CN202208905U - Integral groove counterfort type revetment and causeway - Google Patents

Integral groove counterfort type revetment and causeway Download PDF

Info

Publication number
CN202208905U
CN202208905U CN2011202847616U CN201120284761U CN202208905U CN 202208905 U CN202208905 U CN 202208905U CN 2011202847616 U CN2011202847616 U CN 2011202847616U CN 201120284761 U CN201120284761 U CN 201120284761U CN 202208905 U CN202208905 U CN 202208905U
Authority
CN
China
Prior art keywords
counterfort
deck
buoyancy tank
base plate
side plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202847616U
Other languages
Chinese (zh)
Inventor
朱元康
林�吉
翟和
林旭
罗莹
施华郎
唐庆平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN JILUN MARINE INVESTEMENT Co Ltd
Original Assignee
FUJIAN JILUN MARINE INVESTEMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN JILUN MARINE INVESTEMENT Co Ltd filed Critical FUJIAN JILUN MARINE INVESTEMENT Co Ltd
Priority to CN2011202847616U priority Critical patent/CN202208905U/en
Application granted granted Critical
Publication of CN202208905U publication Critical patent/CN202208905U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to an integral groove counterfort type revetment and causeway, which is composed of a buoyancy tank and a counterfort fixed on the upper surface of the buoyancy tank. The buoyancy tank is a tank body structure composed of front and rear board lateral plates, left and right lateral wall plates, a deck on the upper surface and a bottom plate on the lower surface in an enclosing manner. At least one row of longitudinal cabin wall parallel to the board lateral plates is arranged in the tank body. The upper end of the longitudinal cabin wall is connected to the deck. The lower end of the longitudinal cabin wall is connected to the bottom plate. At least one row of longitudinal cabin wall parallel to a transverse cabin wall is also arranged in the tank body. The upper end of the longitudinal cabin wall is connected to the deck. The lower end of the longitudinal cabin wall is connected to the bottom plate. Crisscross and downwardly convex skirt plates are also arranged below the bottom surface of the tank body. Toe plates outwardly extending are arranged below four side surfaces of the tank body. A connection base parallel to the board lateral plates is arranged at one side of the front part of the buoyancy tank deck. The counterfort is arranged on the base. A top plate is arranged at the topmost of the counterfort. The integral groove counterfort type revetment and causeway disclosed by the utility model mainly has the advantages of being simple in structure, convenient for installation, low in cost, good in use effect and the like.

