CN202187366U - Plastic inspection well base as well as combined inspection well thereof - Google Patents

Plastic inspection well base as well as combined inspection well thereof Download PDF

Info

Publication number
CN202187366U
CN202187366U CN2011202912121U CN201120291212U CN202187366U CN 202187366 U CN202187366 U CN 202187366U CN 2011202912121 U CN2011202912121 U CN 2011202912121U CN 201120291212 U CN201120291212 U CN 201120291212U CN 202187366 U CN202187366 U CN 202187366U
Authority
CN
China
Prior art keywords
well
base
shaft
well body
pit shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202912121U
Other languages
Chinese (zh)
Inventor
沈利川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING HIMALAYA TECHNOLOGY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202912121U priority Critical patent/CN202187366U/en
Application granted granted Critical
Publication of CN202187366U publication Critical patent/CN202187366U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a plastic inspection well base as well as a combined inspection well of the plastic inspection well, relates to an inspection well which is used in underground pipe network facilities and comprises a base, a well shaft and a closed-up well body, wherein the base is connected with one end of the well shaft, the other end of the well shaft is connected with the closed-up well body, and the base is provided with at least one support frame; the closed-up well body takes the shape of an inverted funnel, and the big mouth end of the closed-up well body is welded with the well shaft; the well shaft is a PE (polyethylene) double-deck twisted pipe; and sealing elements are arranged at the connection places of the well shaft and the base respectively. In the utility mode, the split type plastic inspection well is adopted, and the inspection well is convenient to construct and install on site, is easy to transport and has good connection sealing performance and wide use range; the well shaft adopts the twisted pipe, so that the strength of the well body is enhanced; the connecting places are sealed by seal rings or through welding, so that the inspection well is reliable to connect, can prevent leakage so as to facilitate environmental protection and is convenient for workers to go up and down during construction and overhaul so as to ensure safety.

