Deck hanging basket main truss shifter Download PDFInfo
- Publication number
- CN202194078U CN202194078U CN 201120262968 CN201120262968U CN202194078U CN 202194078 U CN202194078 U CN 202194078U CN 201120262968 CN201120262968 CN 201120262968 CN 201120262968 U CN201120262968 U CN 201120262968U CN 202194078 U CN202194078 U CN 202194078U
- Authority
- CN
- China
- Prior art keywords
- truss
- longeron
- wheel
- rear roller
- cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a deck hanging basket main truss shifter comprising a truss longitudinal beam, wherein a front roller is arranged on the lower surface of the middle part of the truss longitudinal beam, contacts with a beam surface, and is arranged in a wheel sleeve frame, a wheel sleeve is directly placed below the truss longitudinal beam, the tail of the truss longitudinal beam is provided with a rear roller, the rear roller on the longitudinal beam is arranged in the wheel sleeve, and the wheel sleeve is anchored with a beam body by using a finish rolling deformed steel bar. In the utility model, the traveling process is completed by alternatively moving the position of the rear roller, and the deck hanging basket main truss shifter is simple, convenient and fast in operation, and greatly shortens the construction period needed for traveling.
Description
Technical field
The utility model relates to the suspended basket mode, a kind of mobile device that is applied to deck type main truss cradle frame of more specifically saying so.
Background technology
Along with the application of technological progress and new material, the reinforced concrete continuous beam of large span is extensively applied in the bridge engineering in crossing highway, railway, river.In the work progress that continuous beam cantilever is built, Hanging Basket is as major bearing structures, and Hanging Basket mode out of shape has produced decisive role to construction.There is more problem in traditional Hanging Basket job practices out of shape:
make the attachment rail difficulty at the beam section end face of having built, consume man-hour;
consume material is more, cost of idleness;
track laying process is complicated; Also will handle the beam face, traveling process operation is loaded down with trivial details; Be unfavorable for the fine setting of traveling in the work progress after
track is fixing;
orbit occupancy beam face confined space is big, removes inconvenient.
The utility model content
It is complicated that the utility model provides a kind of solution to install, and the traveling process is loaded down with trivial details, the deck type main truss cradle frame mobile device of technical problems such as traveling regulation and control inconvenience.
The utility model technical solution problem provides following scheme:
A kind of deck type main truss cradle frame mobile device comprises the truss longeron, and the mid portion soffit of said truss longeron is provided with front wheel; Said front wheel contacts with the beam face, is installed in the wheel cover frame, and the said cover of taking turns is placed directly under the truss longeron; The afterbody of said truss longeron is provided with rear roller; Said rear roller is installed within the wheel cover on longeron, and said the wheel applied mechanically fining twisted steel and the anchoring of beam body.
Said front wheel is one group of steel cast wheel, totally 4 groups of two rows, and rear roller is a steel casting rotatingcylindrical drum, the rectangle jacket casing that the wheel cover surrounds for steel plate.
Said front wheel contacts with the beam face, and it is taken turns cover and contacts with truss longeron soffit; Rear roller places on the truss longeron and with truss longeron surface and contacts, and it takes turns cover through fining twisted steel and the anchoring of beam body.
Said front and rear rolling wheel is arranged symmetrically in truss longeron dual-side, arranges 1 group of front wheel and 1 group of rear roller along per pass truss longeron.
Compare with the wheel track traveling, the utility model beneficial effect is embodied in:
1. the utility model does not have track, and is simple in structure, easy construction, reduction of erection time.
2. the utility model does not have the track economical with materials, has practiced thrift cost.
3, the utility model relies on force of rolling friction that Hanging Basket is moved, and makes to move to be more prone to.
4, the utility model does not have track, contacts with the beam face and has only front wheel, need not the beam face to be handled conserve space.
5, the utility model roller does not receive horizontal restrain, the conveniently regulating and controlling moving direction.
6, the utility model adopts the method that alternately moves the rear roller position to accomplish the traveling process, and is simple to operate, convenient, shortens the required duration of traveling greatly.
