CN202214965U CN2011202524605U CN201120252460U CN202214965U CN 202214965 U CN202214965 U CN 202214965U CN 2011202524605 U CN2011202524605 U CN 2011202524605U CN 201120252460 U CN201120252460 U CN 201120252460U CN 202214965 U CN202214965 U CN 202214965U
Authority
CN
China
Prior art keywords
column
guide rail
upright post
electric machinery
underframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202524605U
Other languages
Chinese (zh)
Inventor
黄仕安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Strong Mechanical And Electrical Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202524605U priority Critical patent/CN202214965U/en
Application granted granted Critical
Publication of CN202214965U publication Critical patent/CN202214965U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses complete electric mechanical whitewashing equipment, which comprises a whitewashing machine. The whitewashing machine comprises a circular tube guide rail, a base, an upright post, a working box, a cross beam, a vertical instrument and a power traction system, and further comprises a manned lifting platform device, wherein the base is arranged on the circular tube guide rail through a V-shaped road wheel; the upright post is fixed on the base; the working box is mounted on the upright post and can slide vertically along the upright post; the cross beam is fixed on the upright post; the vertical instrument is arranged on the upright post; the manned lifting platform device works by matching with the whitewashing machine; the manned lifting platform device comprises a bottom frame; universal wheels with brakes are mounted on the lower surface of the bottom frame; the bottom frame is provided with an upward guiding post; the guiding post is provided with a working platform; and the bottom frame is provided with a steel wire rope power traction device of the working platform. By adopting the manned lifting platform device working by matching with the whitewashing machine, the complete electric mechanical whitewashing equipment has the advantages of being convenient to mount, disassemble and operate.