Description

Plastic inspection well base and combined inspection shaft thereof
Technical field
The utility model relates to the manhole in a kind of network of underground facility, particularly a kind of combined plastic manhole.
Background technology
In the urban construction process; Manhole in the underground piping system is claimed piping shaft, inspection shaft again, lays the manhole of pipeline etc. like sewer, industrial and mineral sewage vent line, underground communication, cable, is the important component part of urban construction; Especially for the manhole in the sewer pipeline; Generally all be at present at underground with brick or cement masonry well body to ground, a well lid on its upper end cover has opening at the well body side surface and is used for duct coupling; Its existing problems are long construction periods; Loosely organized, anti-leakage property is poor, be easy to generate the shrub weeds, the mediation the not easy current that make not smooth; And there is serious seepage in the connection place of pipeline and well body (particularly traditional cement well and plastic pipe is connected), can cause the secondary pollution of surrounding environment; Not only time-consuming, the effort of the manhole of this mode, and poor sealing performance, infiltration causes to phreatic pollution with to environment damage easily.Prefabricated cement well is also arranged, though it can dwindle the pipeline construction cycle, structural element heavily transports the installation cost height.The volume of this manhole is comparatively single, can't be difficult to satisfy on-the-spot installation requirements according to its volume size of on-the-spot needs adjustment.
Therefore need a kind of site operation easy for installation, be easy to transportation, connect favorable sealing property, scope of application manhole widely.
The utility model content
In view of this, the utility model technical problem to be solved provide a kind of site operation easy for installation, be easy to transportation, connect favorable sealing property, scope of application manhole widely.
The utility model is realized through following technical scheme:
The plastic inspection well base that the utility model provides comprises base body and the well body birdsmouth of being located at the base body, and said base body bottom is provided with at least one bracing frame.
The combined inspection shaft that the utility model provides comprises base, pit shaft and closing in well body, and said base is connected with an end of pit shaft, and the other end of said pit shaft is connected with closing in well body.
Further, said base comprises base body and the well body birdsmouth of being located at the base body, and said base body bottom is provided with at least one bracing frame;
Further, said closing in well body is the upside down funnel shape, and big mouth one end and the pit shaft of said closing in well body link together;
Further, said pit shaft is PE binary wall twisting and pipe or PE double-wall corrugated pipe;
Further, osculum one end of said closing in well body also is provided with well lid;
Further, the connected mode of the connected mode of described pit shaft and base, pit shaft and closing in well body is respectively welding;
Further, the connected mode of the connected mode of described pit shaft and base, pit shaft and closing in well body is respectively grafting;
Further, the junction of described pit shaft and base, pit shaft and closing in well body is respectively arranged with seal member.
The beneficial effect of the utility model is: the utility model adopts split type plastic inspection well; Site operation is easy for installation, be easy to transportation, connect favorable sealing property, scope of application manhole widely; Adopt the pit shaft of wind pipe to strengthen the intensity of well body, adopt welding or the sealing ring place that is tightly connected, make manhole connect reliably, prevent that seepage is beneficial to environmental protection; About the convenient construction maintenance worker, guaranteed safety again.
Other advantages, target and the characteristic of the utility model will be set forth in manual subsequently to a certain extent; And to a certain extent; Based on being conspicuous to those skilled in the art, perhaps can from the practice of the utility model, obtain instruction to investigating of hereinafter.The target of the utility model and other advantages can realize and obtain through following manual and claims.
Description of drawings
For the purpose, technical scheme and the advantage that make the utility model is clearer, will combine accompanying drawing that the utility model is done further to describe in detail below, wherein:
Fig. 1 is the structure chart of the closing in well body of combined inspection shaft;
Fig. 2 is the structure chart of the base of combined inspection shaft;
Fig. 3 is the binary wall twisting and pipe overall structure figure of combined inspection shaft;
Fig. 4 is the double-wall corrugated pipe overall structure figure of combined inspection shaft.
The specific embodiment
Below will be with reference to accompanying drawing, the preferred embodiment of the utility model is carried out detailed description.Should be appreciated that preferred embodiment has been merely explanation the utility model, rather than in order to limit the protection domain of the utility model.
Fig. 1 is the structure chart of the closing in well body of combined inspection shaft; Fig. 2 is the structure chart of the base of combined inspection shaft; Fig. 3 is the binary wall twisting and pipe overall structure figure of combined inspection shaft; Fig. 4 is the double-wall corrugated pipe overall structure figure of combined inspection shaft; As shown in the figure: the plastic inspection well base that the utility model provides; Comprise base body and the well body birdsmouth of being located at the base body, said base body bottom is provided with at least one bracing frame 4.
The combined inspection shaft that the utility model provides comprises base 1, pit shaft 2 and closing in well body 3, and said base 1 is connected with an end of pit shaft 2, and the other end of said pit shaft 2 is connected with closing in well body 3.
As the further improvement of the foregoing description, said base 1 comprises base body and the well body birdsmouth of being located at the base body, and said base body bottom is provided with at least one bracing frame 4.
As the further improvement of the foregoing description, said closing in well body 3 is the upside down funnel shape, and big mouth one end and the pit shaft of said closing in well body weld together.
As the further improvement of the foregoing description, said pit shaft 2 is PE binary wall twisting and pipe or PE double-wall corrugated pipe 21.
As the further improvement of the foregoing description, osculum one end of said closing in well body 3 also is provided with well lid.
As the further improvement of the foregoing description, described pit shaft 2 is respectively welding with connected mode, the pit shaft 2 of base 1 with the connected mode of closing in well body 3.
As the further improvement of the foregoing description, described pit shaft 2 is respectively grafting with connected mode, the pit shaft 2 of base 1 with the connected mode of closing in well body 3.
As the further improvement of the foregoing description, described pit shaft 2 is respectively arranged with seal member with connected mode, the pit shaft 2 of base 1 with the junction of closing in well body 3.
Explanation is at last; Above embodiment is only unrestricted in order to the technical scheme of explanation the utility model; Although the preferred embodiment through with reference to the utility model is described the utility model; But those of ordinary skill in the art should be appreciated that and can make various changes to it in form with on the details, and the spirit and the scope of the utility model that does not depart from appended claims and limited.

Claims (9)

1. plastic inspection well base is characterized in that: comprise base body and the well body birdsmouth of being located at the base body, said base body bottom is provided with at least one bracing frame (4).
2. the combined inspection shaft that base according to claim 1 is processed; It is characterized in that: comprise base (1), pit shaft (2) and closing in well body (3); Said base (1) is connected with an end of pit shaft (2), and the other end of said pit shaft (2) is connected with closing in well body (3).
3. combined inspection shaft according to claim 2 is characterized in that: said base (1) comprises base body and the well body birdsmouth of being located at the base body, and said base body bottom is provided with at least one bracing frame (4).
4. combined inspection shaft according to claim 3 is characterized in that: said closing in well body (3) is the upside down funnel shape, and big mouth one end and the pit shaft of said closing in well body link together.
5. combined inspection shaft according to claim 4 is characterized in that: said pit shaft (2) is PE binary wall twisting and pipe or PE double-wall corrugated pipe.
6. combined inspection shaft according to claim 5 is characterized in that: osculum one end of said closing in well body (3) also is provided with well lid.
7. combined inspection shaft according to claim 6 is characterized in that: described pit shaft (2) is respectively welding with connected mode, the pit shaft (2) of base (1) with the connected mode of closing in well body (3).
8. combined inspection shaft according to claim 7 is characterized in that: described pit shaft (2) is respectively grafting with connected mode, the pit shaft (2) of base (1) with the connected mode of closing in well body (3).
9. combined inspection shaft according to claim 8 is characterized in that: described pit shaft (2) is respectively arranged with seal member with base (1), pit shaft (2) with the junction of closing in well body (3).
CN2011202912121U 2011-08-11 2011-08-11 Plastic inspection well base as well as combined inspection well thereof Expired - Fee Related CN202187366U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202912121U CN202187366U (en) 2011-08-11 2011-08-11 Plastic inspection well base as well as combined inspection well thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202912121U CN202187366U (en) 2011-08-11 2011-08-11 Plastic inspection well base as well as combined inspection well thereof

