CN202116185U - Hoisting clamp of long shaft parts - Google Patents

Hoisting clamp of long shaft parts Download PDF

Info

Publication number
CN202116185U
CN202116185U CN2011201668356U CN201120166835U CN202116185U CN 202116185 U CN202116185 U CN 202116185U CN 2011201668356 U CN2011201668356 U CN 2011201668356U CN 201120166835 U CN201120166835 U CN 201120166835U CN 202116185 U CN202116185 U CN 202116185U
Authority
CN
China
Prior art keywords
major axis
long shaft
hoisting
shaft parts
grapple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201668356U
Other languages
Chinese (zh)
Inventor
张立东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI YOUSIWEIKE PETROLEUM DRILLING TOOLS CO Ltd
Original Assignee
WUXI YOUSIWEIKE PETROLEUM DRILLING TOOLS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI YOUSIWEIKE PETROLEUM DRILLING TOOLS CO Ltd filed Critical WUXI YOUSIWEIKE PETROLEUM DRILLING TOOLS CO Ltd
Priority to CN2011201668356U priority Critical patent/CN202116185U/en
Application granted granted Critical
Publication of CN202116185U publication Critical patent/CN202116185U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

Provided is a hoisting clamp of long shaft parts. A steel cable and a hoisting ring are disposed at the upper portion of a beam, at least a plurality of groups of connecting pieces are arranged at the lower portion of the beam, one ends of the connecting pieces are fixed on the beam, and the other ends of the connecting pieces are connected to C-shaped claw hooks through a pin shaft. The groups of claw hooks are parallel to each other. The special hoisting clamp of long shaft parts is stable and reliable in hoisting and carrying, capable of carrying a plurality of long shaft parts simultaneously, high in efficiency, and good in safety.

Description

Major axis spare hoisting fixture
Technical field
The utility model relates to a part Fabricating machinery field, especially a kind of major axis spare hoisting fixture.
Background technology
For example length is greater than the steel pipe plug of 10m for major axis spare, and length is long, Heavy Weight, and therefore lifting carrying difficulty is very big; When adopting common driving grab bucket to carry, be difficult to guarantee its stability, cause tilting perhaps to topple; Defective work piece is when serious even safety misadventure takes place.
The utility model content
The applicant is difficult to difficulties such as lifting carrying to above-mentioned existing major axis spare, a kind of rational in infrastructure, easy to operate major axis spare hoisting fixture is provided, thus the lifting carrying of carrying out major axis spare that can be safe.
The technical scheme that the utility model adopted is following:
A kind of major axis spare hoisting fixture is provided with wirerope and hoisting ring on crossbeam top, and some groups of connecting straps at least are set in the crossbeam bottom, and connecting strap one end is fixed on the crossbeam, and the other end is connected with " C " type grapple through bearing pin, and each is organized grapple and is parallel to each other.It is further characterized in that:
Said connecting strap and grapple are provided with two groups at least.
The beneficial effect of the utility model is following:
The special-purpose hoisting fixture of the major axis spare of the utility model, the lifting carrying is reliable and stable, and can carry many major axis spares simultaneously, and efficient is high, and safety is good.
Description of drawings
Fig. 1 is the front view of the utility model.
Fig. 2 is the section drawing of grapple in working order time the among Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the utility model is described.
Like Fig. 1, shown in Figure 2; Crossbeam 2 tops of the described major axis spare hoisting fixture of the utility model are provided with wirerope and hoisting ring 1; At least two group connecting straps 3 are set in crossbeam 2 bottoms; Connecting strap 3 one ends are fixed on the crossbeam 2, and the other end is connected with " C " type grapple 4 through bearing pin 5, organizes grapple 4 more and is parallel to each other.During real work; The utility model is moved near the major axis spare 6, is that centre of gration is rotated with grapple 4 with bearing pin 5, makes its open end insert major axis spare 6 bottoms; After many groups grapple 4 all gets into major axis spare 6 bottoms; Lift by crane, under the effect of major axis spare gravity, grapple 4 carries out balance automatically and has guaranteed the stability and security of carrying.Adopt the structure of the utility model, can lift by crane three major axis spares of carrying simultaneously, as shown in Figure 2, handling efficiency is high, and safe and reliable.
More than describing is the explanation to the utility model, is not the qualification to utility model, and the utility model institute restricted portion is referring to claim, and under the situation of the utility model spirit, the utility model can be done any type of modification.

Claims (2)

1. major axis spare hoisting fixture; It is characterized in that: be provided with wirerope and hoisting ring on crossbeam top, some groups of connecting straps at least are set in the crossbeam bottom, connecting strap one end is fixed on the crossbeam; The other end is connected with " C " type grapple through bearing pin, and each is organized grapple and is parallel to each other.
2. according to the described major axis spare hoisting fixture of claim 1, it is characterized in that: connecting strap and grapple are provided with two groups at least.
CN2011201668356U 2011-05-24 2011-05-24 Hoisting clamp of long shaft parts Expired - Fee Related CN202116185U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201668356U CN202116185U (en) 2011-05-24 2011-05-24 Hoisting clamp of long shaft parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201668356U CN202116185U (en) 2011-05-24 2011-05-24 Hoisting clamp of long shaft parts

Publications (1)

Publication Number Publication Date
CN202116185U true CN202116185U (en) 2012-01-18

Family

ID=45457268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201668356U Expired - Fee Related CN202116185U (en) 2011-05-24 2011-05-24 Hoisting clamp of long shaft parts

Country Status (1)

Country Link
CN (1) CN202116185U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103803396A (en) * 2012-11-06 2014-05-21 天工爱和特钢有限公司 Finished flat steel spreader
CN111731980A (en) * 2020-05-26 2020-10-02 河南新开源石化管道有限公司 Hoisting device for heating round core rod for titanium alloy elbow processing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103803396A (en) * 2012-11-06 2014-05-21 天工爱和特钢有限公司 Finished flat steel spreader
CN111731980A (en) * 2020-05-26 2020-10-02 河南新开源石化管道有限公司 Hoisting device for heating round core rod for titanium alloy elbow processing

Similar Documents

Publication Publication Date Title
CN205381872U (en) Aircraft fuselage turning device
CN201217608Y (en) Integral component suspending beam for hoisting
CN202116185U (en) Hoisting clamp of long shaft parts
CN202107425U (en) Oil drum sling
CN206088728U (en) Novel large -scale gallows of taking a trial run
CN202829301U (en) Steel rail hoisting tool
CN202022652U (en) Device capable of fast lifting oil tanks in group
CN203419690U (en) Manual earthquake rescuing machine
CN203513086U (en) Special lifting appliance for long-bundle-shaped material
CN202465030U (en) Lock-type steel sheet clamping apparatus
CN101734549A (en) Lifting sling
CN205555857U (en) Portable hoisting structure
CN201619944U (en) Sling instrument
CN203229308U (en) Ultra-long tubular hanger
CN202265297U (en) Lifting beam
CN202321961U (en) Novel connecting shackle
CN202659269U (en) Mine conveyor hoisting device
CN201961955U (en) Dual C-shaped lifting sling for rolling plate
CN201351098Y (en) Lifting frame of automobile lifter
CN202924578U (en) Special hoisting device for ship clearing machinery
CN203867276U (en) Internal suspension derrick detachable spherical hinge type bearing base
CN202116190U (en) Hoisting tool of oversized casting
CN204096893U (en) The diesel powerplant suspender of diesel locomotive
CN202518936U (en) Handling device for pipe fittings
CN215905704U (en) Novel PE pipe production is got with lifting clamp device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20160524

CF01 Termination of patent right due to non-payment of annual fee