CN202100021U - Transverse crack reinforcing device for reinforced concrete electric pole with circular section - Google Patents

Transverse crack reinforcing device for reinforced concrete electric pole with circular section Download PDF

Info

Publication number
CN202100021U
CN202100021U CN2011201909456U CN201120190945U CN202100021U CN 202100021 U CN202100021 U CN 202100021U CN 2011201909456 U CN2011201909456 U CN 2011201909456U CN 201120190945 U CN201120190945 U CN 201120190945U CN 202100021 U CN202100021 U CN 202100021U
Authority
CN
China
Prior art keywords
pole
crack
clamps
bolts
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201909456U
Other languages
Chinese (zh)
Inventor
张都清
吕天光
张广成
李勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority to CN2011201909456U priority Critical patent/CN202100021U/en
Application granted granted Critical
Publication of CN202100021U publication Critical patent/CN202100021U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a transverse crack reinforcing device for a reinforced concrete electric pole with a circular section, which comprises two pairs of pole clamps which are connected through bolts. Each pair of pole clamps consists of two arc clamps matched with each other, the two arc clamps are connected with each other by the aid of bolts, and a cylindrical cavity is formed between the two arc clamps. During use, when a transverse crack is formed on the reinforced concrete electric pole, the two pairs of pole clamps are respectively mounted on the upper portion and the lower portion of a pole body with the transverse crack, the bolts for connecting the arc clamps are screwed on firstly, radial stress is applied to the crack of the pole body so as to fix the arc clamps, and then bolt distance between the two pairs of pole clamps respectively arranged on the upper portion and the lower portion of the pole body can be adjusted, the bolts can be screwed to apply axial force to the crack on the pole body, so that expansion of the crack can be prevented and the structural rigidity and strength of the pole body are enhanced. Compared with the prior art, the transverse crack reinforcing device has the advantages that the maximum stress value is reduced while expansion of the crack is avoided after reinforcing operation is completed by the aid of the transverse crack reinforcing device; and the transverse crack reinforcing device is simple in operation, free of power interruption and low in cost.