Publications (1)

Publication Number Publication Date
CN202187366U true CN202187366U (en) 2012-04-11

Family

ID=45918826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202912121U Expired - Fee Related CN202187366U (en) 2011-08-11 2011-08-11 Plastic inspection well base as well as combined inspection well thereof

Country Status (1)

Country Link
CN (1) CN202187366U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532878A (en) * 2014-12-18 2015-04-22 王一峰 Plastic inspection well
CN107447785A (en) * 2017-09-15 2017-12-08 齐建军 A kind of plastic spliced inspection shaft of light steel skeleton
RU179010U1 (en) * 2017-11-14 2018-04-25 Федеральное государственное бюджетное образовательное учрежедение высшего профессионального образования "Юго-Западный" государственный университет" (ЮЗГУ Engineering plastic well

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532878A (en) * 2014-12-18 2015-04-22 王一峰 Plastic inspection well
CN107447785A (en) * 2017-09-15 2017-12-08 齐建军 A kind of plastic spliced inspection shaft of light steel skeleton
RU179010U1 (en) * 2017-11-14 2018-04-25 Федеральное государственное бюджетное образовательное учрежедение высшего профессионального образования "Юго-Западный" государственный университет" (ЮЗГУ Engineering plastic well

Similar Documents

Publication Publication Date Title
CN202992512U (en) Pipeline suppressing and plugging device
CN202187366U (en) Plastic inspection well base as well as combined inspection well thereof
CN102518199B (en) Hermetic connecting method for bell mouth of plastic inspection well
CN203746978U (en) Flow battery system suitable for outdoor placement
CN203286163U (en) Combined concrete pipe with lining pipe
CN201502826U (en) Spigot-and-socket type fusing plastic pipeline
CN2861286Y (en) Combined type inspection well
CN202032221U (en) Insertion type pipeline joint
CN100540970C (en) The plastic winding structure wall bell-and-spigot pipe
CN201981553U (en) Plastic pipeline type inspection shaft
CN100410457C (en) Combined pipe fitting inspection well
CN205894519U (en) Structure of waterproof parapet of roofing stainless steel and open drain combination
CN217175793U (en) Movable assembly type box column grouting device
CN211649434U (en) Internal stop type rubber ring butt joint structure of winding pipe
CN202031163U (en) Inspection well with plug-in sleeve
CN202401562U (en) Sealing connecting structure for bell end of plastic inspection shaft
CN214090253U (en) Urban municipal drainage pipeline inspection shaft structure
CN205048059U (en) External seal formula PE pipe connection
CN201343535Y (en) Methane tank
CN203284877U (en) Leakage-proof inner container of underground pipe network inspection well
CN201770997U (en) Inspection well branch pipe joint structure
CN207453049U (en) For the rain sewage diversion system of hazardous waste security landfill
CN205677031U (en) A kind of sewage piece well
CN201496712U (en) Connecting piece of spiral tube
CN206875017U (en) A kind of emergent closure shunting device of petroleum pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Chongqing Wanfeng Plastic Co., Ltd.

Assignor: Shen Lichuan

Contract record no.: 2013500000056

Denomination of utility model: Plastic inspection well base as well as combined inspection well thereof

Granted publication date: 20120411

License type: Exclusive License

Record date: 20130801

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
EC01 Cancellation of recordation of patent licensing contract

Assignee: Chongqing Wanfeng Plastic Co., Ltd.

Assignor: Shen Lichuan

Contract record no.: 2013500000056

Date of cancellation: 20140701

EE01 Entry into force of recordation of patent licensing contract

Assignee: Chongqing TL Industrial Co., Ltd.

Assignor: Shen Lichuan

Contract record no.: 2014500000033

Denomination of utility model: Plastic inspection well base as well as combined inspection well thereof

Granted publication date: 20120411

License type: Exclusive License

Record date: 20140702

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
ASS Succession or assignment of patent right

Owner name: CHONGQING HIMALAYAN TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: SHEN LICHUAN

Effective date: 20150728

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150728

Address after: 1 No. 400000, 1 Asia Pacific Road, Nan'an District, Chongqing, 5-18

Patentee after: Chongqing Himalaya Technology Co., Ltd.

Address before: 400060, Chongqing City, four kilometers south shore, Wan Kai Metro will be on the 20 floor, block B

Patentee before: Shen Lichuan

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120411

Termination date: 20150811

EXPY Termination of patent right or utility model