CN202152555U CN 201120194310 CN201120194310U CN202152555U CN 202152555 U CN202152555 U CN 202152555U CN 201120194310 CN201120194310 CN 201120194310 CN 201120194310 U CN201120194310 U CN 201120194310U CN 202152555 U CN202152555 U CN 202152555U
Authority
CN
China
Prior art keywords
steel
inner cylinder
chimney
steel inner
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120194310
Other languages
Chinese (zh)
Inventor
刘天英
杨眉
蒋家宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN 201120194310 priority Critical patent/CN202152555U/en
Application granted granted Critical
Publication of CN202152555U publication Critical patent/CN202152555U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

A double-barreled chimney with a section-type hung steel inner cylinder comprises a reinforced concrete outer cylinder and the steel inner cylinder, and is characterized in that the steel inner cylinder is directly hung by steel hanging rods onto the outer wall of the reinforced concrete outer cylinder in a section-type manner. The structure provided by the utility model directly transmits load to the reinforced concrete outer cylinder, so that the force transmission path is short, both the steel inner cylinder and the steel hanging rods are pulled, the characteristic that steel material has superior tension is fully played, the work amount of the steel inner cylinder is less than that of the prior art, the chimney is higher and the inner diameter is larger, more steel material can be saved, and the economic benefits are rather considerable because the chimney adopting the section-type hanging steel inner cylinder saves the sum steel material of the chimney.

Description

Two-tube segmentation suspension type Steel Inner Core of Chimney
Technical field
The utility model relates to coal-burning power plant's Steel Inner Core of Chimney.
Background technology
The overwhelming majority adopts Steel Inner Core of Chimney in the coal fired power plant at present.Chimney divides inner/outer tube, and urceolus is a steel reinforced concrete tube structure, mainly is used for bearing deadweight, the vertical and horizontal loading that maintenance, wind, earthquake etc. cause is installed; Steel inner cylinder is used for smoke evacuation, and steel inner cylinder mainly contains two kinds of form of structure at present: the one, and self-supporting steel inner cylinder structure, steel inner cylinder is omnidistance supports oneself; Deadweight is directly passed to the basis via the steel cylinder stack shell; At interval platform is only shaken in a determining deviation setting in the steel concrete urceolus, steel inner cylinder except that being conducted oneself with dignity, the steel concrete urceolus bear that wind carries, also very big to its active force when geological process, additional bending moment; Because these loadings self are born by the steel cylinder barrel; And the barrel pressurized, so barrel is thicker, the engineering quantity of steel inner cylinder self is bigger.The 2nd, integral hanging or segmentation suspension steel inner cylinder structure; A determining deviation is provided with the steel platform at interval in the steel concrete urceolus, and steel inner cylinder is suspended on the steel platform, and the girder steel of steel platform is supported on the steel concrete urceolus; The loading of steel inner cylinder is reached the steel concrete urceolus, bear by it.This kind form of structure has been considered the characteristics that the tensile property of steel is superior, and steel cylinder is drawn, and barrel is thinner, so the engineering quantity of steel cylinder self is little than the self-supporting scheme.But the diameter of steel concrete urceolus is bigger usually, and the girder steel span of steel platform is also just very big, and the loading of steel inner cylinder also acts directly on the girder steel, and girder steel is a flexural member, and the section of girder steel is very big, and the engineering quantity of whole steel platform is very big.More than two kinds of scheme costs all very high.
Summary of the invention
The purpose of the utility model provides a kind of segmentation suspension type Steel Inner Core of Chimney of easy construction, to practice thrift steel, reduces the investment of chimney.
For realizing above-mentioned purpose, the utility model provides segmentation suspension type Steel Inner Core of Chimney, comprises a steel concrete urceolus and steel inner cylinder, it is characterized in that directly the steel inner cylinder segmentation being hung on the steel concrete outer tube wall through the steel suspension rod.The structure of the utility model directly reaches load on the steel concrete urceolus, and Path of Force Transfer is short prompt, and steel inner cylinder and steel suspension rod are all drawn, and have given full play to the superior characteristics of steel examining tensile behavior.The adjustable length of steel suspension rod own is to adapt to the error in the construction.Interval one determining deviation is provided with the steel platform in the steel concrete urceolus, but these steel platforms only are used for only rolling and repair and maintenance, and steel using amount is little.
The utility model connected node is simple, and it is very convenient to construct.The suspension type chimney has overcome the shortcoming of self-supporting and suspension type chimney, and the engineering quantity of steel inner cylinder is much littler than the self-supporting scheme, and steel platform engineering amount is much littler than the suspension type scheme.With 240 meters of chimney heights, two steel inner cylinders, the internal diameter of each steel inner cylinder are 7 meters and are example (this example is a present 600MW level unit chimney commonly used); Adopt segmentation suspension type scheme to compare, can save about about 400 tons of steel, with adopting the suspension type scheme to compare with the self-supporting scheme; Also can save about about 180 tons of steel; Chimney is high more, and internal diameter is big more, and the steel material of saving is just many more.So the total rolled steel dosage that adopts segmentation suspension type Steel Inner Core of Chimney to save chimney, its economic benefit is considerable.
Description of drawings
Fig. 1 is the layout plan of suspension type Steel Inner Core of Chimney, is pipe in two steel among the figure;
Fig. 2 is the annexation sketch map of steel suspension rod and steel concrete urceolus and steel inner cylinder.
Legend: 1, steel concrete urceolus, 2, steel inner cylinder, 3, steel inner cylinder outside horizontal stiffness ring, 4, the pin hinge, 5, the steel suspension rod, 6, the suspension rod take-up device.
The specific embodiment
As depicted in figs. 1 and 2; Two steel inner cylinders are set in the steel concrete urceolus; Be connected the fixing circle horizontal stiffness ring in corresponding position with the steel suspension rod at steel inner cylinder stack shell outer wall, fixing 3 pin hinges on the rigidity ring, corresponding fixing 3 pin hinges on the steel concrete outer tube wall; The steel suspension rod is connected between urceolus pin hinge and the steel inner cylinder pin hinge, is useful on the suspension rod take-up device of adjustment length on the steel suspension rod.Each steel inner cylinder of present embodiment is provided with horizontal rigidity ring of twice and steel suspension rod.Steel inner cylinder is sectional making at the scene, is about 6 meters one section, is welded to connect then; Progressively push up to design height through the mode of pneumatic jacking; The suspension rod take-up device is used for adjusting the length of steel suspension rod, and to adapt to the error of construction, steel inner cylinder just is installed in the steel concrete urceolus very easily like this.