Description

A kind of ring section reinforced concrete pole transverse cracks bracing means that is used for
Technical field
The utility model relates to a kind of ring section reinforced concrete pole transverse cracks bracing means that is used for.
Background technology
At present, in China's most of areas, most of 110kv (and following) ultra-high-tension power transmission line adopts the part anchor support except that special location, special leap, all adopts steel reinforced concrete pole.The reinforced concrete pole of ultra-high-tension power transmission line mainly is made up of steel concrete mobile jib, steel concrete fork beam or steel fork beam, backguy and cross-arm etc., and the steel concrete mobile jib has isometrical and two kinds of tapers (dialling the tip), and general bar section by 6m or 9m is welded.
China's transmission line of electricity uses reinforced concrete pole, and the history in existing 50~60 years has all accumulated rich experience at aspects such as design, manufacturing, installation, operation maintenance.But,, reflect also in the practice that this form of structure of reinforced concrete pole exists some need study and the problem that further solves really along with the growth of pole tower operation time and operation, the operation of new bar.
Under same condition, steel reinforced concrete pole is more damaged than other concrete steel buildings, aging speed is fast, and application life is short.Electric pole top is general damaged slight.But it is the most serious near ground, the general breakage of electric pole part more than the face of land.Concrete frame ftractures and crackle generally occurs in down, the stage casing, and crack width is 0.1~10mm, and length does not wait to bar section total length from 0.3m; Perhaps: the bar section produces circumferential crack around part hoop or the edge, and these phenomenons generally also occur in down the stage casing; Or: generally aging, carbonization, the loose variable color of burn into material appear in the bar section, and intensity descends, and often closely the breakage of face portion burn into is comparatively serious, and the electric pole bottom occurs that large and small different bulk is peeled off, hollowing and main reinforcement, the serious corrosion of stirrup etc.In above-mentioned these damaged forms, with the bar section produce lobe and longitudinal crack problem comparatively generally, the most outstanding, have in addition new line cracking and crack problem all appear, quickened wearing out of shaft tower, obviously shortened service life.
The principal element of steel concrete development that shaft tower cracks is: wind shakes, wind pendulum, frost heave, temperature alternating and corrosion of steel bar.Under, the effect year after year multiple once, constantly develop into long and wide crack in these factors time.Aging, the carbonization of steel concrete shaft tower, corrosion breakage under similarity condition than aging, the damaged fast main cause of other reinforced concretes; Except that extraneous environment is abominable really; Also have bar section concrete protective layer thickness less than normal, main muscle and stirrup are often near external surface.Add that carbonization, corrosion of steel bar, three kinds of destructions of cracking interact, form vicious circle, cause shaft tower than damaged fast, the life-span weak point of other steel concrete.The damaged reason of steel concrete shaft tower and damaged form are very complicated, carbonization, aging, frost heave circulation, the corrosion of reinforcing bar and derivation property cracking is normally, inevitably, need just can take place behind certain time limit.Yet the structural failure crack of shaft tower is along with the increasing of rod member, the increase of slenderness ratio, " bamboo is split effect " just produce after progressively manifesting.This breakage generally occurs in newly-built or running time of the long circuit, makes other damaged forms obtain quickening and arriving in advance, with the application life that shortens shaft tower greatly.Therefore, the prevention and the processing of ultra-high-tension power transmission line steel concrete shaft tower lobe are vital for long-term safety, the economical operation of circuit.
Reinforcement measure to steel concrete shaft tower crackle is damaged is generally oozed crackle enforcement filling through adopting high-strength clay and height to ooze waterproof agent, to eliminate the cutting damage in crack as far as possible.It is bigger, consuming time longer that this method is implemented engineering quantity, owing to irritate that to ooze back cement tissue odds even, causes stress to concentrate simultaneously, and to preventing the cracks can spread poor effect, tower structure intensity is difficult to guarantee.
Summary of the invention
To above-mentioned prior art, the utility model provides a kind of ring section reinforced concrete pole transverse cracks bracing means that is used for.
The utility model is realized through following technical scheme:
A kind of ring section reinforced concrete pole transverse cracks bracing means that is used for comprises the binary link folder, connects through bolt between the binary link folder; Every secondary bar cramp is to be made up of two arc clips that cooperatively interact, and connects through bolt between two arc clips, forms a cylindrical cavity between two arc clips.
Preferably, connect through four bolts between the said binary link folder, one group in twos on four bolts are divided into two groups, are distributed in arc clip both sides.
Preferably, connect through four bolts between said two arc clips, one group in twos on four bolts are divided into two groups, are distributed in arc clip both sides.
Use: when transverse cracks appears in the ring section reinforced concrete pole, the bar cramp of one copy utility model respectively is installed, is tightened the bolt that connects the arc clip earlier at body of the tower cracks upper-lower position; The shaft cracks is applied radial stresses with fixing arc clip; Regulate the bolt distance between the binary link folder up and down again, tighten, the shaft cracks is applied axial force; Prevent cracks can spread, increase the shaft rigidity of structure and intensity simultaneously.
In the practical application,, the operation conditions behind the strutting of pole is carried out complete detection through to shaft multiple spot vibration survey and foundation vibrations and mechanics strain measurement.Detect the back result and show that Scheme of Strengthening has obtained extraordinary effect.
Compared with prior art, the beneficial effect of the utility model is: after reinforcement was accomplished, maximum stress value reduced, and crackle is no longer expanded simultaneously, and simple to operation, need not have a power failure, and cost is low.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the user mode reference diagram of the utility model.
Wherein, 1, bar cramp; 2, bolt; 3, arc clip; 4, transverse cracks.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described.
A kind of ring section reinforced concrete pole transverse cracks bracing means that is used for comprises binary link folder 1, connects through bolt 2 between the binary link folder 1; Every secondary bar cramp 1 is to be made up of two arc clips 3 that cooperatively interact, and connects through bolt 2 between two arc clips 3, forms a cylindrical cavity between two arc clips 3.
Connect through four bolts 2 between the said binary link folder 1, one group in twos on four bolts 2 are divided into two groups, are distributed in arc clip 3 both sides.
Connect through four bolts 2 between said two arc clips 3, one group in twos on four bolts 2 are divided into two groups, are distributed in arc clip 3 both sides.
Use: when transverse cracks 4 appears in the ring section reinforced concrete pole, the bar cramp 1 of one copy utility model respectively is installed, is tightened the bolt 2 that connects arc clip 3 earlier at body of the tower cracks upper-lower position; The shaft cracks is applied radial stresses with fixing arc clip 3; Binary link presss from both sides 1 bolt 2 distances about regulating again, tightens, and the shaft cracks is applied axial force; Prevent cracks can spread, increase the shaft rigidity of structure and intensity simultaneously.
In the practical application,, the operation conditions behind the strutting of pole is carried out complete detection through to shaft multiple spot vibration survey and foundation vibrations and mechanics strain measurement.Detect the back result and show that Scheme of Strengthening has obtained extraordinary effect.

Claims (3)

1. one kind is used for ring section reinforced concrete pole transverse cracks bracing means, it is characterized in that: comprise the binary link folder, connect through bolt between the binary link folder; Every secondary bar cramp is to be made up of two arc clips that cooperatively interact, and connects through bolt between two arc clips, forms a cylindrical cavity between two arc clips.
2. a kind of ring section reinforced concrete pole transverse cracks bracing means that is used for according to claim 1 is characterized in that: connect through four bolts between the said binary link folder, one group in twos on four bolts are divided into two groups, are distributed in arc clip both sides.
3. a kind of ring section reinforced concrete pole transverse cracks bracing means that is used for according to claim 1; It is characterized in that: connect through four bolts between said two arc clips; One group in twos on four bolts are divided into two groups, are distributed in arc clip both sides.
CN2011201909456U 2011-06-08 2011-06-08 Transverse crack reinforcing device for reinforced concrete electric pole with circular section Expired - Fee Related CN202100021U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201909456U CN202100021U (en) 2011-06-08 2011-06-08 Transverse crack reinforcing device for reinforced concrete electric pole with circular section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201909456U CN202100021U (en) 2011-06-08 2011-06-08 Transverse crack reinforcing device for reinforced concrete electric pole with circular section