Description

A kind of complete rendering wall by electric machinery equipment
Technical field
The utility model belongs to construction machine, is specifically related to a kind of complete rendering wall by electric machinery equipment.
Background technology
In building operations, the existing report that adopts mechanical device of the construction of interior wall foundation cream ash discloses a kind of plastering machine like Chinese patent 200820159450.5.Also there are some unsatisfactory places in actual use in this plastering machine: the one, install, dismantle and operate all inconvenient; The 2nd, guide rail and pillar construction are unreasonable, insufficient strength, easy deformation when holding out against fixedly.
The utility model content
The purpose of the utility model is the defective that exists to prior art, has proposed the complete rendering wall by electric machinery equipment of a kind of convenient installation, dismounting and operation.
Realize that the technical scheme that the utility model purpose adopts is: comprise a plastering machine, said plastering machine comprise the pipe guide rail, through V-arrangement road wheel be arranged on base on the pipe guide rail, be fixed on column on the base, be contained on the column can along its work box that slides up and down, be fixed on the column top crossbeam, be located at vertical collimator, power traction system on the column; Also comprise the manned lift stage apparatus that cooperates said plastering machine work; Said manned lift stage apparatus comprises underframe, and the universal wheel of strap brake is housed below the underframe, and underframe is provided with lead upwards, and lead is provided with working platform, and the wire rope dynamic traction device of working platform is housed on the underframe.
Said pipe guide rail is through the positioning seat stationary positioned, and said positioning seat comprises a plate body, is welded with the V-arrangement fastener above the plate body, and the front of V-arrangement fastener is provided with the location adjustment screw, and the plate body bottom surface is provided with rubber tile, can increase the frictional force that contacts with ground.
Said column adopts special-shaped column, is formed by square tube and angle bar seam, and by the more piece combination, the straight pin location connects with clamping plate, has enough rigidity.
Said vertical collimator is by being hinged on fork in the column through ball bearing, being located at the pointer of fork bottom and the steady wheel that is located on the fork is formed.
Be provided with the self-locking mechanism of forming by a pair of transition pulley that is used for wire rope in the said power traction system.
The utility model is owing to adopted the manned lift stage apparatus with the plastering machine cooperating; During construction; The rising or falling speed of manned lift stage apparatus and said work box are synchronous, can solve the following problem of rendering wall by electric machinery machine: 1, make things convenient for the said column of installation and removal.2, the holding device on the said crossbeam of handled easily.Can adjust mortar in the said ash bucket when 3, working at any time.4, when said work box rises to upper limit, cut off the adhesion of scraper plate and metope mortar, and operate said ash bucket adjusting device and recess metope.Adopt positioning seat to be, can avoid the two ends mode of holding out against to cause the problem of pipe guide rail distortion the benefit of pipe guide rail stationary positioned.Said column adopts the special-shaped column that is formed by square tube and angle bar seam, has enough rigidity, is not easy distortion when holding out against.
Specify below in conjunction with the embodiment of accompanying drawing the utility model.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the plastering machine structural representation of the utility model.
Fig. 3 is that A-A of Fig. 2 is to view.
Fig. 4 is that B-B of Fig. 2 is to view.
Fig. 5 is that the P of Fig. 3 is to view.
Fig. 6 is the assembling sketch map of plastering machine central post.
Fig. 7 is the structural representation of vertical collimator in the column.
Fig. 8 is an I place partial enlarged drawing among Fig. 6.
Fig. 9 is that C-C among Fig. 6 is to view.
Figure 10 is the scheme of installation of pipe guide rail in the plastering machine.
Figure 11 is that D-D among Figure 10 is to view.
Figure 12 is the lift platform structural representation of the utility model.
Figure 13 is the lateral plan of Figure 12.
The specific embodiment:
The complete rendering wall by electric machinery equipment of the utility model is as shown in Figure 1; Comprise a plastering machine M, said plastering machine M comprise pipe guide rail 2, through V-arrangement road wheel 3 be arranged on base 4 on the pipe guide rail 2, be fixed on column 11 on the base 4, being contained on the column 11 can be along its work box that slides up and down 9, be fixed on the crossbeam 12 of column 11 tops; Also comprise the manned lift stage apparatus N that cooperates said plastering machine M work, plastering machine M and manned lift stage apparatus N supply power through the power supply box 14 of band plug 13, and are operated by control box 15.
Said manned lift stage apparatus N is like Figure 12, shown in 13; Comprise underframe 36, the universal wheel 34 of strap brake is housed below the underframe 36, underframe 36 is provided with lead 40 upwards; Lead 40 is provided with working platform 39; The roller 38 that guiding is housed on the working platform 39 cooperates with lead 40, and the dynamic traction device 35 of working platform 39 is housed on the underframe 36, and dynamic traction device 35 adopts wire rope 37 traction working platformes 39.
