CN202152546U - A preceding drilling method drilling steel member assembly die - Google Patents

A preceding drilling method drilling steel member assembly die Download PDF

Info

Publication number
CN202152546U
CN202152546U CN2011201520151U CN201120152015U CN202152546U CN 202152546 U CN202152546 U CN 202152546U CN 2011201520151 U CN2011201520151 U CN 2011201520151U CN 201120152015 U CN201120152015 U CN 201120152015U CN 202152546 U CN202152546 U CN 202152546U
Authority
CN
China
Prior art keywords
die
plate
steel member
middle plate
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201520151U
Other languages
Chinese (zh)
Inventor
刘欢云
陈韬
何鲁清
虢跃德
范道红
李兵
常伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Jiangsu Corp Ltd
Original Assignee
China Construction Steel Structure Jiangsu Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Jiangsu Corp Ltd filed Critical China Construction Steel Structure Jiangsu Corp Ltd
Priority to CN2011201520151U priority Critical patent/CN202152546U/en
Application granted granted Critical
Publication of CN202152546U publication Critical patent/CN202152546U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model relates to a preceding drilling method drilling steel member assembly die, which comprises die side plates, a middle plate, and a die platform. Two supporting plates are disposed on the die platform; the middle plate is disposed on the two supporting plates; outer sides of the two supporting plates are provided with backing plates; outer sides of the two backing plates are provided with the die side plates; one end of each die side plate and one end of the middle plate are connected with a baffle plate disposed on the front end of the die platform; and the die side plates and the middle plate are provided with through holes. Compared with a conventional steel member assembly die, the preceding drilling method drilling steel member assembly die is capable of guaranteeing surface size and hole position of corbels of steel members of the same type solely, and thus realizes rapid assembly, reduces manual lofting and checking time during assembly, enables mass production, improves drilling precision of bolt holes and working efficiency of corbel assembly and guarantees spot assembly precision; and is reusable.

Description

Legal system hole, a kind of first hole steel member assembly jig
Technical field:
The utility model relates to mould, relates in particular to steel work manufacture field bracket legal system hole, a kind of first hole steel member assembly jig of assembling fast.
Background technology:
Along with the continuous development of Building technology, the problem that the original building technical costs is high, building speed is slow, can not build the above mansion of tens layers can not satisfy the requirement of Building technology development.Steel work just more and more widely be used for buildings such as high buildings and large mansions, large-sized workshop, large-span space structure; And high-strength bolt connects and to have characteristics simple in structure, that pattern is various, connection is reliable, mounting or dismounting are convenient, cost is low, and more and more widely quilt uses in structural steelwork.
Summary of the invention:
The purpose of the utility model will provide legal system hole, a kind of first hole steel member assembly jig exactly, and it can overcome the existing problem of existing building technology.The purpose of the utility model is to realize like this; Legal system hole, a kind of first hole steel member assembly jig; Comprise that mould side plate, middle plate, mold platform form, it is characterized in that: mold platform is provided with two gripper shoes, is provided with middle plate above two gripper shoes; Two gripper shoe arranged outside have backing plate, and two backing plate arranged outside have the mould side plate; One end of described two mould side plates, middle plate be arranged on mold platform on the baffle plate of front end link to each other; Described mould side plate, middle plate are provided with through hole.The utility model compared with prior art in the bracket of similar Steel section member, only needs to make a mould; The surface size of bracket and position, hole all are guaranteed, and can assemble fast, have reduced artificial setting-out, review time in the assembling process; Can form production in enormous quantities; Improved the drilling precision of bolt hole and the operating efficiency of assembling bracket greatly, guaranteed on-the-spot installation accuracy, and had the characteristics of recycle.
Description of drawings:
Fig. 1 the utility model perspective view;
1. mould side plate, 2. in plate, 3. mold platform, 4. baffle plate, 5. gripper shoe, 6. backing plate.
The specific embodiment: the utility model is described further below in conjunction with accompanying drawing;
Legal system hole, a kind of first hole steel member assembly jig; Comprise that mould side plate, middle plate, mold platform form, it is characterized in that: mold platform is provided with two gripper shoes, is provided with middle plate above two gripper shoes; Two gripper shoe arranged outside have backing plate, and two backing plate arranged outside have the mould side plate; One end of described two mould side plates, middle plate be arranged on mold platform on the baffle plate of front end link to each other; Described mould side plate, middle plate are provided with through hole.During practical implementation; Bracket is made up of bracket wing plate, bracket web; According to the hole and the dimensional requirement of high-strength bolt on steel member bracket wing plate, the bracket web on the drawing, mould side plate 1, middle plate 2 parts are carried out blanking, and hole; Guarantee borehole accuracy, make on mould side plate 1, No. 2 parts of middle plate each high-strength bolt hole respectively with bracket wing plate, bracket web on the hole corresponding.Again according to the requirement of bracket surface size, design and mfg. moulding die platform 3, baffle plate 4, support 5, backing plate 6 parts.All parts are pressed the assembling of the utility model stereogram, welding.After making completion, the bracket part on the steel member can carry out batch blanking and boring earlier, utilizes the positioner of mould to assemble again.At first place the bracket web on the plate, top and baffle plate hold out against, utilize again with the bracket web on the bolt that is complementary, make it pass the bracket web and connect with bolt hole on the middle plate.Secondly advance mould to left and right bracket wing plate along cushion block from both sides, top and baffle plate hold out against, use again with the bracket wing plate on the bolt that is complementary, make it pass the bracket wing plate and connect with bolt hole on the mould side plate.At last bracket is carried out spot welding, whole bracket assembling is accomplished, and takes off bolt again, hangs mould to bracket.

