CN202119896U - Electric energy meter switching on/off automatic test circuit integrated on calibration bench - Google Patents
Electric energy meter switching on/off automatic test circuit integrated on calibration bench Download PDFInfo
- Publication number
- CN202119896U CN202119896U CN2011202066433U CN201120206643U CN202119896U CN 202119896 U CN202119896 U CN 202119896U CN 2011202066433 U CN2011202066433 U CN 2011202066433U CN 201120206643 U CN201120206643 U CN 201120206643U CN 202119896 U CN202119896 U CN 202119896U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- cpu
- optocoupler
- switching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Arrangements For Transmission Of Measured Signals (AREA)
Abstract
An electric energy meter switching on/off automatic test circuit integrated on a calibration bench is provided. The test circuit comprises an optical coupler connected with a switching on/off module of an electric energy meter, a CPU connected with the optical coupler and used for detecting the switching on/off state of the electric energy meter, and a communication module for uploading the electric energy meter state obtained by the CPU. The input end of the optical coupler is connected with the switching on/off module of the electric energy meter, the output end of the optical coupler is connected with the CPU, and a relay is connected between the optical coupler and the CPU. The test circuit can be integrated on the automatic calibration bench and used for automatically detecting the electric energy meter switching on/off state, the labor intensity is low, the misjudgment rate is low, the manual live-line operation is unnecessary, and the safety is high.
Description
Technical field
The utility model relates to a kind of automatic testing circuit that detects electric energy meter drawing lock function, particularly a kind of electric energy meter drawing lock automatic testing circuit that is integrated in correction platform or the monitor station.
Background technology
Large batch of activity in production along with electric energy meter; Manual test pattern in the past can not well reach production requirement; Manual test tends to cause mistake survey, test leakage, and causes following the tracks of product quality, can't improve Production Line efficient; Reduce manually-operated and judgement, improve the quality of products.So we must go to change to automatic mode from manual test pattern in the past; The drawing lock function that needs more high efficiency detection electric energy meter; The drawing lock that comprises single-phase table and three-phase table, the drawing lock function to the multichannel electric energy meter that like this can be concurrent more fast detects.
All the time, the test of electric energy meter all rests on manual testing's stage, aims at test point through testing staff's manual test rod, and project of every test is changed different test points, and the testing staff is with the forceful electric power operation, very easily causes electric shock accidents.
Summary of the invention
Rest on manual testing's stage for overcoming existing electric energy meter test; Testing staff's labour intensity is big, False Rate is high, and artificial hot line job, very easily cause the shortcoming of electric shock accidents, the utility model to provide a kind of to be integrated in the auto-adjustment platform, robotization detects electric energy meter drawing lock function; Labour intensity is low; False Rate is low, need not artificial hot line job, the electric energy meter drawing lock automatic testing circuit of safe be integrated in correction platform.
Can be integrated in the electric energy meter drawing lock automatic testing circuit of correction platform; Comprise the optocoupler that is connected with the drawing lock module of electric energy meter; Be connected with optocoupler, be in and operate a switch or the CPU of "on" position and the electric energy meter state that CPU obtains is uploaded to the communication module of host computer to detect electric energy meter;
The input end of described optocoupler is connected with the drawing lock module of electric energy meter, and the output terminal of described optocoupler is connected with CPU, is provided with relay between described optocoupler and the described CPU.
Described communication module is 485 communication modules.
The technical conceive of the utility model is: host computer sends electric energy meter and operates a switch or reclosing command, at this moment relay closes.When electric energy meter closed a floodgate, the illuminator of optocoupler was lighted, and the light-receiving device of optocoupler is passed to CPU with the electric energy meter "on" position after sensing light signal; When electric energy meter was operated a switch, the illuminator of optocoupler extinguished, and the light-receiving device of optocoupler can't be sensed light, then think that electric energy meter is in the state of operating a switch, and this status signal of operating a switch is passed to CPU; CPU transfers to host computer through communication, and host computer sends the status signal of CPU passback with it instruction comparison if the status signal that returns conforms to the instruction that host computer sends, is then thought the drawing lock module operate as normal of electric energy meter.