Publications (1)

Publication Number Publication Date
CN202100021U true CN202100021U (en) 2012-01-04

Family

ID=45386039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201909456U Expired - Fee Related CN202100021U (en) 2011-06-08 2011-06-08 Transverse crack reinforcing device for reinforced concrete electric pole with circular section

Country Status (1)

Country Link
CN (1) CN202100021U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276937A (en) * 2013-05-17 2013-09-04 国家电网公司 Temporary electric pole reinforcing device
CN103696609A (en) * 2013-12-02 2014-04-02 国家电网公司 Rapid rush-repair device for steel pipe pole
CN105155834A (en) * 2015-06-21 2015-12-16 王盛娜 Repair clamp for bent metal pipes
CN113118697A (en) * 2021-04-26 2021-07-16 中国石油管道局工程有限公司 Transverse rail quick fixing clamp, device and method for automatic pipeline welding
CN113959856A (en) * 2021-10-25 2022-01-21 福州大学 Test device for simulating longitudinal bending resistance of shield tunnel

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276937A (en) * 2013-05-17 2013-09-04 国家电网公司 Temporary electric pole reinforcing device
CN103696609A (en) * 2013-12-02 2014-04-02 国家电网公司 Rapid rush-repair device for steel pipe pole
CN105155834A (en) * 2015-06-21 2015-12-16 王盛娜 Repair clamp for bent metal pipes
CN107989356A (en) * 2015-06-21 2018-05-04 王振环 A kind of metal tube bending reparation pincers
CN105155834B (en) * 2015-06-21 2018-07-10 杨文娟 A kind of metal tube bending reparation pincers
CN113118697A (en) * 2021-04-26 2021-07-16 中国石油管道局工程有限公司 Transverse rail quick fixing clamp, device and method for automatic pipeline welding
CN113959856A (en) * 2021-10-25 2022-01-21 福州大学 Test device for simulating longitudinal bending resistance of shield tunnel
CN113959856B (en) * 2021-10-25 2023-09-08 福州大学 Test method for simulating longitudinal bending resistance of shield tunnel

Similar Documents

Publication Publication Date Title
CN202100021U (en) Transverse crack reinforcing device for reinforced concrete electric pole with circular section
CN202100022U (en) Reinforcing device used for longitudinal crack of reinforced concrete pole with annular cross section
CN102733640B (en) Base used for fixedly installing light pole, telegraph pole and high-tension wire tower and installation method thereof
CN104631851B (en) A kind of pre-stressed carbon fiber plate tensioning equipment and the method for pre-stressed carbon fiber plate stretch-draw thereof
CN203320978U (en) Tensioning and anchoring device for prestressed carbon fiber sheet reinforced long-span concrete structure
CN104847158B (en) A kind of high strength cement electric pole and preparation method thereof
CN104652242B (en) Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN102505636A (en) Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
CN110388090A (en) A kind of girder pre-stressed shear-resistant reinforcing device of RC based on marmem
CN102409619A (en) Method for improving cross integrity of bridge deck structure of multi-girder type combined small box girder bridge
CN206956519U (en) A kind of steel box girder bridge pave-load layer pre-stress system
CN203548071U (en) Steel concrete composite structured tower
CN202731398U (en) Base for fixedly mounting light pole, telegraph pole and high-tension wire tower
CN210239208U (en) Anchoring structure for pasting carbon fiber plate at bottom of reinforced concrete beam
CN213709512U (en) Novel pressure dispersion type anti-floating anchor rod
CN202644524U (en) Tubular pile steel reinforcement cage mixed with non-prestressed reinforcing steel bar
CN205776317U (en) A kind of power transmission line iron tower foundation attachment structure with deviation-correcting function
CN204000562U (en) The compound rigid frame bridge of a kind of vertical prestressing steel-concrete
CN103556573A (en) Parallel steel stranded wire stay cable tensioning control method
CN204955098U (en) Steering gear of broken line arrangement of reinforcement pre -tensioning system
CN204850482U (en) Anti - stretch -draw pre -compaction instrument of jack
CN110984612A (en) Steel column correcting and fixing structure
CN210827121U (en) Upper and lower subsection embedded temporary connection structure for stand column
CN210104592U (en) Prestressed composite reinforcing structure of pier bent cap
CN209654738U (en) A kind of aerial protection structure for large span pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130320

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130320

Address after: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Patentee after: Shandong Research Inst. of Electric Power

Patentee after: State Grid Corporation of China

Address before: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Patentee before: Shandong Research Inst. of Electric Power

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20180608