CN202181194U - Main arm structure of fork device - Google Patents

Main arm structure of fork device Download PDF

Info

Publication number
CN202181194U
CN202181194U CN2011202506787U CN201120250678U CN202181194U CN 202181194 U CN202181194 U CN 202181194U CN 2011202506787 U CN2011202506787 U CN 2011202506787U CN 201120250678 U CN201120250678 U CN 201120250678U CN 202181194 U CN202181194 U CN 202181194U
Authority
CN
China
Prior art keywords
welded
plate
web
main arm
type main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202506787U
Other languages
Chinese (zh)
Inventor
高晔
商飞
宋红兵
曹磊
贾吉鹏
石锋华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Xugong Special Construction Machinery Co Ltd
Original Assignee
Xuzhou Xugong Special Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Xugong Special Construction Machinery Co Ltd filed Critical Xuzhou Xugong Special Construction Machinery Co Ltd
Priority to CN2011202506787U priority Critical patent/CN202181194U/en
Application granted granted Critical
Publication of CN202181194U publication Critical patent/CN202181194U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Vehicle Body Suspensions (AREA)

Abstract

The utility model relates to a main arm structure of a fork device, belonging to a main arm structure of engineering machinery. An upper cover board of an main arm is welded at the inner side of a U-shaped main arm plate to form a high-strength box body structure; second shaft sleeves are respectively welded at two sides of the rear surface of a wall board of the U-shaped main arm plate; a bending cover board is welded at one side of the rear surface of the wall board of the U-shaped main arm plate; a crescent plate is welded on the rear surface of a main shaft sleeve on the wall board of the U-shaped main arm plate; a rear web, a rear inner web and a fourth shaft sleeve are respectively welded at one side of the rear surface of the U-shaped main arm plate; a cylinder supporting plate is symmetrically welded on a left web and a right web plate; a third shaft sleeve is welded on the left web and the right web, a front lower rib plate is welded in the middle of a front side plate of the lower part of the front end of the U-shaped main arm plate. The main arm structure has the advantages that by adopting the combination of the U-shaped main arm plate and the upper cover board, weld joints are greatly reduced; all webs with curved appearances are combined with an arm frame to realize stress distribution so as to effectively homogenize the stress on the main arm structure and improve the integral strength; and the main arm structure has strong bearing capacity, a simple structure and light weight.

