CN202108259U - Vertical thread suspending instrument for wall - Google Patents
Vertical thread suspending instrument for wall Download PDFInfo
- Publication number
- CN202108259U CN202108259U CN201120197213XU CN201120197213U CN202108259U CN 202108259 U CN202108259 U CN 202108259U CN 201120197213X U CN201120197213X U CN 201120197213XU CN 201120197213 U CN201120197213 U CN 201120197213U CN 202108259 U CN202108259 U CN 202108259U
- Authority
- CN
- China
- Prior art keywords
- vertical
- bar
- wall
- instrument
- spherical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a vertical thread suspending instrument for a wall used in building construction. The vertical thread suspending instrument comprises a vertical supporting rod (7), wherein a cross rod (6) is arranged on the supporting rod (7); markings are arranged on the cross rod (6); and an adjusting and fixing device (8), a fixing seat (9) and a fixing pillar are arranged at the lower part of the supporting rod (7). Compared with the prior art, the utility model has the advantage that a fiducial line or a fiducial point can be fixedly arranged through the vertical thread suspending instrument before wall building in the building construction, so that the deflection of the verticality of the wall can be avoided to the utmost extent, and the construction quality is further guaranteed.
Description
Technical field
The utility model relates to the vertical celling instrument of body of wall that a kind of building operations is used.
Background technology
At present, in building operations, in the body of wall verticality observation of building by laying bricks or stones; Mainly be to rely on human factor to operate, all be building wall behind certain altitude, the vertical line that weighs down with taper again comes comparative observation; Owing to be the verticality of artificial observation body of wall, error also appears unavoidably, if deviation vertically appears in body of wall; The body of wall that has puzzled must be removed heavily and build, and has so both delayed work and has mistaken, again waste material; Use the verticality of vertical instrument measurement body of wall besides; But also can only be the verticality of measuring the body of wall of having built by laying bricks or stones, also not have operable vertical line and the instrument of observing or monitor the body of wall verticality of when body of wall begins to build by laying bricks or stones, just being provided with at present, bring certain difficulty to construction.
Summary of the invention
The purpose of the utility model provides a kind of in building operations, can when the beginning masonry panel, just stationary monitoring point or line can be set, and the vertical celling instrument of body of wall of vertical missing in building process, occurs to avoid body of wall.
The purpose of the utility model realizes through following technical scheme: comprise vertical support bar (7); Support bar (7) is provided with at least one cross bar (6) vertical with respect to support bar (7); Cross bar (6) is provided with marker line (3); The bottom of support bar (7) is provided with regulates fastening devices (8), holder (9) and spud pile, and said adjusting fastening devices (8) is a ball-shaped cloud platform, and said ball-shaped cloud platform comprises spherical base and the spherical that can in this spherical base, rotate; The pedestal of said ball-shaped cloud platform is connected with holder (9); Support bar (7) is connected on the spherical of ball-shaped cloud platform, and said holder (9) is a cylindricality tubular body, and spud pile is made up of built-in fitting (1) and connector (10); Built-in fitting (1) is can pre-buried pile body in body of wall, and connector (10) is for corresponding with the pore shape of holder (9) cylindricality tubular body and can be fixed in the column in the pore.
As improvement, above-mentioned marker line (3) preferably are arranged on the plumbing bar (4) of a hard, and this plumbing bar (4) is suspended on the cross bar (6) through suspension gear (5).
Above-mentioned suspension gear (5) can be made up of spherical base and the spherical that can in this spherical base, rotate, and spherical base is connected with plumbing bar (4) or cross bar (6) respectively with spherical; Described suspension gear (5) also can be made up of axle sleeve and the axle that can in this axle sleeve, rotate, and axle sleeve is connected with plumbing bar (4) or cross bar (6) respectively with axle; Described suspension gear (5) also can be soft line, and the two ends of line are connected with axle with axle sleeve respectively.
As further improvement, above-mentioned support bar (7) is preferably telescopic bar, and described plumbing bar (4) preferably also should be telescopic bar mutually.