Description

Overall structure grooved counterfort formula revetment and embankment
Technical field
The utility model relates to a kind of overall structure grooved counterfort formula revetment and embankment.
Background technology
Enclosing and cultivating embankment in soft basic revetment in the port works and the hydraulic engineering, mostly is gravity structure, and the carrying of soft base, the resistance to overturning of agent structure and capacity of anti-storm are to perplex the emphasis difficult point problem that correlation engineering is built for a long time.Revetment to after soft base of deep layer or the reparation integral slipping destruction often adopts the pile foundation of various ways to handle, and with carrying and the resistance to overturning that solves soft base, but engineering cost is expensive.Conventional treatment of soft foundation like the draining sand drain, insert and mould plate, piling prepressing, vacuum preloading, combined stack-load precompressed etc., all can reach the requirement of discharging consolidation, but long construction period, and the inhomogeneities of settlement after construction and ageing construction infection to agent structure are bigger.
For the soft base of shallow-layer, when adopting compacting mud by explosion and packing sedimentation by throwing stones technology not to reach designing requirement, normal employing is excavated to bearing stratum on a large scale, again the fill block stone throwing bedding.No matter adopt which kind of technology, all the consumption because of building stones is huge, and land a large amount of building stones that blast add the side of abandoning of underwater excavation again, all can do great damage to peripheral ecological environment.
Because these revetments and embankment agent structure are mostly piled up the loose structure that forms for earth and stone material, the capacity of anti-storm extreme difference, the unrestrained facility that disappears must be taked in the outside, and often weigh several tons prefabricated concrete of use is turned round king's piece or twist-shaped block in a large number.Although main material all is the cheap cubic metre of earth and stone, the factor amount is huge, because construction organization and labour's arrangement are extremely difficult, receives the factor of natural conditions restriction a lot, long construction period, and investment is big, directly has influence on the sustainable development of national economy.
Summary of the invention
It is a kind of simple in structure that the utility model purpose is to provide, result of use good whole structure grooved counterfort formula revetment and embankment.
The purpose of the utility model is such realization: it is made up of buoyancy tank and the counterfort that is fixed on the buoyancy tank upper surface; Described buoyancy tank is the side plate by forward and backward; Deck that left and right side front sheet, upper surface are provided with and soffit are provided with the body structure that base plate surrounds; In casing, be provided with at least one row longitudinal bulkhead parallel with side plate; Connect deck, lower end connection base plate on the described longitudinal bulkhead, in casing, also be provided with the described longitudinal bulkhead of at least one row longitudinal bulkhead parallel upper end and connect deck, lower end connection base plate with transverse bulkhead; Below tank floor, also be provided with crisscross protruding skirtboard downwards, below four sides of casing, be provided with the toe board that extends laterally; One side is provided with the connection base parallel with side plate in the front of pontoon deck, on base, is provided with counterfort, and the top of counterfort is provided with top board.
The advantage of the utility model is following: (1) adopts hollow preform steel bar concrete buoyancy tank to do the basis, has good integrity, and dead load is light, and buoyancy tank monomer volume can reach 1000~3000m 3Buoyancy tank can be in factory organize prefabricated assembling to produce in batches by positional flow method, also organizing construction at the scene.
After the buoyancy tank monomer builds up down water, can take advantage of damp transportation by driving to assigned position, the location of pouring water, and to the soft base enforcement loading precompressed below the substrate, carry out discharging consolidation and handle.
(2) buoyancy tank monomer applications settling type technology is provided with the skirtboard and the toe board of certain altitude and width, and is provided with vacuum absorption device in the bottom.The antiskid that has improved agent structure moves, overturning or slip resistance analysis and resistance to overturning.
(3) the buoyancy tank monomer outside is provided with feeding/discharging device, puts in place when soft base loads precompressed, after inboard backfill is accomplished; Can feeding/discharging device be opened; When low tide, can discharge Ballast Water in the case to basis off-load effect, improve the safety factor of resistance to overturning, during high-tide level; Seawater gets into buoyancy tank automatically, can effectively overcome at the incoming tide the uplift pressure to buoyancy tank produced.
(4) after the agent structure that with the buoyancy tank is the basis is used the several years, can use waste plastic foam and marine progressively filling of floating thing of reclaiming in the buoyancy tank.Filler is inserted from the preformed hole of outer panel, after segmentation is filled up basically, preformed hole and topside is advanced the drain hole sealing, pours into the fixed formation ultra-large type of cement paste light foam concrete block with the high pressure cement stock pump, and engineering construction is combined with environmental protection.