Description

A kind of fork installation principal arm structure
Technical field
The utility model relates to a kind of principal arm structure of construction machinery and equipment, particularly a kind of fork installation principal arm structure.
Background technology
The fork installation is a kind of high-mobility, multipurpose, wheeled vehicle lifting haulage equipment, integrates stability and high efficiency, is suitable for various materials carrying environment.The fork installation has its unique construction, and front end is an equipment, and equipment comprises compositions such as principal arm, telescopic jib (being included in the principal arm) and unsteady pallet fork.In lifting high operation, mainly bear the gravity that whole telescopic jib, pallet fork and load produce through principal arm.Present stage fork installation principal arm structure generally adopts four blocks of sheet materials to be welded into the tetragonal version that the cross section is a standard; Because of project organization unreasonable; Butt weld is many; Welding stress is difficult for discharging, and makes the stressed homogeneity of swing arm in the lifting process bad, causes harmful effects such as principal arm pot life weak point, cracking.
The utility model content
The purpose of the utility model is that a kind of fork installation principal arm structure rational in infrastructure, high-intensity will be provided.
The purpose of the utility model is achieved in that this principal arm comprises: bent plate, rear web, back endosternum and the 4th axle sleeve in U type main semaphore arm, preceding epiplastron, upper cover plate, epiplastron, main brass, bending cover plate, reverse link, first axle sleeve, second axle sleeve, left web, right web, oil cylinder stay bearing plate, third axle cover, front side plate, preceding lower web plate, the back; U type main semaphore arm is a main body, and the inboard that upper cover plate is welded on U type main semaphore arm forms a high strength body structure; Preceding epiplastron and epiplastron are welded on the front portion and the medium position of upper cover plate respectively; Second axle sleeve is welded on the both sides, back of the wallboard of U type main semaphore arm respectively; The bending bridge welding is connected on wallboard back one side of U type main semaphore arm; Main brass is welded between two wallboards of U type main semaphore arm and passes the bending cover plate; First axle sleeve is welded on above the bending cover plate; Reverse link 7 is welded on main brass back above the wallboard of U type main semaphore arm; Bent plate is welded between the wallboard and bending cover plate of U type main semaphore arm in the back; Rear web, back endosternum and the 4th axle sleeve are welded on wallboard back one side of U type main semaphore arm respectively; Left web and right web are welded on the middle both sides of U type main semaphore arm respectively; The oil cylinder stay bearing plate is symmetrically welded on left web and the right web; The third axle cover is welded on left web and the right web; Front side plate is symmetrically welded at the front end both sides of U type main semaphore arm; Preceding lower web plate is welded on the centre of U type main semaphore arm front end lower front side plate.
Beneficial effect, owing to adopted such scheme, the combination through U type master's wallboard and upper cover plate has significantly reduced weld seam, becomes two weld seams by four weld seams, has reduced welding stress and welding deformation.Arm head is strengthened by four groups of high strength webs, side plate and gussets up and down at the arm head of principal arm, guaranteed arm head intensity.Force localization is at the principal arm midway location when whole swing arm is stretched entirely, and whole epiplastron has well been protected the torsional deflection of U type master wallboard under the weight effect, and the left and right sides web has been strengthened the intensity of whole swing arm box type construction.Simultaneously the profiled holes in the middle of the web of the left and right sides with backward gradually the design of the contour structures of transition make the welding stress that produces in the swing arm welding process obtain good release again, when having guaranteed principal arm work reliably, safety.Thereby the design of one-sided cover plate has reduced the width of principal arm again when guaranteeing the normal supply oil mass of leveling cyclinder reduce the principal arm volume, and weight is lighter.It is strong, simple for structure, in light weight that whole principal arm has a load-carrying capacity, reaches the stability and the lifting performance that improve complete machine, simplified welding process simultaneously, improved work efficiency.
Advantage: adopt the combination of U type master's wallboard and upper cover plate, significantly reduced weld seam; Each web adopts curved profile to combine the stressed distribution of jib, actv. make the principal arm structure stress more all should, improved bulk strength; The principal arm rear end adopts great circle arc to carry out transition, has reduced stress concentration.The oil cylinder stay bearing plate is welded on U template midway location and makes swing arm stressed more even in the lifting process, improves the principal arm pot life.Whole principal arm structure has reduced welding stress and welding process difficulty, alleviates working strength, and load-carrying capacity is strong, simple for structure, in light weight.
Description of drawings
Fig. 1 is the constructional drawing of the utility model.
Fig. 2 is the cover plate sectional structure chart of the utility model.
Among the figure, 1, U type main semaphore arm; 2, preceding epiplastron; 3, upper cover plate; 4, epiplastron; 5, main brass; 6, bending cover plate; 7, reverse link; 8, first axle sleeve; 9, second axle sleeve; 10, left web; 11, right web; 12, oil cylinder stay bearing plate; 13, third axle cover; 14, front side plate; 15, preceding lower web plate; 16, bent plate in the back; 17, rear web; 18, back endosternum; 19, the 4th axle sleeve.
The specific embodiment
Embodiment 1: this principal arm comprises: bent plate 16, rear web 17, back endosternum 18 and the 4th axle sleeve 19 in U type main semaphore arm 1, preceding epiplastron 2, upper cover plate 3, epiplastron 4, main brass 5, bending cover plate 6, reverse link 7, first axle sleeve 8, second axle sleeve 9, left web 10, right web 11, oil cylinder stay bearing plate 12, third axle cover 13, front side plate 14, preceding lower web plate 15, the back.U type main semaphore arm 1 is a main body, and the inboard that upper cover plate 3 is welded on U type main semaphore arm 1 forms a high strength body structure; Preceding epiplastron 2 and epiplastron 4 are welded on the front portion and the medium position of upper cover plate 3 respectively; Second axle sleeve 9 is welded on the both sides, back of the wallboard of U type main semaphore arm 1 respectively; Bending cover plate 6 is welded on wallboard back one side of U type main semaphore arm 1; Main brass 5 is welded between two wallboards of U type main semaphore arm 1 and passes bending cover plate 6; First axle sleeve 8 is welded on above the bending cover plate 6; Reverse link 7 is welded on No. 5 part main brasss back above the wallboard of U type main semaphore arm 1; Bent plate 16 is welded between the wallboard and bending cover plate 6 of U type main semaphore arm 1 in the back; Rear web 17, back endosternum 18 and the 4th axle sleeve 19 are welded on wallboard back one side of U type main semaphore arm 1 respectively; Left web 10 is welded on U type main semaphore arm 1 middle both sides respectively with right web 11; Oil cylinder stay bearing plate 12 is symmetrically welded on left web 10 and the right web 11; Third axle cover 13 is welded on left web 10 and the right web 11; Front side plate 14 is symmetrically welded at the front end both sides of U type main semaphore arm 1; Preceding lower web plate 15 is welded on the centre of U type main semaphore arm 1 front end lower front side plate 14.

