CN202186376U - Train control and monitoring system based on two-level bus - Google Patents

Train control and monitoring system based on two-level bus Download PDF

Info

Publication number
CN202186376U
CN202186376U CN201120321216XU CN201120321216U CN202186376U CN 202186376 U CN202186376 U CN 202186376U CN 201120321216X U CN201120321216X U CN 201120321216XU CN 201120321216 U CN201120321216 U CN 201120321216U CN 202186376 U CN202186376 U CN 202186376U
Authority
CN
China
Prior art keywords
train
bus
trains
wtb
redundant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120321216XU
Other languages
Chinese (zh)
Inventor
陈美霞
奚华峰
王爱武
张军贤
吕红强
黄坤林
夏益韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Nanjing Puzhen Co Ltd
Original Assignee
CSR Nanjing Puzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Nanjing Puzhen Co Ltd filed Critical CSR Nanjing Puzhen Co Ltd
Priority to CN201120321216XU priority Critical patent/CN202186376U/en
Application granted granted Critical
Publication of CN202186376U publication Critical patent/CN202186376U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The utility model provides a train control and monitoring system based on two-level bus, wherein the improvement of the system is that: each train comprises two central control units, a plurality of train sub-systems, and a CAN train bus which penetrates through the entire train; all sub-systems on the train communicate with one of two central control units on the train through the CAN train bus; two redundant WTB buses are arranged between the trains; the WTB buses and the CAN train bus realize information exchange through a gateway. The central control units are redundant with each other so as to ensure that train control and diagnosis system normally operates; the trains are connected by the two redundant WTB buses when the trains are hung together; all data can be simultaneously transmitted through the two WTB buses; the information transmission between the trains is not affected by the fault of one bus and the master processor of each hung train is independent with each other without effect to each other.

Description

Train Control and monitored control system based on the two-stage bus
Technical field
The utility model relates to the control and the monitored control system of a kind of control and fault localization system, particularly a kind of inter-city train.
Background technology
Present inter-city train is a complication system that a plurality of decentralised controls unit is arranged; The task of Train Control and monitored control system is for the driver effective train status information to be provided in train operation, maintenance period; Send some control commands simultaneously, the control part mobile unit.The inter-city train network mainly adopts the MVB bus at present; Its core technology is grasped by several international famous big company always; Present home market is almost these companies and monopolizes, thereby buying, maintenance and replacement cost are very high, and it is high to cause the user to run with maintenance cost.
Summary of the invention
The utility model technical matters to be solved is, overcomes the above-mentioned shortcoming of prior art, and a kind of Train Control and monitored control system based on the two-stage bus is provided, characteristics such as it has the reliability height, and equipment cost is low, maintainability is strong.
In order to solve above technical matters; Train Control and monitored control system that the utility model provides based on the two-stage bus; It is characterized in that: every train comprises two Central Processing Unit (CPU)s, some train subsystems and a CAN train bus-line that runs through full car, and subsystems all on the train are all through a communication in two Central Processing Unit (CPU)s on said CAN train bus-line and this train; Be provided with two mutual redundant WTB buses between train and the train, said WTB bus realizes information exchange through gateway and CAN train bus-line.
Under the normal circumstances; A primary processor (Central Processing Unit (CPU)) control train network; Another primary processor is in the state of intercepting; When controlling the primary processor fault of train network, the primary processor that is in the state of intercepting will be taken over the fault primary processor immediately automatically, thereby guarantee that Train Control and diagnostic system normally move.Train joins when hanging, and adopts two mutual redundant WTB buses between train and the train, and all data can be transmitted through two WTB buses simultaneously, and a bus failure does not influence the information transfer between the train.And each primary processor that joins the extension train is relatively independent, is independent of each other.
Further, the information between train and the train exchanges through the WTB bus, is provided with the driver's cab touch sensitive display unit in the two ends driver's cab of every train, in order to showing the relevant information of all trains, and all trains is controlled and is managed.
It is thus clear that, the utility model ingenious conception, reliability height, equipment cost is low, maintainability is strong.The utility model will be widely used in field of track traffic, have good market outlook.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is based on the Train Control of two-stage bus and monitored control system composition frame chart.
The specific embodiment
As shown in Figure 1; Present embodiment is based on the Train Control and the monitored control system of two-stage bus; Its improvements are: train T1, T2, T3 include two Central Processing Unit (CPU)s, some train subsystems and a CAN train bus-line that runs through full car separately; Subsystems all on the train are all through a communication in two Central Processing Unit (CPU)s on said CAN train bus-line and this train, and the arbitrary node fault can not influence the normal operation of whole network; Be provided with two mutual redundant WTB buses between train and the train; Has the automatic network-building function; Said WTB bus realizes information exchange through gateway and CAN train bus-line, and data can be transmitted through two WTB buses simultaneously, and a bus failure does not influence the information transfer between the train.
Information between train and the train exchanges through the WTB bus, is provided with the driver's cab touch sensitive display unit in the two ends driver's cab of every train, can show the train failure message, also can sending controling instruction.Join the information of hanging train and exchange, show the relevant information of all trains at the touch display of driver's cab through the WTB bus; In addition, the driver can carry out part control and management to all trains (comprise joining and hang train) through the touch display that activates driver's cab.The failure message that driver's cab shows mainly contains primary processor to be provided.
Except that the foregoing description, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement.