(5) the grooved counterfort can be given full play to the mechanical property of structural meterials, and vertical male and fomale(M&F) helps the impact energy of decaying wind wave, improves the stability of agent structure.
(6) grooved counterfort structure helps the processing of the division of flat section, prefabricated, transportation, lifting, segmentation seam, and with being connected of buoyancy tank basis.
(7) the prefabricate assembling can be adopted with the grooved counterfort in the buoyancy tank basis, and easy construction is workable, for ground engineering employing layering is made in the strand, piecemeal is implemented reclamation by pumping filling and created condition.
(8) agent structure all can realize modularization, batch production production, and short construction period, cost is low, quality good.
(9) agent structure all is prefabricated assembling type reinforced concrete structure, has saved a large amount of earthwork evacuation engineerings, helps protecting the ecological environment of surrounding area, belongs to the engineering structure of resource-conserving and environment amity.
Description of drawings
Fig. 1 is the drawing in side sectional elevation of the utility model,
Fig. 2 is the bottom plan view of the utility model,
Fig. 3 is the deck plan of the utility model,
Fig. 4 is the stereogram of the utility model,
Fig. 5 is for after the utility model implements, the sectional side view of overall region,
Fig. 6 is for enclosing and cultivating the embankment constructional drawing,
Label declaration
1 base plate, 2 side plates, 3 longitudinal bulkheads, 4 decks, 5 deck girders, 6 stringer girders, 7 end stringers, 8 bilge angle stringers, 9 toe boards, 10 skirtboards, 11 connect base, 12 counterforts, 13 top boards, 14 buoyancy tanks, 15 front sheets, 16 transverse bulkheads, 21 band drains, 22 sand cushions, 23 geotextiles, 24 packed rubble inverted filters, 25 barged-in fills, 26 slabstone bed courses, 27 placed rockfill bank protections, 28 road surfaces, 29 rubble inverted filters, 30 stone pavings.
The specific embodiment
Shown in Fig. 1~4: the structure of the utility model is following: it is made up of buoyancy tank and the counterfort 12 that is fixed on buoyancy tank 14 upper surfaces; Described buoyancy tank is the side plate 2 by forward and backward; Deck 4 and soffit that left and right side front sheet 15, upper surface are provided with are provided with the body structure that base plate 1 is surrounded; In casing, be provided with at least one row longitudinal bulkhead parallel 3 with side plate; Described longitudinal bulkhead upper end connects the deck, the lower end connects base plate, in casing, also is provided with at least one row transverse bulkhead parallel with front sheet 16, and described transverse bulkhead upper end connects the deck, the lower end connects base plate; Below tank floor, also be provided with crisscross protruding skirtboard 10 downwards, below four sides of casing, be provided with the toe board 9 that extends laterally; One side is provided with the connection base 11 parallel with side plate in the front of pontoon deck, on base, is provided with counterfort 12, and the top of counterfort is provided with top board 13.Wherein toe board and skirtboard can be used for strengthening the ground ability of grabbing of the utility model, improve the stability of the utility model.
Also be provided with strengthening structure at box house; Wherein also be provided with and be used to strengthen the bilge angle stringers 8 that is connected in the base plate and the interior angle junction of side plate; Be provided with in the interior angle junction of deck and side plate and be used to strengthen the stringer girder 6 that is connected; Also be provided with the interior angle junction of longitudinal bulkhead at base plate and be used to strengthen the end stringers 7 that is connected, also be provided with the interior angle junction of longitudinal bulkhead at base plate and be used to strengthen the deck girder that is connected.Be used for strengthening the annexation between each sheet material, improve the stability of casing.
Described counterfort is the grooved counterfort, and the cross section of counterfort is a undaform, and crest and trough are straight line.
Buoyancy tank is the board-like structure of steel bar concrete, and promptly side plate, front sheet, deck, base plate, longitudinal bulkhead, transverse bulkhead are the inner concrete plate that is provided with reinforcing bar.
On clamping plate or side plate, also be provided with the limbers, the independent tank body in the buoyancy tank respectively is provided with a limbers.In order to regulate buoyancy tank weight, can be provided with the limbers of water-in and water-out at the buoyancy tank sidewall.
The utility model can design the buoyancy tank principal dimensions as the case may be in the process of design; Hydrogeologic data and ambient conditions according to embankment or revetment position; And the end absolute altitude of the inboard determined crest level of actual instructions for use, interior backfill elevation and levee body; By different treatment of soft foundation modes, after global stability analysis calculates, confirm the height and the width of buoyancy tank.The length of buoyancy tank is then according to the actual needs of engineering construction project, and after longitudinal strength is adjusted, confirms.Generally be advisable to be no more than 100m, the deadweight of buoyancy tank generally is controlled in the 1500t.