Claims (1)

1. pitch installation principal arm structure for one kind; It is characterized in that: this principal arm comprises: this principal arm comprises: bent plate, rear web, back endosternum and the 4th axle sleeve in U type main semaphore arm, preceding epiplastron, upper cover plate, epiplastron, main brass, bending cover plate, reverse link, first axle sleeve, second axle sleeve, left web, right web, oil cylinder stay bearing plate, third axle cover, front side plate, preceding lower web plate, the back; U type main semaphore arm is a main body, and the inboard that upper cover plate is welded on U type main semaphore arm forms a high strength body structure; Preceding epiplastron and epiplastron are welded on the front portion and the medium position of upper cover plate respectively; Second axle sleeve is welded on the both sides, back of the wallboard of U type main semaphore arm respectively; The bending bridge welding is connected on wallboard back one side of U type main semaphore arm; Main brass is welded between two wallboards of U type main semaphore arm and passes the bending cover plate; First axle sleeve is welded on above the bending cover plate; Reverse link 7 is welded on main brass back above the wallboard of U type main semaphore arm; Bent plate is welded between the wallboard and bending cover plate of U type main semaphore arm in the back; Rear web, back endosternum and the 4th axle sleeve are welded on wallboard back one side of U type main semaphore arm respectively; Left web and right web are welded on the middle both sides of U type main semaphore arm respectively; The oil cylinder stay bearing plate is symmetrically welded on left web and the right web; The third axle cover is welded on left web and the right web; Front side plate is symmetrically welded at the front end both sides of U type main semaphore arm; Preceding lower web plate is welded on the centre of U type main semaphore arm front end lower front side plate.
CN2011202506787U 2011-07-15 2011-07-15 Main arm structure of fork device Expired - Lifetime CN202181194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202506787U CN202181194U (en) 2011-07-15 2011-07-15 Main arm structure of fork device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202506787U CN202181194U (en) 2011-07-15 2011-07-15 Main arm structure of fork device

Publications (1)

Publication Number Publication Date
CN202181194U true CN202181194U (en) 2012-04-04

Family

ID=46174240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202506787U Expired - Lifetime CN202181194U (en) 2011-07-15 2011-07-15 Main arm structure of fork device

Country Status (1)

Country Link
CN (1) CN202181194U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102249170A (en) * 2011-07-15 2011-11-23 徐州徐工特种工程机械有限公司 Main jib structure for fork installing machine
CN109052237A (en) * 2018-10-11 2018-12-21 河南垣发专用车辆集团有限公司 A kind of forklift automatic hydraulic levelling device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102249170A (en) * 2011-07-15 2011-11-23 徐州徐工特种工程机械有限公司 Main jib structure for fork installing machine
CN102249170B (en) * 2011-07-15 2013-06-12 徐州徐工特种工程机械有限公司 Main jib structure for fork installing machine
CN109052237A (en) * 2018-10-11 2018-12-21 河南垣发专用车辆集团有限公司 A kind of forklift automatic hydraulic levelling device

Similar Documents

Publication Publication Date Title
CN205114903U (en) Demolition structure of tower crane counter weight
CN202175968U (en) Enhanced excavator movable arm
CN202181194U (en) Main arm structure of fork device
CN205312931U (en) Modular cantilever crane and hoisting equipment
CN102249170B (en) Main jib structure for fork installing machine
CN201687021U (en) Loading machine positive rotation six-link mechanism
CN201180068Y (en) Novel large-capacity tonnage pipelayer
CN202378960U (en) Crane frame and crane
CN108330923A (en) The stratified pumping gate of fast accurate control
CN201105946Y (en) Main girder of single-beam crane
CN204212059U (en) A kind of dilatory with large span heavy duty slipway beam
CN203066855U (en) Sliding frame and power device and rotary drilling rig
CN203653074U (en) Quick-assembled combined cross beam for portal crane
CN203229979U (en) Digging machine
CN201932850U (en) Integral balance arm of tower crane
CN203159050U (en) Crane end beam
CN208454348U (en) A kind of light-duty turntable
CN206842909U (en) A kind of single-beam bridge electric up-down crane
CN201784728U (en) Traveling gear for rotary drilling rig
CN202138957U (en) Undercarriage for movable hoisting equipment
CN201446985U (en) High-strength easy-manufacture track plate
CN203529797U (en) Connecting structure for lifting beam and crane head of tower crane
CN203613574U (en) Inner bucket rod of digging working device of telescopic boom loader-digger
CN204343455U (en) A kind of novel plugging steel construction piece
CN203698063U (en) Mineral carriage of electric wheel dumper

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120404

Effective date of abandoning: 20130612

RGAV Abandon patent right to avoid regrant