CN202099993U - Lift type external scaffold made of square steel pipes - Google Patents

Lift type external scaffold made of square steel pipes Download PDF

Info

Publication number
CN202099993U
CN202099993U CN2011201721396U CN201120172139U CN202099993U CN 202099993 U CN202099993 U CN 202099993U CN 2011201721396 U CN2011201721396 U CN 2011201721396U CN 201120172139 U CN201120172139 U CN 201120172139U CN 202099993 U CN202099993 U CN 202099993U
Authority
CN
China
Prior art keywords
hurdle sheet
square steel
steel pipe
decending
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201721396U
Other languages
Chinese (zh)
Inventor
唐建林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Gu Jian building equipment Leasing Co., Ltd.
Original Assignee
YUNNAN XIRUN INVESTMENT HOLDINGS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN XIRUN INVESTMENT HOLDINGS CO Ltd filed Critical YUNNAN XIRUN INVESTMENT HOLDINGS CO Ltd
Priority to CN2011201721396U priority Critical patent/CN202099993U/en
Application granted granted Critical
Publication of CN202099993U publication Critical patent/CN202099993U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a lift type external scaffold made of square steel pipes, in particular to a lift type scaffold for overhead operation in square steel pipe construction, which consists of at least three lift beams, a main vertical frame, a horizontal supporting frame, a body and a falling protection device. The lift beams are arranged at the same interval, each lift beam consists of a clevis and channel steel, wherein the clevis is fixedly connected with an external wall by at least two wall bolts, and a reinforcing triangle is fixedly connected to the root of the steel channel connected with the clevis. The falling protection device is arranged in the middle of the lift beams, and an electric hoist is mounted below the falling protection device. A channel steel stopper is welded at the end of each lift beam and connected with a guide wheel, the guide wheel is arranged in a groove of a channel steel guide rail of the main vertical frame and is in sliding contact connection with the guide rail, a truss of the horizontal supporting frame, which is welded by square steel pipes, is connected with the body above the same and is also connected with the main vertical frame. The lift type external scaffold made of the square steel pipes is safe and reliable, and has fine integral performance and evident safety effect in firefighting since the body of the external scaffold is formed by means of welding assembly. The lift type external scaffold made of the square steel pipes is simple and convenient in installation and is fast in installation for overhead operation, the body of the external scaffold can be lifted quickly and particularly can be lifted to be in place stably and successfully within one and half hours, and environmental orderliness during construction is realized and favorable for building a safe and civilized construction site. In addition, the external scaffold is formed by one-step processing, is reusable, is light in weight.