As further improvement, preferably be provided with balance weight (11) on the spherical of above-mentioned adjusting fastening devices (8) ball-shaped cloud platform, to realize indicating automatically the function of vertical line.
Compared with prior art, before the beginning masonry panel of the utility model in building operations, just fixedly install directrix or point through instrument, vertical missing appears in the body of wall that can avoid largely building by laying bricks or stones, and then guarantees the quality of construction.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment 1.
Fig. 2 is the right view of Fig. 1.
Fig. 3 is the structural representation of the utility model embodiment 1 spud pile.
Fig. 4 is the structural representation of the utility model embodiment 2.
The structural representation of Fig. 5 the utility model embodiment 3.
Fig. 6 is the structural representation of the utility model embodiment 4.
Fig. 7 is the left view of Fig. 6.
Fig. 8 is the structural representation of the utility model embodiment 5.
Fig. 9 is the structural representation of Fig. 8 A-A section.
Figure 10 is the structural representation of the utility model embodiment 6.
Figure 11 is the structural representation of the spud pile of the utility model embodiment 7.
Figure 12 is the structural representation of the spud pile of the utility model embodiment 8.
Figure 13 is the structural representation of the utility model embodiment 9.
Figure 14 is the structural representation of the spud pile of the utility model embodiment 9.
Figure 15 is the structural representation of the spud pile of the utility model embodiment 10.
Shown in the figure: 1 is built-in fitting, and 2 is pole, and 3 is marker line, and 4 is plumbing bar, and 5 is suspension gear, and 6 is cross bar, and 7 is support bar, and 8 for regulating fastening devices, and 9 is holder, and 10 is connector, and 11 is balance weight, and 12 is vertical collimator, and 13 is level gauge.
The specific embodiment
Embodiment: with reference to accompanying drawing 1~3, be the structural representation of the utility model embodiment 1, comprise vertical support bar 7; Support bar 7 is provided with a cross bar 6 vertical with respect to support bar 7, through suspension gear 5 suspentions plumbing bar 4 is arranged on the cross bar 6, and the two ends up and down of plumbing bar 4 respectively are provided with a pole 2; Described marker line 3 are connected on the pole 2, and described suspension gear 5 is made up of spherical base and the spherical that can in this spherical base, rotate, and spherical base is connected with cross bar 6; Spherical is connected with plumbing bar 4, and the bottom of support bar 7 is provided with regulates fastening devices 8, holder 9 and spud pile, and said adjusting fastening devices 8 is a ball-shaped cloud platform; Said ball-shaped cloud platform comprises spherical base and the spherical that can in this spherical base, rotate, and the pedestal of said ball-shaped cloud platform is connected with holder 9, and support bar 7 is connected on the spherical of ball-shaped cloud platform; Said holder 9 is a cylindrical tubular body; Spud pile is made up of built-in fitting 1 and connector 10, and built-in fitting 1 is a tabular pile body, can be pre-buried in body of wall; Connector 10 is and the corresponding cylinder of pore shape of holder 9 cylindrical tubular bodies, can be fixed in the pore.
Embodiment 2: with reference to accompanying drawing 4, be the structural representation of embodiment 2, compare with embodiment 1 that the difference of present embodiment is: described support bar 7 is telescopic bar, and described plumbing bar 4 also should be telescopic bar mutually.
Embodiment 3: with reference to accompanying drawing 5; Be the structural representation of embodiment 3, compare with embodiment 1 that the difference of present embodiment is: described support bar 7 is telescopic bar; The merchant symmetry up and down of support bar 7 respectively is provided with two cross bars 6 vertical with respect to support bar 7; Said marker line 3 are directly connected on the cross bar 6, and on support bar 7, are provided with vertical collimator 12, and cross bar 2 is provided with level gauge 13.
Embodiment 4: with reference to accompanying drawing 6, Fig. 7; Structural representation for embodiment 4; Compare with embodiment 1, the difference of present embodiment is: described suspension gear 5 is made up of axle sleeve and the axle that can in this axle sleeve, rotate, and axle sleeve is connected with plumbing bar 4 or cross bar 6 respectively with axle.