Between optocoupler and CPU, relay is set; When host computer did not send the instruction of drawing lock, when promptly monitor station or correction platform were not tested electric energy meter drawing lock, relay broke off; The disconnection of optocoupler and CPU; The utility model is not worked, and optocoupler can not cause current loss to monitor station or correction platform, ensures the degree of accuracy of monitor station or correction platform.
The utlity model has can be integrated in the auto-adjustment platform, robotization detects electric energy meter drawing lock function, labour intensity is low, False Rate is low, need not artificial hot line job, safe advantage.
Description of drawings
Fig. 1 is the general frame figure of the utility model.
Fig. 2 is the assembling synoptic diagram of the utility model.
Embodiment
With reference to accompanying drawing, further specify the utility model:
Can be integrated in the electric energy meter drawing lock automatic testing circuit of correction platform; Comprise the optocoupler that is connected with the drawing lock module of electric energy meter; Be connected with optocoupler, be in and operate a switch or the CPU of "on" position and the electric energy meter state that CPU obtains is uploaded to the communication module of host computer to detect electric energy meter;
The input end of described optocoupler is connected with the drawing lock module of electric energy meter, and the output terminal of described optocoupler is connected with CPU, is provided with relay between described optocoupler and the described CPU.
Described communication module is 485 communication modules.
The technical conceive of the utility model is: host computer sends electric energy meter and operates a switch or reclosing command, at this moment relay closes.When electric energy meter closed a floodgate, the illuminator of optocoupler was lighted, and the light-receiving device of optocoupler is passed to CPU with the electric energy meter "on" position after sensing light signal; When electric energy meter was operated a switch, the illuminator of optocoupler extinguished, and the light-receiving device of optocoupler can't be sensed light, then think that electric energy meter is in the state of operating a switch, and this status signal of operating a switch is passed to CPU; CPU transfers to host computer through communication, and host computer sends the status signal of CPU passback with it instruction comparison if the status signal that returns conforms to the instruction that host computer sends, is then thought the drawing lock module operate as normal of electric energy meter.
Between optocoupler and CPU, relay is set; When host computer did not send the instruction of drawing lock, when promptly monitor station or correction platform were not tested electric energy meter drawing lock, relay broke off; The disconnection of optocoupler and CPU; The utility model is not worked, and optocoupler can not cause current loss to monitor station or correction platform, ensures the degree of accuracy of monitor station or correction platform.
The utlity model has can be integrated in the auto-adjustment platform, robotization detects electric energy meter drawing lock function, labour intensity is low, False Rate is low, need not artificial hot line job, safe advantage.
The described content of this instructions embodiment only is enumerating the way of realization of utility model design; The protection domain of the utility model should not be regarded as and only limit to the concrete form that embodiment states, the protection domain of the utility model also reach in those skilled in the art according to the utility model design the equivalent technologies means that can expect.
Claims (2)
1. can be integrated in the electric energy meter drawing lock automatic testing circuit of correction platform; It is characterized in that: comprise the optocoupler that is connected with the drawing lock module of electric energy meter; Be connected with optocoupler, be in and operate a switch or the CPU of "on" position and the electric energy meter state that CPU obtains is uploaded to the communication module of host computer to detect electric energy meter;
The input end of described optocoupler is connected with the drawing lock module of electric energy meter, and the output terminal of described optocoupler is connected with CPU, is provided with relay between described optocoupler and the described CPU.