The formation of buoyancy tank: in general: buoyancy tank is the board-like structure of steel bar concrete, each monomer in the buoyancy tank wherein, and promptly side plate, front sheet, deck, base plate, longitudinal bulkhead, transverse bulkhead are the inner concrete plate that is provided with reinforcing bar.After each plate spliced, at integral constructing skirtboard, toe board etc.Concrete seam through the scene pouring between the segmentation of each plate fuses.For giving full play to the mechanical property of structural meterials, reduce the steel consumption, can carry out reasonable arrangement of reinforcement according to the suffered load of different parts, confirm the inside and outside protective layer thickness of each member of buoyancy tank by life requirement.Wherein about the segmentation seam, in general the segmentation seam of buoyancy tank all is arranged in the bulkhead position, and planed joint and vertical joint are united two into one, and the segmentation reserving rib is connected at seaming position, behind the formwork, and cast-in-place chiltern concrete; The buoyancy tank that forms like this is the most firm.In the polycrystalline substance: the buoyancy tank bottom fuses with skirtboard and toe board, and the size of skirtboard and toe board and arrangement of reinforcement move with the stressing conditions of overturning or slip resistance analysis according to antiskid to be confirmed through calculating.
Flat section---the integral constructing method is built in building berth, dock or cofferdam in the buoyancy tank employing, can adopt floating method, slope gravity, lift-on/lift-off system or air bag launching, the transportation by driving location.
Flute profile counterfort structure: flute profile counterfort plane cross section is the symmetric form structure, is divided into a flat section by a flute profile width, and the segmentation seam is arranged in the middle part of wainscot.
The flute profile counterfort fuses through connecting base and buoyancy tank basis, and the top is provided with the Cast-in-place concrete top board.The compound action of soil pressure, water pressure, wind-force and wave force when the structural strength of flute profile counterfort can be born different tidal level.
The use of buoyancy tank: buoyancy tank adopts the transportation by driving location.Behind the water, when high-tide level, drag toward assigned address under the buoyancy tank with tugboat or power ship, the sinking of pouring water, and to doing the soft base enforcement associating loading precompressed that discharging consolidation is handled.
The pouring of the hoisting and locating of flute profile counterfort, the processing of vertical joint and connection base concrete can be carried out when pontoon deck surfaces.
The sand resource situation of the visual construction area of backfill of rear land-based area is selected for use, is most economical to adopt high-power cutter suction dredger from the marine site of offshore certain distance, in embankment or revetment, to implement reclamation by pumping filling.But the layering of reclamation by pumping filling piecemeal is carried out, and the interim separation levee of buoyancy tank also capable of using during as dredge fill carries out block construction, also can play floating displacement after the completion of local plot and use.Also can separation levee be built up the pipe network gallery newly made in the plot or the zone canal that drains off floodwaters, to obtain the overall economic efficiency of engineering construction.
This patent adopts the prefabricated reinforced concrete buoyancy tank to do the basis, has reduced the deadweight of agent structure material consumption amount and levee body, has improved resistance to overturning; Inject Ballast Water in the buoyancy tank, can quicken the discharging consolidation of soft base; Buoyancy tank communicates with outside water, can overcome uplift pressure, but vacant state transportation by driving location also can be played floating displacement at any time and installed.On the skirtboard of buoyancy tank below, be provided with vacuum absorption device.Behind the buoyancy tank location, empty G&W is discharged from vacuum absorption device, and the buoyancy tank basal surface is close on the soft basic unit face, and leveling automatically, increases vacuum adsorption force, and the antiskid that has effectively improved levee body moves and resistance to capsizing.Toe board before and after the buoyancy tank bottom has increased the levee body bottom width, reduces the pressure of levee body to the basis, increases the overturning or slip resistance analysis arm of force, has improved factor of safety against overturning.
The prefabricated assembled grooved counterfort of steel bar concrete belongs to lightweight structures, can bidirectional stress, have certain wave absorbing function again, and aesthetic in appearance, manufacturability is strong.Connect base through cast-in-situ reinforced concrete and just can fuse with the buoyancy tank basis,, high consistent for the settlement difference between each buoyancy tank to keep top mark then through the adjustment of Cast-in-place concrete substructure height.
After backfill or reclamation by pumping filling form land-based area in the dike, combine together, become gravity embankment and revetment, behind the fill block stone throwing bank protection of the outside, can make levee body more reliable and more stable with overall structure grooved counterfort formula revetment or embankment.
Shown in Fig. 5~6: below be a kind of whole step scheme summary about the utility model:
The scheme step comprises: (1) is preset plastic draining board 21 in the appointed area; (2) the control buoyancy tank sinks down into assigned address; And skirtboard is absorbed in the sand cushion 22; (3), sand cushion surperficial successively lay geotextiles 23 and packed rubble inverted filter 24 inboard at buoyancy tank; (4) on packed rubble inverted filter, dose barged-in fill 25 at last; (5) in the buoyancy tank outside, sand cushion surface once-paving geotextiles, slabstone bed course 26, placed rockfill bank protection 27, geotextiles, rubble inverted filter 29 and stone paving 30 are being laid successively in buoyancy tank inboard, the surperficial straight highway section road surface pavement 28 of barged-in fill, the surface tilt zone of barged-in fill in (6).