Claims (1)

1. two-tube segmentation suspension type Steel Inner Core of Chimney comprises a steel concrete urceolus and steel inner cylinder, it is characterized in that directly the steel inner cylinder segmentation being hung on the steel concrete outer tube wall through the steel suspension rod.
CN 201120194310 2011-06-10 2011-06-10 Double-barreled chimney with section-type hung steel inner cylinder Expired - Lifetime CN202152555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120194310 CN202152555U (en) 2011-06-10 2011-06-10 Double-barreled chimney with section-type hung steel inner cylinder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120194310 CN202152555U (en) 2011-06-10 2011-06-10 Double-barreled chimney with section-type hung steel inner cylinder

Publications (1)

Publication Number Publication Date
CN202152555U true CN202152555U (en) 2012-02-29

Family

ID=45693055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120194310 Expired - Lifetime CN202152555U (en) 2011-06-10 2011-06-10 Double-barreled chimney with section-type hung steel inner cylinder

Country Status (1)

Country Link
CN (1) CN202152555U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989166A (en) * 2015-07-15 2015-10-21 中国能源建设集团广东省电力设计研究院有限公司 Support structure for chimney internal steel cylinders
CN106639501A (en) * 2017-01-19 2017-05-10 上海必立结构设计事务所有限公司 D-shaped sleeve chimney
CN111962956A (en) * 2020-08-07 2020-11-20 上海必立结构设计事务所有限公司 Method for improving D-shaped inner cylinder chimney
CN113898239A (en) * 2021-10-12 2022-01-07 上海必立结构设计事务所有限公司 Simple shaking stopping device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989166A (en) * 2015-07-15 2015-10-21 中国能源建设集团广东省电力设计研究院有限公司 Support structure for chimney internal steel cylinders
CN106639501A (en) * 2017-01-19 2017-05-10 上海必立结构设计事务所有限公司 D-shaped sleeve chimney
CN111962956A (en) * 2020-08-07 2020-11-20 上海必立结构设计事务所有限公司 Method for improving D-shaped inner cylinder chimney
CN113898239A (en) * 2021-10-12 2022-01-07 上海必立结构设计事务所有限公司 Simple shaking stopping device
CN113898239B (en) * 2021-10-12 2023-03-14 上海必立结构设计事务所有限公司 Simple shaking stopping device

Similar Documents

Publication Publication Date Title
CN201151909Y (en) Deep foundation pit composite structure annular inner support
CN100545367C (en) The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node
CN211815489U (en) Super large span flying swallow type concrete filled steel tube arch bridge with self-anchoring suspension cable system
CN202152555U (en) Double-barreled chimney with section-type hung steel inner cylinder
CN105625787B (en) The silo structure and its construction method of prestressed steel structure and Combined concrete
CN103043543B (en) Device for reinforcing tower crane in coastal zone
CN202787047U (en) Deck type triangular steel truss composite beam
CN205382745U (en) Shallow round storehouse structure of prestressed steel structure and concrete combination
CN102444270B (en) Sleeve joint oblique key type support bracket
CN103603426B (en) A kind of bracing or strutting arrangement for frame construction
CN203173749U (en) Assembled integral type vertical self-jacking device of hydraulic double-type crane tower
CN205907812U (en) large cantilever steel frame structure with pull rod
CN102720269B (en) Multilayer cantilever rigid cylindrical structure system
CN203034345U (en) Coal transporting trestle of integral continuous steel truss
CN202881858U (en) Jig frame used for vertical assembly construction of truss arc bridge
CN111980475A (en) Chimney with steel hoop inner barrel
CN107795184B (en) Truss bearing platform structure of three-pipe sleeve type chimney
CN205617805U (en) Steel jig frame for daylighting roof steel structure construction
CN105804401B (en) Construction steel jig frame and method for constructing daylighting roof steel structure by using same
CN201620623U (en) Trestle-penetrating chimney
CN212533734U (en) Cable buckle integrated tower
CN203571233U (en) Large-span X-shaped spatial arch pipeline support
CN203684394U (en) Supporting device for framework structure
CN101845914B (en) Installation method of three-tube steel chimney
CN202769631U (en) Pipeline supporting and hanging structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER ENGINEERING CONSULTING GROUP NORTHEAST

Free format text: FORMER NAME: NORTHEASTERN ELECTRIC POWER DESIGN INSTITUTE, CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 130021 Jilin City, Changchun province people's street, No. 4368

Patentee after: Co., Ltd of Northeastern Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Address before: 130021 Jilin City, Changchun province people's street, No. 4368

Patentee before: Northeastern Electric Power Design Institute, China Power Engineering Consulting Group Corporation

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120229