2. the electric energy meter drawing lock automatic testing circuit that is integrated in correction platform as claimed in claim 1, it is characterized in that: described communication module is 485 communication modules.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202066433U CN202119896U (en) | 2011-06-17 | 2011-06-17 | Electric energy meter switching on/off automatic test circuit integrated on calibration bench |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202066433U CN202119896U (en) | 2011-06-17 | 2011-06-17 | Electric energy meter switching on/off automatic test circuit integrated on calibration bench |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202119896U true CN202119896U (en) | 2012-01-18 |
Family
ID=45460950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202066433U Expired - Lifetime CN202119896U (en) | 2011-06-17 | 2011-06-17 | Electric energy meter switching on/off automatic test circuit integrated on calibration bench |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202119896U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102338864A (en) * | 2011-06-17 | 2012-02-01 | 杭州炬华科技股份有限公司 | Automatic electric energy meter switching-out or switching-on test circuit capable of being integrated into meter calibrating table |
CN106251599A (en) * | 2016-08-05 | 2016-12-21 | 中国南方电网有限责任公司电网技术研究中心 | Take remote control function method of testing and the system of control electric energy meter |
CN108535639A (en) * | 2018-03-27 | 2018-09-14 | 江苏卡欧万泓电子有限公司 | A kind of method of automatic detection intelligent electric meter relay switching on |
-
2011
- 2011-06-17 CN CN2011202066433U patent/CN202119896U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102338864A (en) * | 2011-06-17 | 2012-02-01 | 杭州炬华科技股份有限公司 | Automatic electric energy meter switching-out or switching-on test circuit capable of being integrated into meter calibrating table |
CN106251599A (en) * | 2016-08-05 | 2016-12-21 | 中国南方电网有限责任公司电网技术研究中心 | Take remote control function method of testing and the system of control electric energy meter |
CN108535639A (en) * | 2018-03-27 | 2018-09-14 | 江苏卡欧万泓电子有限公司 | A kind of method of automatic detection intelligent electric meter relay switching on |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204228887U (en) | A kind of power equipment and the comprehensive on-line monitoring system of transmission line malfunction | |
CN202119896U (en) | Electric energy meter switching on/off automatic test circuit integrated on calibration bench | |
CN205581232U (en) | Portable arc light protection testing arrangement | |
CN203870190U (en) | Fiber-style grounding and short-circuit fault indicator | |
CN104637238A (en) | Transformer substation terminal box and mechanism box heating moisture-dispelling alarm device | |
CN204086435U (en) | A kind of microcomputer relay protection tester | |
CN204287425U (en) | Mine Switch operating condition observation circuit | |
CN103658056B (en) | Automatic miss detection method for an electric meter screw | |
CN102338864A (en) | Automatic electric energy meter switching-out or switching-on test circuit capable of being integrated into meter calibrating table | |
CN202149937U (en) | Electric energy meter calibrating device and calibrating system | |
CN104569679A (en) | No-load durability testing system for electric tool and gardening tool | |
CN105608843A (en) | Combustible gas alarm control system | |
CN203849387U (en) | Switch power supply repetition switch testing circuit of power supply adapter | |
CN203572907U (en) | Leakage protector without trip and power cut in leakage test | |
CN203911498U (en) | Distributed photovoltaic grid-connected protective equipment | |
CN206684269U (en) | Test board weighs electrifying device automatically | |
CN202197083U (en) | Warming furnace open-phase protection control system | |
CN205038276U (en) | Intelligence boundary switch computer protection device output functional test platform | |
CN202067689U (en) | Physical on-off state detection device for electricity protection return circuit | |
CN106207992B (en) | A kind of control method of the control system of fuse switch | |
CN205027490U (en) | Power station unit oil leak detection device | |
CN204947580U (en) | A kind of A.C. contactor protective device | |
CN204065265U (en) | Can the circuit of time opening hf channel testing circuit | |
CN203164646U (en) | Intelligent transformer | |
CN202975255U (en) | Apparatus for testing transistor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP02 | Change in the address of a patent holder |
Address after: 310030 No. 9 Longtan Road, front street, Yuhang District, Zhejiang, Hangzhou Patentee after: Hangzhou Sunrise Technology Co., Ltd. Address before: Hangzhou City, Zhejiang province 310030 West Lake science and Technology Park West eight road No. 2 Yinjiang Software Park building C Patentee before: Hangzhou Sunrise Technology Co., Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20120118 |
|
CX01 | Expiry of patent term |