Embodiment 5: with reference to accompanying drawing 8, Fig. 9; Be the structural representation of embodiment 5, compare with embodiment 1 that the difference of present embodiment is: described suspension gear 5 is soft line; The two ends of line are connected with axle with axle sleeve respectively; Simultaneously, the two ends up and down of described plumbing bar 4 are cross and respectively are provided with 4 poles 2, and also corresponding 4 rhizospheres that are provided with of described marker line 3 are around plumbing bar 4.
Embodiment 6: with reference to accompanying drawing 10; Structural representation for embodiment 6; Compare with embodiment 1, the difference of present embodiment is: described support bar 7 is telescopic bar, and the symmetry of merchant up and down of support bar 7 respectively is provided with two cross bars 6 vertical with respect to support bar 7; Said marker line 3 are directly connected on the cross bar 6; The both sides of the pedestal of said ball-shaped cloud platform respectively are provided with the holder 9 of a cylindrical tubular, and the bottom of the spherical of described adjusting fastening devices 8 ball-shaped cloud platforms is provided with balance weight 11, can realize the function of automatic adjustment marks line 3 verticality through balance weight 11.
Embodiment 7: with reference to accompanying drawing 11; Structural representation for the spud pile of the utility model embodiment 7; Compare with embodiment 1, the difference of present embodiment is: the built-in fitting 1 of described spud pile is the lath of bending, is applicable to positions uses such as window, doorway, column.
Embodiment 8: with reference to accompanying drawing 12; Structural representation for the spud pile of the utility model embodiment 8; Compare with embodiment 1; The difference of present embodiment is: the built-in fitting 1 of described spud pile is the cross lath, and is provided with columned connector 10 in the pairing the other end of described cross lath, is applicable to positions uses such as window, doorway, column.
Embodiment 9: with reference to accompanying drawing 13, Figure 14, be the structural representation of the utility model embodiment 9, compare with embodiment 1 that the difference of present embodiment is: said holder 9 is a rectangular tubular body, and connector 10 also should be rectangular column shape body mutually.
Embodiment 10: with reference to accompanying drawing 15; Structural representation for the spud pile of the utility model embodiment 10; Compare with embodiment 9, the difference of present embodiment is: the built-in fitting 1 of described spud pile is the lath of bending, is applicable to positions uses such as window, doorway, column.
Claims (10)
1. vertical celling instrument of body of wall; It is characterized in that: comprise vertical support bar (7); Support bar (7) is provided with at least one cross bar (6) vertical with respect to support bar (7), and cross bar (6) is provided with marker line (3), and the bottom of support bar (7) is provided with regulates fastening devices (8), holder (9) and spud pile; Said adjusting fastening devices (8) is a ball-shaped cloud platform; Said ball-shaped cloud platform comprises spherical base and the spherical that can in this spherical base, rotate, and the pedestal of said ball-shaped cloud platform is connected with holder (9), and support bar (7) is connected on the spherical of ball-shaped cloud platform; Said holder (9) is a cylindricality tubular body; Spud pile is made up of built-in fitting (1) and connector (10), and built-in fitting (1) be can pre-buried pile body in body of wall, and connector (10) is that the pore shape with holder (9) cylindricality tubular body is corresponding and can be fixed in the column in the pore.
2. the vertical celling instrument of body of wall according to claim 1 is characterized in that: described marker line (3) are arranged on the plumbing bar (4) of a hard, and this plumbing bar (4) is suspended on the cross bar (6) through suspension gear (5).
3. the vertical celling instrument of body of wall according to claim 2; It is characterized in that: described suspension gear (5) is made up of spherical base and the spherical that can in this spherical base, rotate, and spherical base is connected with plumbing bar (4) or cross bar (6) respectively with spherical.
