CN202215040U - Telescopic adjustable temporary wire drawing device for transmission line pole/tower - Google Patents

Telescopic adjustable temporary wire drawing device for transmission line pole/tower Download PDF

Info

Publication number
CN202215040U
CN202215040U CN2011202335603U CN201120233560U CN202215040U CN 202215040 U CN202215040 U CN 202215040U CN 2011202335603 U CN2011202335603 U CN 2011202335603U CN 201120233560 U CN201120233560 U CN 201120233560U CN 202215040 U CN202215040 U CN 202215040U
Authority
CN
China
Prior art keywords
steel
steel strand
power transmission
stranded galvanized
shaft tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202335603U
Other languages
Chinese (zh)
Inventor
黄振伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Luoyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN2011202335603U priority Critical patent/CN202215040U/en
Application granted granted Critical
Publication of CN202215040U publication Critical patent/CN202215040U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to the transmission line technology field, and discloses a telescopic adjustable temporary wire drawing device for a transmission line pole/tower. The telescopic adjustable temporary wire drawing device comprises a U-shaped draw ring (1), a crimping-type adjustable wire clamp (2), two galvanized steel strand (3), a clamp head (4) at the draw wire end and two steel plates (5). One wire ends of the two galvanized steel strand (3) pass through a pressure plate of the crimping-type adjustable wire clamp (2) and then are inserted in a steel anchor so as to be crimped. The other ends of the two galvanized steel strand (3) respectively pass through two symmetric circular holes in the upper and lower steel plates (5). Ends of the two galvanized steel strand (3) pass through steel strand linear hydraulic splicing sleeves so as to be crimped and connected. The telescopic adjustable temporary wire drawing device, which is convenient to firmly and reliably mount and dismount, is not limited by the pole height and the landform and can be widely applied to 110-220 kV transmission line pole/tower construction.