Claims (5)

1. overall structure grooved counterfort formula revetment and embankment; It is characterized in that: it is made up of buoyancy tank and the counterfort (12) that is fixed on buoyancy tank (14) upper surface; Described buoyancy tank is the side plate (2) by forward and backward; Deck (4) and soffit that left and right side front sheet (15), upper surface are provided with are provided with the body structure that base plate (1) is surrounded, and in casing, are provided with at least one row longitudinal bulkhead parallel with side plate (3), and described longitudinal bulkhead upper end connects the deck, the lower end connects base plate; In casing, also be provided with at least one row transverse bulkhead parallel with front sheet (16), described transverse bulkhead upper end connects the deck, the lower end connects base plate; Below tank floor, also be provided with crisscross protruding skirtboard (10) downwards, below four sides of casing, be provided with the toe board (9) that extends laterally; One side is provided with the connection base (11) parallel with side plate in the front of pontoon deck, on base, is provided with counterfort (12), and the top of counterfort is provided with top board (13).
2. overall structure grooved counterfort formula revetment according to claim 1 and embankment; It is characterized in that: also be provided with strengthening structure at box house; Wherein also be provided with and be used to strengthen the bilge angle stringers (8) that is connected in the base plate and the interior angle junction of side plate; Be provided with in the interior angle junction of deck and side plate and be used to strengthen the stringer girder (6) that is connected; Also be provided with in the base plate and the interior angle junction of longitudinal bulkhead and be used to strengthen the end stringers (7) that is connected, also be provided with the interior angle junction of longitudinal bulkhead at base plate and be used to strengthen the deck girder that is connected.
3. overall structure grooved counterfort formula revetment according to claim 1 and embankment is characterized in that: described counterfort is the grooved counterfort, and the cross section of counterfort is a undaform, and crest and trough are straight line.
4. overall structure grooved counterfort formula revetment according to claim 1 and embankment is characterized in that: buoyancy tank is the board-like structure of steel bar concrete, and promptly side plate, front sheet, deck, base plate, longitudinal bulkhead, transverse bulkhead are the inner concrete plate that is provided with reinforcing bar.
5. overall structure grooved counterfort formula revetment according to claim 1 and embankment is characterized in that: on clamping plate or side plate, also be provided with the limbers, the independent tank body in the buoyancy tank respectively is provided with a limbers.
CN2011202847616U 2011-08-05 2011-08-05 Integral groove counterfort type revetment and causeway Expired - Fee Related CN202208905U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202847616U CN202208905U (en) 2011-08-05 2011-08-05 Integral groove counterfort type revetment and causeway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202847616U CN202208905U (en) 2011-08-05 2011-08-05 Integral groove counterfort type revetment and causeway

Publications (1)

Publication Number Publication Date
CN202208905U true CN202208905U (en) 2012-05-02

Family

ID=45988457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202847616U Expired - Fee Related CN202208905U (en) 2011-08-05 2011-08-05 Integral groove counterfort type revetment and causeway

Country Status (1)

Country Link
CN (1) CN202208905U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110857555A (en) * 2018-08-23 2020-03-03 中铁第五勘察设计院集团有限公司 Wharf buoyancy tank leveling structure with balance weight and wharf buoyancy tank

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110857555A (en) * 2018-08-23 2020-03-03 中铁第五勘察设计院集团有限公司 Wharf buoyancy tank leveling structure with balance weight and wharf buoyancy tank

Similar Documents

Publication Publication Date Title
CN103321241B (en) Deep water open type combination foundation harbour and construction method thereof
CN105672199B (en) A kind of dock structure and its construction method suitable for silt coast
CN111502725B (en) Artificial island type middle well structure of submarine tunneling tunnel
CN103806407B (en) Pile-bucket integrated wharf structure and construction method thereof
CN102926350A (en) Floating transport and towing dock module and construction method thereof
CN113047215B (en) High stake pier structure of medium plate stake
CN101899824A (en) Method for building harbor wharf based on soft soil
CN202899083U (en) Pile-bucket combined wharf structure
Smith Types of marine concrete structures
CN111335263B (en) Method for building artificial island
CN210368822U (en) Weighing unloading type counterfort structure
CN202626934U (en) Gravity wharf built on silty foundation
CN106149624B (en) A kind of gravity type quay and its construction method suitable for roadbed of alluvial silt
CN202208905U (en) Integral groove counterfort type revetment and causeway
JP7389893B2 (en) Offshore structures and construction methods
Bittner et al. Design and construction of the Sutong Bridge foundations
CN204608701U (en) A kind of gravity type quay being applicable to roadbed of alluvial silt
CN111485579B (en) Bridge-tunnel transition conversion structure between suspension tunnel and deepwater suspension bridge
CN103806409A (en) Milling forming system of gravity wharf foundation bed and construction method for gravity wharf structure
CN113585168A (en) Sheet pile shore-connection type high-pile wharf structure suitable for deep peat soil soft foundation and construction method
CN207228044U (en) A kind of low tide Cha Gang areas bulkhead wall caisson wharf structure
CN201883413U (en) Combined concrete rectangular open caisson harbor basin
CN106677216A (en) Deep underwater transportation corridor structures and construction method thereof
CN214993753U (en) Ship lock chamber grid type ground connecting wall structure suitable for cohesive soil foundation
CN216809751U (en) Transmission plate structure for protecting dike penetrating structure below coastal river road

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120502

Termination date: 20190805

CF01 Termination of patent right due to non-payment of annual fee