4. the vertical celling instrument of body of wall according to claim 2 is characterized in that: described above-mentioned suspension gear (5) is made up of axle sleeve and the axle that can in this axle sleeve, rotate, and axle sleeve is connected with plumbing bar (4) or cross bar (6) respectively with axle.
5. the vertical celling instrument of body of wall according to claim 2 is characterized in that: described suspension gear (5) also can be soft line, and the two ends of line are connected with axle with axle sleeve respectively.
6. according to claim 1,2,3, the vertical celling instrument of 4 or 5 described bodies of wall, it is characterized in that: described support bar (7) is telescopic bar.
7. according to claim 2,3, the vertical celling instrument of 4 or 5 described bodies of wall, it is characterized in that: described plumbing bar (4) is telescopic bar.
8. according to claim 1,2,3, the vertical celling instrument of 4 or 5 described bodies of wall, it is characterized in that: the spherical of described adjusting fastening devices (8) ball-shaped cloud platform is provided with balance weight (11).
9. the vertical celling instrument of body of wall according to claim 6 is characterized in that: the spherical of described adjusting fastening devices (8) ball-shaped cloud platform is provided with balance weight (11).
10. the vertical celling instrument of body of wall according to claim 7 is characterized in that: the spherical of described adjusting fastening devices (8) ball-shaped cloud platform is provided with balance weight (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120197213XU CN202108259U (en) | 2011-06-13 | 2011-06-13 | Vertical thread suspending instrument for wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120197213XU CN202108259U (en) | 2011-06-13 | 2011-06-13 | Vertical thread suspending instrument for wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202108259U true CN202108259U (en) | 2012-01-11 |
Family
ID=45433695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120197213XU Expired - Fee Related CN202108259U (en) | 2011-06-13 | 2011-06-13 | Vertical thread suspending instrument for wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202108259U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808523A (en) * | 2012-07-03 | 2012-12-05 | 焦二信 | Double-line vertical instrument |
-
2011
- 2011-06-13 CN CN201120197213XU patent/CN202108259U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808523A (en) * | 2012-07-03 | 2012-12-05 | 焦二信 | Double-line vertical instrument |
CN102808523B (en) * | 2012-07-03 | 2015-09-09 | 焦二信 | Double-line vertical instrument |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205561851U (en) | Detect hang down straightness's instrument of form setting | |
CN204421906U (en) | The precision prism bar that remote cooperation total powerstation uses | |
CN102808523B (en) | Double-line vertical instrument | |
CN202108259U (en) | Vertical thread suspending instrument for wall | |
CN102116090B (en) | Wall body perpendicularity line hanging instrument | |
CN108225263B (en) | Elevation vertical transfer device and method for measuring elevation by using same | |
CN205580457U (en) | Hang down straightness's 360 rotating prism of survey building | |
CN211667508U (en) | Level gauge for supervision of constructional engineering | |
CN211502069U (en) | Combined engineering measuring instrument | |
CN202215000U (en) | Wall vertical alignment instrument | |
CN204512858U (en) | Large-size air conditioning noise subtest tripod | |
CN210952832U (en) | Surveying instrument positioning device | |
CN211779967U (en) | Civil engineering measuring device | |
CN204059966U (en) | Bracing or strutting arrangement and high-supported formwork support system | |
CN206959880U (en) | Erecting support for concentricity measuring instrument | |
CN105424004A (en) | Multifunctional laser vertical level bar | |
CN212988332U (en) | Base structure of leveling instrument staff | |
CN207248151U (en) | A kind of adjustable Sopwith staff | |
CN205785203U (en) | A kind of levelling rod for pit retaining monitoring | |
CN207351434U (en) | Fine-tuning angle level ceremony height measurer | |
CN206330577U (en) | A kind of mobile integrated concrete measuring table | |
CN207026541U (en) | It is removable just to adjust exhausting duct suspension rod drilling frame | |
CN218845651U (en) | Supporting foot frame for engineering measurement | |
CN205745930U (en) | A kind of levelling rod leveling fixing device | |
CN216921437U (en) | Auxiliary positioning device for mounting stone curtain wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120111 Termination date: 20120613 |