Description

A kind of power transmission sequence shaft tower adjustable length temporary guy device
Technical field
The utility model relates to the power transmission sequence technical field, relates in particular to a kind of power transmission sequence shaft tower adjustable length temporary guy device .
Background technology
At present; In the power transmission sequence construction; In order to prevent that the shaft tower parts from deforming and tilt and be provided with and draw temporarily, or with the strain insulator shaft tower when putting the Construction of Tension Stringing section, put the part of horizontal tension force of stringing for balance; Guarantee construction safety and stringing sag quality, must beat temporary guy at anchor support (angle tower) according to specification.
By rules requirement temporary guy over the ground angle not big or small 45 the degree and every stayguy direction consistent with circuit stringing negative side.Upper end fixed point and hanging wire point are good more closely more under the situation that does not influence hanging wire.In the power transmission sequence construction there be temporary guy kind commonly used: two kinds of wire rope temporary guy, stranded galvanized steel temporary guys.
Method of operating was during the wire rope temporary guy used: termination, wire rope top is fixed near the hanging point; Then manual work tighten up the wire rope temporary guy through double hook turnbuckle hook after, make a call to 2 to 3 back of the body buttons and the major-minor of wire rope restricted and lock with steel wire clamp.Adjust the elasticity of temporary guy through the length of adjustment double hook turnbuckle.The advantage of wire rope temporary guy is to reuse, but weak point is: double hook turnbuckle on the stay rod and the steel wire clamp on the wire rope can't be taked reliable anti-theft measure, have potential safety hazard.The wire rope back of the body is buckled stressed place and is formed dog leg easily in addition, permanent deformation occurs, reduces application life.Stranded galvanized steel temporary guy often upper end uses wedge clamp to be connected with shaft tower hanging point place; The lower end uses NUT molded lines folder to link to each other with stay rod or earth anchor steel wire cover; On the NUT molded lines folder bolt anti-theft device can be installed; When but reuse next time the steel strand temporary guy be not long be exactly too short, long will cutting, thus cause waste.Too short will the exhibition again put a temporary guy or with an other butt joint, caused trouble.More than two kinds of temporary guys long or too short phenomenons to occur be because exhaling of different overhead line structures models claims that high environment, landform, the discrepancy in elevation different and construction also are not quite similar in the power transmission sequence construction; The length of employed temporary guy just has nothing in common with each other; Therefore used stranded galvanized steel temporary guy has inconvenience more when reusing; In order to overcome above disadvantage; Through constantly exploring and innovation, adopt a kind of telescopic adjustable temporary guy, not only solved above weak point and also reduced material cost and practiced thrift the time of playing backguy.
Summary of the invention
Based on the problem that above-mentioned temporary guy exists in real work, the utility model provides a kind of power transmission sequence shaft tower adjustable length temporary guy device.Have the restriction that does not receive bar height and landform, easy installation and removal, solid and reliable, can be widely used in the temporary guy setting in 110KV~220KV power transmission sequence shaft tower construction.
For realizing goal of the invention as stated, the utility model adopts following technical scheme:
A kind of power transmission sequence shaft tower adjustable length temporary guy device; Comprise: U draw ring, the adjustable wire clamp of compression joint type, two stranded galvanized steels, steel strand straight line hydraulic pressure splicing sleeve, two block plates; After one rear line head of said two stranded galvanized steels passes the adjustable wire clamp pressing plate of compression joint type respectively, with carrying out crimping in stranded galvanized steel the end of a thread insertion steel anchor; The other end of two stranded galvanized steels passes respectively in the circular hole of two symmetries that upper and lower two block plates are provided with, and the termination of two stranded galvanized steels penetrates the crimping of steel strand straight line hydraulic pressure splicing sleeve respectively and connects.
A kind of power transmission sequence shaft tower adjustable length temporary guy device ,Steel strand straight line hydraulic pressure splicing sleeve is that 50 type length are 10 mm.
A kind of power transmission sequence shaft tower adjustable length temporary guy device, two block plates are respectively rectangular slab, the thick steel plate that is respectively 200 mm * 50 mm * 15mm of the length and width of rectangular slab; Bore the circular hole of four Ф 9.5 mm respectively at steel plate upper and lower side 40 mm places, distance is 10 mm between two circular holes of upper and lower side.
A kind of power transmission sequence shaft tower adjustable length temporary guy device, stranded galvanized steel is respectively two, and length is 30000mm, and sectional area is 50 mm 2, diameter is 9.0 mm.
Owing to adopt aforesaid technical scheme, the utlity model has following superiority:
A kind of power transmission sequence shaft tower adjustable length temporary guy device does not receive the restriction of bar height and landform, and easy installation and removal is solid and reliable, can be widely used in the temporary guy setting in 110KV~220KV power transmission sequence shaft tower construction.
Description of drawings
Fig. 1 is the structure chart of power transmission sequence shaft tower adjustable length temporary guy device;
The rear elevation that Fig. 2 for Fig. 1 is;
The lateral view that Fig. 3 for Fig. 1 is;
Among the figure: 1-U draw ring, the adjustable wire clamp of 2-compression joint type, 3-stranded galvanized steel, 4-steel strand straight line hydraulic pressure splicing sleeve, 5-steel plate.
The specific embodiment
Like Fig. 1,2, shown in 3; A kind of power transmission sequence shaft tower adjustable length temporary guy device; Comprise: U draw ring 1, compression joint type is adjustable wire clamp 2, two stranded galvanized steels 3, steel strand straight line hydraulic pressure splicing sleeve 4, two block plates 5; After one rear line head of said two stranded galvanized steels 3 passes adjustable wire clamp 2 pressing plates of compression joint type respectively, with carrying out crimping in stranded galvanized steel 3 the end of a thread insertion steel anchor; The other end of two stranded galvanized steels 3 passes respectively in the circular hole of two symmetries that upper and lower two block plates 5 are provided with, and the termination of two stranded galvanized steels 3 penetrates 4 crimping of steel strand straight line hydraulic pressure splicing sleeve respectively and connects.
Said steel strand straight line hydraulic pressure splicing sleeve is that 50 type length are 10 mm.
Said two block plates 5 are respectively rectangular slab, the thick steel plate that is respectively 200 mm * 50 mm * 15mm of the length and width of rectangular slab; Bore the circular hole of four Ф 9.5 mm respectively at steel plate upper and lower side 40 mm places, distance is 10 mm between two circular holes of upper and lower side.
Said stranded galvanized steel 3 is respectively two, and length is 30000mm, and sectional area is 50 mm 2, diameter is 9.0 mm.
During use,
As shown in Figure 1, at first select the generous steel plate that is respectively 200 mm * 50 mm * 15mm of two block lengths for use, bore the circular hole of four Ф 9.5 mm respectively at steel plate upper and lower side 40 mm places, distance is 10 mm between two circular holes of upper and lower side, selecting sectional area then is 50 mm 2Its diameter is the stranded galvanized steel of 9.0 mm,
Two length of clip are respectively 30000mm.
After one rear line head of two stranded galvanized steels passes compression joint type NLY-50 molded lines cramping plate 2 respectively, stranded galvanized steel the end of a thread inserted in the steel anchor carries out crimping,
Then by shown in Figure 3, the other end of two stranded galvanized steels to be passed respectively in the circular hole of two block plates symmetry up and down, it is that the 50 shaped steel twisted wire straight line hydraulic pressure splicing sleeves of 10 mm carry out crimping that the termination of two stranded galvanized steels penetrates length respectively.The telescopic adjustable temporary guy of a kind of power transmission sequence shaft tower is accomplished at this point.
As shown in Figure 3, adjust the distance between two block plates, the length of whole temporary guy will change thereupon.The U draw ring of stranded galvanized steel temporary guy upper end is fixed near the shaft tower hanging point; According to the distance between backguy hole, job site and the shaft tower hanging point; Adjust the flexible length of stranded galvanized steel between two block plates up and down, the length of stranded galvanized steel temporary guy and distance that backguy is cheated between the hanging point are just conformed, the wire clamp of temporary guy lower end is fixed on stay rod or the earth anchor steel wire puts; After adjusting bolt on the adjustment wire clamp makes it stressed tightening up, anti-theft device is installed at last.Said compression joint type is adjustable, and wire clamp 2 is NLY-50 type, and stranded galvanized steel 3 is the GL-50 type.
Construction period is adopted single or double joint temporary guy according to stressed big I, also can increase the sectional area of stranded galvanized steel, comes the tension force of the monolateral hanging wire of balance shaft tower as adopting GJ-70 type stranded galvanized steel.