Like Fig. 1,10, shown in 11, the pipe guide rail 2 among the plastering machine M is through positioning seat 1 stationary positioned, and said positioning seat 1 comprises a plate body 56; 56 faces are welded with V-arrangement fastener 54 on the plate body; The front of V-arrangement fastener 54 is provided with location adjustment screw 53, and the plate body bottom surface is provided with rubber tile, can increase the frictional force with ground; V-arrangement fastener 54 can be firm block pipe guide rail 2, location adjustment screw 53 can be adjusted the distance of pipe guide rail 2 and metope easily.
The general frame pipe in said pipe guide rail 2 employing building site; Select for use with by white washed wall face length degree corresponding straight line frame pipe, it is positioned over parallel with desirable metope, on the ground in requiring size range; Pad is gone up a plurality of positioning seats 1 below, and the dog screw 53 of positioning seat 1 is leaned the blank metope.
Shown in Fig. 1, Fig. 6-9, said column 11 adopts special-shaped column, form by square tube 57 and angle bar 58 seam, and the more piece combination, every joint bolt 51 usefulness clamping plate 42 connect, and alignment pin 52 location have enough rigidity.Column 11 is divided into basic column 41, hang down appearance column 43, adjustment column 44 and cross beam and upright post 45, and basic column 41 is fixed on the base, and the appearance column 43 that will hang down is connected with basic column 41.Column verticality adjusting device 6 is housed on the base.In the vertical appearance column 43 vertical collimator 48 is housed.Vertical collimator 48 by hold the fork 47 that is hinged in the column through ball axle 46, be located at the pointer 49 of fork 47 bottoms and be located at the fork bottom steady wheel 50 form; After steady wheel 50 is set; When fork 47 is swung in column 11; Can reduce the friction between fork 47 and column 11 inwalls, prevent killing of fork 47.According to the indication of 49 pairs of vertical scale lines of pointer a of vertical collimator 48 on the appearance column 43 that hangs down, transfer column 11 vertical with the adjusting device on the base 46.Both have guaranteed the rapid adjustment of column 11 verticality steady wheel 50 on adjusting device 6 and the vertical collimator 48.Column 11 can select for use minimum joint number to solve the combination needs of room arbitrary height.
It is that actual height according to empty in the room confirms that the operator stands on the manned lift stage apparatus N that the different length of adjustment column 44 is selected for use, and column is assembled easily.
As shown in Figure 2, on the said crossbeam 12 holding device 19 is housed, the holding device end is a rubber parts, the column after will aligning holds out against.The operator stands in the holding device 19 of screwing on the manned lift stage apparatus N, and the rendering wall by electric machinery machine is firmly installed.
Like Fig. 2, shown in Figure 4, said work box 9 comprises ash bucket 18 and carriage 16, and the guide pillar of fixing on fixing guide pin bushing 8 and the carriage 16 on the ash bucket 18 that scale marker is arranged 10 is connected, and through the handle of ash bucket adjusting device 7, screw pair 33 is directly controlled the advance and retreat of ash bucket 18.Work box 9 is to rely on guide wheel 17; Hang down appearance column 43 prothecas on basic column 41 (referring to Fig. 6) being unkitted; Carriage 16, scraper plate 30, ash bucket 18 and ash bucket adjusting device 7 are housed on the work box 9, the handle of rotation ash bucket adjusting device 7, can with scraper plate 30 transfer to by the requirement distance of white washed wall face.Puddler 29 is housed on the work box 9, and puddler is independently driven through chain 32 by motor 21.Puddler 29 rotations were got to mortar on the metope when work box rose.
Like Fig. 1-shown in Figure 3; On the said base 4 power traction system 24 is housed; Power traction system 24 comprises motor 22, rope-winding wheel 26 and is contained in the common assembly pulleys of forming of pulley 60,20,59,25,61 on work box 9, the crossbeam 12, also comprises the self-locking mechanism (see figure 5) of being made up of a pair of transition pulley 28 that is used for wire rope.Drive work box 9 by wire rope 23 through assembly pulley and on column 11, move, make wire rope 23 self-lockings, laterally move through the roller 27 that is welded with pulley 61 and arrange rope, to realize self-locking, the control of row's rope wire rope with pulley 25 through transition pulley 28.
The help of operator through manned lift stage apparatus N installs the wire rope 23 from rope-winding wheel 26 extractions on request, the mortar of can packing in the ash bucket 18 of work box 9; Through button box 15, start stirring motor 21, make puddler 29 rotations; Work box 9 rises, and scraper plate 30 is scraped mortar on the blank wall equably, starts the working platform 39 of manned lift stage apparatus N subsequently; Operator on its platform 39 puts mortar at any time in order, and the increase-volume wallboard 31 that in good time falls down is when work box 9 rises to extreme position; Limit switch stops it automatically, and the operator breaks off the adhesion of scraper plate 30 and metope mortar, unclamps the adjusting device 7 on the work box 9; Make scraper plate 30 leave the metope certain distance, fall work box 9, unclamp holding device 19 on the crossbeam 12 through controling box 15; Adjusting device 6 on the rotating base 4 lands two universal wheels 5 of back, pushes the rendering wall by electric machinery machine to next station along pipe guide rail 2.
After a room powder was intact, as long as the bolt 51 of binding clip 42 is dismantled on the appearance column 43 that will hang down, the operator stood on the working platform 39 of manned lift stage apparatus N, unloaded lower transverse beam 12 and part column, can push plastering machine to the next one from door opening and treat the powder room.

