedestal, and working environment is on broader ground, and is more safe than the work high above the ground.Compare with each traditional steel reinforcement cage part lifting, only need disposable reinforcing bar cage hoisting to put in place and get final product moulding.
In order to increase the bearing strength of the utility model, as shown in Figure 1, vertical beam 1 is installed between cant beam 2 and the transverse base 7.The tree beam supports cant beam 2, thereby can increase the intensity of cant beam 2 by chance.
The technical scheme of the utility model is not restricted in the scope of the described embodiment of the utility model.The utility model not technology contents of detailed description is known technology.

Claims (2)

1. the prefabricated case beam steel reinforcement cage is assembled mould bases; It is characterized in that: comprise two vertical bases (8); Vertically base (8) is gone up fixed installation several transverse base (7); Each transverse base (7) both sides are the cant beam (2) of a flare of symmetry installation respectively, and every cant beam (2) is gone up several horizontal sleeve pipes (3) are installed, and installing one in each horizontal sleeve pipe (3) can be along the steel pipe (4) of sleeve pipe (3) slip; Transverse base (7) goes up installs at least two foundation beams (6), and every cant beam (2) is gone up a central sill (5) is installed; Several notches (9) are offered in bottom girder (6) and central sill (5) upper end.
2. prefabricated case beam steel reinforcement cage assembling mould bases according to claim 1 is characterized in that: between cant beam (2) and the transverse base (7) vertical beam (1) is installed.
CN 201120299433 2011-08-17 2011-08-17 Die holder for assembling steel reinforcement cage of prefabricated box girder Expired - Lifetime CN202219536U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120299433 CN202219536U (en) 2011-08-17 2011-08-17 Die holder for assembling steel reinforcement cage of prefabricated box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120299433 CN202219536U (en) 2011-08-17 2011-08-17 Die holder for assembling steel reinforcement cage of prefabricated box girder

Publications (1)

Publication Number Publication Date
CN202219536U true CN202219536U (en) 2012-05-16

Family

ID=46041573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120299433 Expired - Lifetime CN202219536U (en) 2011-08-17 2011-08-17 Die holder for assembling steel reinforcement cage of prefabricated box girder

Country Status (1)

Country Link
CN (1) CN202219536U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102935660A (en) * 2012-10-29 2013-02-20 燕山大学 Metal net paving device
CN104842449A (en) * 2015-05-17 2015-08-19 天津第一市政公路工程有限公司 Detachable stationary type steel reinforcement framework binding pedestal and assembly and use method thereof
CN105313221A (en) * 2015-11-17 2016-02-10 中国建筑土木建设有限公司 Box girder web plate steel bar positioning device and construction method thereof
CN105821768A (en) * 2016-03-24 2016-08-03 浙江大学城市学院 Box girder bottom web reinforcing steel bar integral forming formwork and construction method
CN106544960A (en) * 2017-01-10 2017-03-29 山东省路桥集团有限公司 Tie with reinforcing bar support and reinforcing bar binding construction method
CN108380796A (en) * 2018-03-27 2018-08-10 建科机械(天津)股份有限公司 A kind of stirrup positioning device and steel reinforcement cage are molded assembly machine
CN117620566A (en) * 2023-12-08 2024-03-01 中铁四局集团有限公司 Automatic welding jig frame for steel reinforcement cage of box girder and prefabricating method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102935660A (en) * 2012-10-29 2013-02-20 燕山大学 Metal net paving device
CN102935660B (en) * 2012-10-29 2014-10-15 燕山大学 Metal net paving device
CN104842449A (en) * 2015-05-17 2015-08-19 天津第一市政公路工程有限公司 Detachable stationary type steel reinforcement framework binding pedestal and assembly and use method thereof
CN104842449B (en) * 2015-05-17 2017-03-08 天津第一市政公路工程有限公司 Dismountable stationary type reinforcing steel bar skeleton colligation pedestal and its assembling and using method
CN105313221A (en) * 2015-11-17 2016-02-10 中国建筑土木建设有限公司 Box girder web plate steel bar positioning device and construction method thereof
CN105313221B (en) * 2015-11-17 2017-07-07 中国建筑土木建设有限公司 Box girder web plate steel bar positioning device and construction method thereof
CN105821768A (en) * 2016-03-24 2016-08-03 浙江大学城市学院 Box girder bottom web reinforcing steel bar integral forming formwork and construction method
CN106544960A (en) * 2017-01-10 2017-03-29 山东省路桥集团有限公司 Tie with reinforcing bar support and reinforcing bar binding construction method
CN108380796A (en) * 2018-03-27 2018-08-10 建科机械(天津)股份有限公司 A kind of stirrup positioning device and steel reinforcement cage are molded assembly machine
CN108380796B (en) * 2018-03-27 2024-01-26 建科机械(天津)股份有限公司 Stirrup positioning device and reinforcement cage forming assembly machine
CN117620566A (en) * 2023-12-08 2024-03-01 中铁四局集团有限公司 Automatic welding jig frame for steel reinforcement cage of box girder and prefabricating method

Similar Documents

Publication Publication Date Title
CN202219536U (en) Die holder for assembling steel reinforcement cage of prefabricated box girder
CN102070071B (en) Steel reinforcement cage hoisting method
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN105201195A (en) Liftable supporting leg type elevator shaft construction platform and method
CN205973618U (en) Shell ring hoisting device in chimney
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN105088970A (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN205822626U (en) A kind of staggered form cantilever stair
CN206667458U (en) The constructing device of vestibule system steel structure girder
CN102322138A (en) The modular sliding formwork
CN202689496U (en) Moving platform for steel pipe concrete post concrete casing
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN201511439U (en) System for integrally binding and hoisting box girder steel reinforcement framework
CN204152527U (en) The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression
CN102777036A (en) Air reverse mechanical joint construction method of super-long vertical reinforcement cage
CN205296829U (en) Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN103981799A (en) Steel tube concrete string stiffness beam and construction method thereof
CN205602927U (en) Integral type hauler and leading wheel fixing device
CN205529929U (en) Whole shaping die carrier of case back slab muscle
CN203795318U (en) Integral hoisting system for rebar cage for large members
CN210482577U (en) A prop up top circulation system for three-dimensional prefabricated full assembled concrete structure
CN209383261U (en) The prefabricated assembled stair hoisting structure of fast-type
CN211735791U (en) Connection structure of laminated floor slab and beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120516