Claims (4)

1. power transmission sequence shaft tower adjustable length temporary guy device; It is characterized in that: comprising: U draw ring (1), the adjustable wire clamp of compression joint type (2), two stranded galvanized steels (3), steel strand straight line hydraulic pressure splicing sleeve (4), two block plates (5); After one rear line head of said two stranded galvanized steels (3) passes the adjustable wire clamp of compression joint type (2) pressing plate respectively, with carrying out crimping in stranded galvanized steel (3) the end of a thread insertion steel anchor; The other end of two stranded galvanized steels (3) passes respectively in the circular hole of two symmetries that upper and lower two block plates (5) are provided with, and the termination of two stranded galvanized steels (3) penetrates steel strand straight line hydraulic pressure splicing sleeve (4) crimping respectively and connects.
2. a kind of power transmission sequence shaft tower adjustable length temporary guy device as claimed in claim 1 ,It is characterized in that: steel strand straight line hydraulic pressure splicing sleeve (4) is that 50 type length are 10 mm.
3. a kind of power transmission sequence shaft tower adjustable length temporary guy device as claimed in claim 1, it is characterized in that: two block plates (5) are respectively rectangular slab, the thick steel plate that is respectively 200 mm * 50 mm * 15mm of the length and width of rectangular slab; Bore the circular hole of four Ф 9.5 mm respectively at steel plate upper and lower side 40 mm places, distance is 10 mm between two circular holes of upper and lower side.
4. a kind of power transmission sequence shaft tower adjustable length temporary guy device as claimed in claim 1, it is characterized in that: stranded galvanized steel (3) is respectively two, and length is 30000mm, and sectional area is 50 mm 2, diameter is 9.0 mm.
CN2011202335603U 2011-07-05 2011-07-05 Telescopic adjustable temporary wire drawing device for transmission line pole/tower Expired - Fee Related CN202215040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202335603U CN202215040U (en) 2011-07-05 2011-07-05 Telescopic adjustable temporary wire drawing device for transmission line pole/tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202335603U CN202215040U (en) 2011-07-05 2011-07-05 Telescopic adjustable temporary wire drawing device for transmission line pole/tower

Publications (1)