Claims (1)

1. legal system hole, first hole steel member assembly jig; Comprise that mould side plate, middle plate, mold platform form, it is characterized in that: mold platform is provided with two gripper shoes, is provided with middle plate above two gripper shoes; Two gripper shoe arranged outside have backing plate, and two backing plate arranged outside have the mould side plate; One end of described two mould side plates, middle plate be arranged on mold platform on the baffle plate of front end link to each other; Described mould side plate, middle plate are provided with through hole.
CN2011201520151U 2011-05-13 2011-05-13 A preceding drilling method drilling steel member assembly die Expired - Fee Related CN202152546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201520151U CN202152546U (en) 2011-05-13 2011-05-13 A preceding drilling method drilling steel member assembly die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201520151U CN202152546U (en) 2011-05-13 2011-05-13 A preceding drilling method drilling steel member assembly die

Publications (1)

Publication Number Publication Date
CN202152546U true CN202152546U (en) 2012-02-29

Family

ID=45693046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201520151U Expired - Fee Related CN202152546U (en) 2011-05-13 2011-05-13 A preceding drilling method drilling steel member assembly die

Country Status (1)

Country Link
CN (1) CN202152546U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106141475A (en) * 2015-04-23 2016-11-23 五冶集团上海有限公司 Using method for the servicing unit that welded H type bracket assembles
CN110529153A (en) * 2019-08-16 2019-12-03 上海市基础工程集团有限公司 The shield tunnel lining cutting trimming setting-out mold and method of steel loop

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106141475A (en) * 2015-04-23 2016-11-23 五冶集团上海有限公司 Using method for the servicing unit that welded H type bracket assembles
CN106141475B (en) * 2015-04-23 2018-07-13 五冶集团上海有限公司 The application method of auxiliary device for the assembling of welded H type bracket
CN110529153A (en) * 2019-08-16 2019-12-03 上海市基础工程集团有限公司 The shield tunnel lining cutting trimming setting-out mold and method of steel loop
CN110529153B (en) * 2019-08-16 2021-10-01 上海市基础工程集团有限公司 Laying-out die and method for steel ring for shield tunnel lining renovation

Similar Documents

Publication Publication Date Title
CN105544814A (en) Modular integrated building system
CN209195005U (en) Aluminium frame wooden formwork structure at beam slab and column joint
CN202152546U (en) A preceding drilling method drilling steel member assembly die
CN210827939U (en) Double-steel-plate combined shear wall
CN109356288B (en) Node connection method of box type regional constraint assembled frame
CN108748653B (en) Shield tunnel segment mold capable of manufacturing multi-form tenons
CN108627390B (en) Connector device of multifunctional adjustable pressure fatigue machine
CN211114233U (en) Vertical connection structure of assembled shear force wall
CN210013342U (en) Connecting device for green fabricated building light steel wall and foundation
CN205111169U (en) Stereo garage comb plate preparation frock
CN105522497A (en) Method for positioning parts such as aircraft skins and wall plates of multiple models
CN211597204U (en) Connection structure and precast concrete wallboard system
CN105223053A (en) A kind of resemble simulation test experiment test block producing device
CN203007848U (en) T beam middle transverse diaphragm casting tooling
CN112302195B (en) Lateral force resistant damper and steel frame combined structure and manufacturing method thereof
CN205928317U (en) General modular fixture of cantilever crane equipment
CN107052661B (en) Electromobile frame assembly welding tooling
CN203031191U (en) Hydraulic assembly device for excavator bucket
CN108049504B (en) Connecting method for assembled type combined wall
CN206474626U (en) A kind of riveting jig
CN105058560A (en) Bolt fast installation brick making mold
CN109108547A (en) A kind of steel member assembly mold
CN201702534U (en) Positioning module used for assembling and welding steel structure box type rod element
CN111305420A (en) Connection structure and precast concrete wallboard system
CN203448915U (en) Heading machine shoveling plate general platform combination mould

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120229

Termination date: 20140513