Description of drawings
Fig. 1 is the utility model front and rear rolling wheel plan-position figure.
Fig. 2 is the vertical arrangement diagram of the utility model front and rear rolling wheel.
The specific embodiment
Referring to accompanying drawing, a kind of deck type main truss cradle frame mobile device comprises truss longeron 1; The mid portion soffit of said truss longeron 1 is provided with front wheel 2, and said front wheel 2 contacts with beam face 3, is installed in wheel cover 4 frames; The said cover 4 of taking turns is placed directly in the truss longeron 1 time, and the afterbody of said truss longeron 1 is provided with rear roller 5, and said rear roller 5 is on longeron 1; Be installed within the wheel cover 4 the said cover 4 usefulness fining twisted steels 6 and 3 anchorings of beam body of taking turns.
Said front wheel 2 is one group of steel cast wheel, totally 4 groups of two rows, and rear roller 5 is a steel casting rotatingcylindrical drum, the rectangle jacket casing that wheel cover 4 surrounds for steel plate.
Said front wheel 2 contacts with beam face 3, and it is taken turns cover 4 and contacts with truss longeron 1 soffit; Rear roller 5 places on the truss longeron 1 and with truss longeron 1 surface and contacts, and it takes turns cover 4 through fining twisted steel 6 and 3 anchorings of beam body.
Said front and rear rolling wheel 2 is arranged symmetrically in truss longeron 1 dual-side, arranges 1 group of front wheel 2 and 1 group of rear roller 5 along per pass truss longeron 1.
Claims (4)
1. a deck type main truss cradle frame mobile device comprises the truss longeron, and it is characterized in that: the mid portion soffit of said truss longeron is provided with front wheel; Said front wheel contacts with the beam face, is installed in the wheel cover frame, and the said cover of taking turns is placed directly under the truss longeron; The afterbody of said truss longeron is provided with rear roller; Said rear roller is installed within the wheel cover on longeron, and said the wheel applied mechanically fining twisted steel and the anchoring of beam body.
2. according to the said deck type main truss cradle of claim 1 frame mobile device, it is characterized in that: said front wheel is one group of steel cast wheel, totally 4 groups of two rows, and rear roller is a steel casting rotatingcylindrical drum, the rectangle jacket casing that the wheel cover surrounds for steel plate.
3. according to the said deck type main truss cradle of claim 1 frame mobile device, it is characterized in that: said front wheel contacts with the beam face, and it is taken turns cover and contacts with truss longeron soffit; Rear roller places on the truss longeron and with truss longeron surface and contacts, and it takes turns cover through fining twisted steel and the anchoring of beam body.
4. according to the said deck type main truss cradle of claim 1 frame mobile device, it is characterized in that: said front and rear rolling wheel is arranged symmetrically in truss longeron dual-side, arranges 1 group of front wheel and 1 group of rear roller along per pass truss longeron.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120262968 CN202194078U (en) | 2011-07-25 | 2011-07-25 | Deck hanging basket main truss shifter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120262968 CN202194078U (en) | 2011-07-25 | 2011-07-25 | Deck hanging basket main truss shifter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202194078U true CN202194078U (en) | 2012-04-18 |
Family
ID=45948997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120262968 Expired - Fee Related CN202194078U (en) | 2011-07-25 | 2011-07-25 | Deck hanging basket main truss shifter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202194078U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046477A (en) * | 2012-12-31 | 2013-04-17 | 中铁十局集团第二工程有限公司 | Traveling-rail-free type triangular hanging basket traveling construction method |
CN105839550A (en) * | 2016-05-23 | 2016-08-10 | 中交第公路工程局有限公司 | Oppressive traveling mechanism used for cantilever hanging basket and cantilever hanging basket |