Publication Number Publication Date
CN202215040U true CN202215040U (en) 2012-05-09

Family

ID=46014300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202335603U Expired - Fee Related CN202215040U (en) 2011-07-05 2011-07-05 Telescopic adjustable temporary wire drawing device for transmission line pole/tower

Country Status (1)

Country Link
CN (1) CN202215040U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836941A (en) * 2017-03-08 2017-06-13 长葛市恒瑞电瓷电器有限公司 Pulling device under a kind of novel guy
CN108005460A (en) * 2017-12-18 2018-05-08 国网山东省电力公司潍坊供电公司 Novel guy bar device
CN111188872A (en) * 2020-01-10 2020-05-22 中铁大桥局第七工程有限公司 Traction connecting device for steel wire rope and steel strand and installation method thereof
CN113739974A (en) * 2021-08-11 2021-12-03 中国电建集团山东电力建设第一工程有限公司 Tension-adjustable stay wire joint and stay wire foundation of all-steel stay wire tower
CN115949281A (en) * 2023-01-30 2023-04-11 湛江市钧泰电气有限公司 Electric power anchor bar

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836941A (en) * 2017-03-08 2017-06-13 长葛市恒瑞电瓷电器有限公司 Pulling device under a kind of novel guy
CN108005460A (en) * 2017-12-18 2018-05-08 国网山东省电力公司潍坊供电公司 Novel guy bar device
CN111188872A (en) * 2020-01-10 2020-05-22 中铁大桥局第七工程有限公司 Traction connecting device for steel wire rope and steel strand and installation method thereof
CN113739974A (en) * 2021-08-11 2021-12-03 中国电建集团山东电力建设第一工程有限公司 Tension-adjustable stay wire joint and stay wire foundation of all-steel stay wire tower
WO2023016238A1 (en) * 2021-08-11 2023-02-16 中国电建集团山东电力建设第一工程有限公司 Tension-adjustable pull wire joint and all-steel pull wire tower pull wire foundation
CN113739974B (en) * 2021-08-11 2023-10-20 中国电建集团山东电力建设第一工程有限公司 Tension-adjustable stay wire connector and all-steel stay wire tower stay wire foundation
CN115949281A (en) * 2023-01-30 2023-04-11 湛江市钧泰电气有限公司 Electric power anchor bar
CN115949281B (en) * 2023-01-30 2023-10-20 国网黑龙江省电力有限公司黑河供电公司 Electric power wire rod

Similar Documents

Publication Publication Date Title
CN202215040U (en) Telescopic adjustable temporary wire drawing device for transmission line pole/tower
CN205123185U (en) Non -maintaining insulator wire fixation clamp
CN206310779U (en) A kind of suspended-cable structure large span photovoltaic bracket
CN109083331B (en) Fast-assembling prestressed anchorage for concrete building
CN203296451U (en) Pole straightening device
CN207701152U (en) Support system for coal road weak broken top plate
CN201944193U (en) Clamping head of steel strand
CN111456449A (en) Construction device and method for guaranteeing uniform stress of each bundle of steel strands through beam body post-tensioning method
CN103601033B (en) Bundling wire square forming device
CN107227692B (en) Diagonal buckling and hanging installation system
CN211524270U (en) Wall wire drawing device
CN210713232U (en) Steel wire end connection fixing structure
CN104005410A (en) Tensioning and anchoring device based on unbonded prestress reinforced soil technology
CN210712913U (en) Pulley inhaul cable device for fixing inclined roof concrete foundation
CN205259191U (en) Fish belly formula compensating beam of equilibrant equipartition
CN217427586U (en) High drop cable terminal fixing structure
CN218541747U (en) Warning frame construction structures of high-voltage line protection
CN220813444U (en) Integral tensioning tool for stay cable anchorage device
CN220813394U (en) Arch bridge draws to hang knot cable anchoring structure and anchor
KR102305530B1 (en) Upper part support for electric pole
CN203373662U (en) Combined type steel strand limiting device
CN215414717U (en) Clamp suitable for drawing experiment of check net
CN219041233U (en) Wire anti-running rope
CN220133583U (en) Anchor device for external prestress reinforcement
CN221202107U (en) Double-circuit low-voltage cable upper rod device structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509

Termination date: 20120705