Claims (5)

1. a kind of complete rendering wall by electric machinery equipment; Comprise a plastering machine, said plastering machine comprise the pipe guide rail, through V-arrangement road wheel be arranged on base on the pipe guide rail, be fixed on column on the base, be contained on the column can along its work box that slides up and down, be fixed on the column top crossbeam, be located at vertical collimator, power traction system on the column; It is characterized in that also comprising the manned lift stage apparatus that cooperates said plastering machine work; Said manned lift stage apparatus comprises underframe, and the universal wheel of strap brake is housed below the underframe, and underframe is provided with lead upwards, and lead is provided with working platform, and the wire rope dynamic traction device of working platform is housed on the underframe.
2. complete rendering wall by electric machinery equipment according to claim 1; It is characterized in that said pipe guide rail is through the positioning seat stationary positioned; Said positioning seat comprises a plate body, is welded with the V-arrangement fastener above the plate body, and the front of V-arrangement fastener is provided with the location adjustment screw; The plate body bottom surface is provided with rubber tile, can increase the frictional force that contacts with ground.
3. complete rendering wall by electric machinery equipment according to claim 1 and 2 is characterized in that said column adopts special-shaped column, is formed by square tube and angle bar seam, and by the more piece combination, the straight pin location connects with clamping plate.
4. complete rendering wall by electric machinery equipment according to claim 3 is characterized in that said vertical collimator is by being hinged on fork in the column through ball bearing, being located at the pointer of fork bottom and the steady wheel that is located on the fork is formed.
5. complete rendering wall by electric machinery equipment according to claim 4 is characterized in that in the power traction system, being provided with the self-locking mechanism of being made up of a pair of transition pulley that is used for wire rope.
CN2011202524605U 2011-07-18 2011-07-18 Complete electric mechanical whitewashing equipment Expired - Fee Related CN202214965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202524605U CN202214965U (en) 2011-07-18 2011-07-18 Complete electric mechanical whitewashing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202524605U CN202214965U (en) 2011-07-18 2011-07-18 Complete electric mechanical whitewashing equipment

Publications (1)

Publication Number Publication Date
CN202214965U true CN202214965U (en) 2012-05-09

Family

ID=46014225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202524605U Expired - Fee Related CN202214965U (en) 2011-07-18 2011-07-18 Complete electric mechanical whitewashing equipment

Country Status (1)

Country Link
CN (1) CN202214965U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074342A (en) * 2014-07-18 2014-10-01 王建虎 Overload protection device
CN109339412A (en) * 2018-12-03 2019-02-15 陈秀文 A kind of subsequent automated mechanical wall plastering equipment of mechanically spraying

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074342A (en) * 2014-07-18 2014-10-01 王建虎 Overload protection device
CN104074342B (en) * 2014-07-18 2016-06-01 佛山市突破机械制造有限公司 A kind of overload protection arrangement
CN109339412A (en) * 2018-12-03 2019-02-15 陈秀文 A kind of subsequent automated mechanical wall plastering equipment of mechanically spraying

Similar Documents

Publication Publication Date Title
CN104607860B (en) A kind of fixture of pipeline boxing jig
CN105000482B (en) Tower crane with walking mechanism
CN112554823B (en) Municipal works detect and get core device with concrete road surface drilling
CN101644146B (en) Four degree-of-freedom shift operation device for continuous oil pipe injection head
CN209881225U (en) Trolley for mounting cable trough box
CN204474187U (en) A kind of wall type turning crane
CN206205894U (en) Monoblock type automatic telescopic Mobile reinforcement stand
CN111236660B (en) Auxiliary equipment for steel assembly and use method thereof
CN111472789B (en) Pipe jacking construction process
CN112554559A (en) Clamping device for splicing building templates
CN202214965U (en) Complete electric mechanical whitewashing equipment
CN111236659B (en) Composition of auxiliary equipment for steel assembly
CN106078035A (en) Bonding machine mechanical arm station location and adjusting means
CN201258695Y (en) Portable drill stand
CN108678395B (en) Fixing device of hoisting type building supporting device
CN114412203B (en) Auxiliary device for hoisting and positioning prefabricated wall components
CN206319628U (en) One kind building assembled wallboard fitting machine
CN213014270U (en) Jacking sliding plate upright post of pile driver
CN210435418U (en) Drilling auxiliary device of handheld drilling machine
CN211164702U (en) Beam slab bar planting drilling tool
CN202245924U (en) Pit type framework tipper of rail transit rolling stock
CN211010595U (en) Adjustable support device
CN202465190U (en) Lifting trolley
CN209021527U (en) Tooling platform for pump case built-up welding
CN104441261B (en) Automatic stone unloading device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHANGSHA SHIQIANG ELECTROMECHANICAL TECHNOLOGY CO.

Free format text: FORMER OWNER: HUANG SHIAN

Effective date: 20121205

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 410000 CHANGSHA, HUNAN PROVINCE TO: 410008 CHANGSHA, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121205

Address after: 410008 Hunan province Changsha Kaifu District, built Hunan Road No. 521 light salt building room 407

Patentee after: Changsha strong mechanical and Electrical Technology Co., Ltd.

Address before: 410000, room 1, 1102 Yuan Yuan Garden, 236 Hengda Road, Hunan, Changsha

Patentee before: Huang Shian

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509