Claims (2)

1. based on the Train Control and the monitored control system of two-stage bus; It is characterized in that: every train comprises two Central Processing Unit (CPU)s, some train subsystems and a CAN train bus-line that runs through full car, and subsystems all on the train are all through a communication in two Central Processing Unit (CPU)s on said CAN train bus-line and this train; Be provided with two mutual redundant WTB buses between train and the train, said WTB bus realizes information exchange through gateway and CAN train bus-line.
2. Train Control and monitored control system based on the two-stage bus according to claim 1; It is characterized in that: the information between train and the train exchanges through the WTB bus; Be provided with the driver's cab touch sensitive display unit in the two ends driver's cab of every train; In order to showing the relevant information of all trains, and all trains are controlled and managed.
CN201120321216XU 2011-08-29 2011-08-29 Train control and monitoring system based on two-level bus Expired - Lifetime CN202186376U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120321216XU CN202186376U (en) 2011-08-29 2011-08-29 Train control and monitoring system based on two-level bus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120321216XU CN202186376U (en) 2011-08-29 2011-08-29 Train control and monitoring system based on two-level bus

Publications (1)

Publication Number Publication Date
CN202186376U true CN202186376U (en) 2012-04-11

Family

ID=45917843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120321216XU Expired - Lifetime CN202186376U (en) 2011-08-29 2011-08-29 Train control and monitoring system based on two-level bus

Country Status (1)

Country Link
CN (1) CN202186376U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103997545A (en) * 2014-06-13 2014-08-20 青岛四方车辆研究所有限公司 Train broadband communication network architecture suitable for railway vehicle
RU185070U1 (en) * 2018-08-17 2018-11-19 Общество с ограниченной ответственностью "Уральские локомотивы" ELECTRIC TRAIN
CN112572147A (en) * 2019-09-27 2021-03-30 中车株洲电力机车研究所有限公司 Man-machine interaction system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103997545A (en) * 2014-06-13 2014-08-20 青岛四方车辆研究所有限公司 Train broadband communication network architecture suitable for railway vehicle
RU185070U1 (en) * 2018-08-17 2018-11-19 Общество с ограниченной ответственностью "Уральские локомотивы" ELECTRIC TRAIN
CN112572147A (en) * 2019-09-27 2021-03-30 中车株洲电力机车研究所有限公司 Man-machine interaction system

Similar Documents

Publication Publication Date Title
US11511712B2 (en) Train compartment brake control method, train compartment, and train
CN106240601B (en) Train network system
CN202944335U (en) Electric driving diesel multiple unit train and multi-connection train
CN201193041Y (en) Traction control system based on TCN network
CN101702694B (en) Train interconnection gateway and system and train communication method
CN204231391U (en) A kind of locomotive vehicle-mounted general data communication gateway
CN204272154U (en) The Ethernet switch of EMU network system
CN104683441A (en) Communication method of railway vehicle network system
CN201878159U (en) Train communication system based on two CAN (controller area network) buses
CN103617495B (en) Comprehensive transportation junction operation management system and method based on full-configuration HMI
CN205469068U (en) City rail train network heavily allies oneself with control system
CN103112459B (en) Locomotive control device, system and method
CN105262651A (en) Novel communication network topology for motor train unit based on TCN (Train Communication Network) and industrial Ethernet
CN202186376U (en) Train control and monitoring system based on two-level bus
CN110435723A (en) A kind of Distributed Area computer interlock system
CN202163460U (en) Re-connection light rail vehicle based on field bus
CN206086762U (en) Rail vehicle and train communications network system thereof
CN104554347A (en) Interconnection method for rail vehicles
CN202541531U (en) Primary network train control monitoring device based on MVB (Multifunction Vehicle Bus) bus
CN202617154U (en) Train communication system
CN103786595B (en) The gateway controller of suspend control meshed network and control system
CN111314399A (en) Ethernet-based train flexible dynamic marshalling method, device, medium and equipment
CN105577478A (en) Train network control system based on TCN (Train Communication Network)
CN102339058B (en) Digital expansion board for rail transit vehicle braking system
CN205034136U (en) Train operation monitoring system data expanding unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 210031 Nanjing, Pu Pu North Road, No. 68, Jiangsu

Patentee after: CRRC NANJING PUZHEN CO., LTD.

Address before: 210031 Nanjing, Pu Pu North Road, No. 68, Jiangsu

Patentee before: CSR NANJING PUZHEN Vehicles Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120411