CN108103957A (en) * | 2017-12-27 | 2018-06-01 | 滨州永昇重工有限公司 | A kind of hydraulic pressure upper rail type triangle hanging basket structure |
CN110184922A (en) * | 2019-04-29 | 2019-08-30 | 中建市政工程有限公司 | A kind of crawler self walks Hanging Basket and its construction method |
CN111042004A (en) * | 2019-12-06 | 2020-04-21 | 中铁广州工程局集团有限公司 | Hanging basket track beam traveling method |
CN112523110A (en) * | 2020-11-06 | 2021-03-19 | 江苏镇江路桥工程有限公司 | Suspended casting construction hanging basket suspension system convenient to move |
-
2011
- 2011-07-25 CN CN 201120262968 patent/CN202194078U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103046477A (en) * | 2012-12-31 | 2013-04-17 | 中铁十局集团第二工程有限公司 | Traveling-rail-free type triangular hanging basket traveling construction method |
CN105839550A (en) * | 2016-05-23 | 2016-08-10 | 中交第公路工程局有限公司 | Oppressive traveling mechanism used for cantilever hanging basket and cantilever hanging basket |
CN108103957A (en) * | 2017-12-27 | 2018-06-01 | 滨州永昇重工有限公司 | A kind of hydraulic pressure upper rail type triangle hanging basket structure |
CN110184922A (en) * | 2019-04-29 | 2019-08-30 | 中建市政工程有限公司 | A kind of crawler self walks Hanging Basket and its construction method |
CN111042004A (en) * | 2019-12-06 | 2020-04-21 | 中铁广州工程局集团有限公司 | Hanging basket track beam traveling method |
CN112523110A (en) * | 2020-11-06 | 2021-03-19 | 江苏镇江路桥工程有限公司 | Suspended casting construction hanging basket suspension system convenient to move |
CN112523110B (en) * | 2020-11-06 | 2022-07-12 | 江苏镇江路桥工程有限公司 | Suspended casting construction hanging basket suspension system convenient to move |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202194078U (en) | Deck hanging basket main truss shifter | |
CN204690605U (en) | The self-propelled triangular truss hanging basket of large span beam bridge | |
CN102352597A (en) | Prestressed ultrahigh-performance concrete continuous box girder bridge and construction method thereof | |
CN205894099U (en) | Be applied to underground pipe gallery's portable sliding template device | |
CN102418534B (en) | Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame | |
CN105178200A (en) | Construction method of cable-stayed combined support for construction of first segment of suspended-pouring arch bridge | |
CN202194071U (en) | Adjustable inner die | |
CN201952737U (en) | Stay rope hanging basket suitable for wide double plane cable stayed bridge | |
CN103161298B (en) | Large-area concrete ground preparation method | |
CN204112239U (en) | Across the rotary body device of the little bridge beam of high ferro on a kind of low-angle | |
CN103806374B (en) | The overall track erection supplying system of assembly type steel bridge on highway and erection push technique | |
CN202228087U (en) | Split-type movable formwork device for tunnel partition wall | |
CN202323669U (en) | Prestressed ultrahigh-performance concrete continuous box girder bridge | |
CN107974951A (en) | A kind of light-duty trackless Hanging Basket of bridge | |
CN101672012B (en) | Trackless right-handed wheel cantilever running technology | |
CN202766985U (en) | Construction device for variable cross-section cantilever box girder | |
CN201972099U (en) | Through type hanging basket in bridge construction | |
CN201458544U (en) | Carrying pole for mounting component | |
CN204024063U (en) | A kind of sand pond dustproof construction of job site | |
CN101672017A (en) | Electric hanging bracket with traveling right-handed wheel | |
CN101698989B (en) | Hydralic right hand thread wheel cradle without balance weight | |
CN202415024U (en) | Crane capable of climbing over beam-arch, climbing up slope and climbing down slope | |
CN214939408U (en) | Device for self-pushing and walking of cradle track and main truss | |
CN204080651U (en) | A kind of Diamond-Shape Form Traveler main couple walking system for road and bridge construction | |
CN204919371U (en) | Hang water a festival section construction on arched bridge draw sectional shelf -unit device to one side |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120418 Termination date: 20160725 |