Description

A kind of square steel pipe ascending/decending external scaffolding
Technical field
The utility model relates to a kind of square steel pipe building operations work high above the ground raise scaffold.
Technical background
Existing fastener steel tube scaffold adopts fastener to connect the round steel pipe structure and forms; Loaded down with trivial details, the consuming time length of the on-the-spot installation procedure of this scaffold, safety factor is low, the steel use amount big and big to the building site environment pollution; And own wt is heavy, and consumptive material transport amount is big, and the fastener loss is big.
Summary of the invention
The purpose of the utility model is intended to overcome existing scaffold technological deficiency, provide a kind of easy to use, own wt is light, safety factor is high, construction environment is polluted little ascending/decending external scaffolding.
The described square steel pipe ascending/decending of the utility model external scaffolding; Constitute by promoting beam, vertical main frame, horizontal supporting framework, support body and falling proof device; Promoting beam is made up of link plate and channel-section steel; Link plate is fixedly connected with external wall through at least two through-wall bolts, and channel-section steel is connected root and is fixedly connected with the reinforcement set square with link plate; Promote the beam middle part and be provided with falling proof device, its below is equipped with the electric block that the control support body goes up and down; Promote beam end and be welded with the channel-section steel baffle plate, be connected with guide wheel on the baffle plate, guide wheel is positioned at the groove of the channel-section steel guide rail of vertical main frame, is connected with the guide rail sliding-contact, plays the effect that support body goes up and down to lead; The truss that the horizontal supporting framework is welded by square steel pipe is connected with the support body on its top and links to each other with vertical main frame.The guide rail of vertical main frame and the Wedge device in the anti-drop device are collided, and play the effect of fall arrest
Described square steel pipe ascending/decending external scaffolding; Described support body is made up of interior hurdle sheet and outer hurdle sheet; Outer hurdle sheet and interior hurdle sheet are by the frame of being responsible for and transverse tube is formed by connecting; Being fixedly connected with protective screening on the framework of outer hurdle sheet, is the passageway between outer hurdle sheet and the interior hurdle sheet, is connected with hound between hurdle sheet and the interior hurdle sheet outside.
Described square steel pipe ascending/decending external scaffolding, the frame that the plane of support body is formed by connecting outer hurdle sheet and interior hurdle sheet is connected with the lantern frame in the corner of support body, and the lantern frame is the tetragonal body structure.
Porose on the framework of hurdle sheet in described, the hole site between the adjacent interior hurdle sheet is corresponding one by one, and bolt is fixedly connected adjacent interior hurdle sheet in flakes through the hole on the framework.
Porose on the framework of described outer hurdle sheet, the hole site between the adjacent outer hurdle sheet is corresponding one by one, and bolt is fixedly connected adjacent outer hurdle sheet in flakes through the hole on the framework.Interior hurdle sheet and interior hurdle sheet, outer hurdle sheet stagger with the seam that is connected between the outer hurdle sheet each other.
Be connected with reinforced sheet on the described hole.The diagonal member reinforcing rib is arranged on framework.
The guide rail of described lifting beam is connected with vertical square steel pipe of main frame, and minimum connection highly is 12.6-16.2m.
Between the interior hurdle sheet of described square steel pipe ascending/decending external scaffolding support body and the outer hurdle sheet is the passageway, in the passageway, is connected with cat ladder and supplies about the constructor safe ready.
Ascending/decending external scaffolding of the present invention can be installed the lifting beam that at least 3 equidistance are arranged according to the width of scaffold, to realize the integral body lifting to whole scaffold; Promote the beam middle part and be provided with falling proof device, its below is equipped with the electric block that the control support body goes up and down, when needs promote support body; Unclamp the hinge of electric block, start electric block and can realize, get final product when lifting puts in place then the used for electric hoist hinge to be fixed to whole full lifting; If when fixing electronic hinge disengagement or fracture take place, bear the spring of the falling proof device of electric block weight and upspring, the wedge-shaped card sheet falls; Block the main frame guide rail, thereby prevent falling of whole frame body effectively, the support body that can promote adopts square steel pipe to make; And support body processing factory is prefabricated be welded in hurdle sheet framework with outside hurdle sheet framework, for the anti-pressure ability of reinforced frame, on four angles of framework or diagonal angle, be fixedly connected with reinforcing rib; Protective screening on the outer hurdle sheet framework adopts wire lath, adopts press strip and tap bolt to fix on four limits of wire lath, also can weld; Being enhanced to the protective capacities of protective screening, also cracky not under the impact that receives big external force can prevent that the greater weight article from falling; And changed not fireproof defective of traditional nylon wire, farthest guaranteed production safety, in order further to strengthen the protection effect of protective screening; On the framework fixedly on the reinforcing rib, get final product through bolt connection reinforcing press strip again, prefabricated be welded into the outer hurdle sheet of framework and interior hurdle sheet at the construction field (site) only need with bolt the hole on the framework is coupled together and promptly can be assembled into scaffold; Not produce deformation in order protecting to use repeatedly, on the hole of framework, to be fixedly connected reinforced sheet, during installation; The fissure of displacement is installed between a last row hurdle sheet and next the row hurdle sheet, makes the stressed even of whole pin thing frame, has further guaranteed the security performance of scaffold; The present invention is with the little outer hurdle sheet thick stick frame of volume, interior hurdle sheet framework assembled formation, and the pollution when having reduced site construction need not whole building is surrounded greatly when installing and using; The height of support body is merely the 3-5 layer of building floor height, and height requirement lifting or decline according to construction have realized flexible adjustment.Scaffold can be a plane structure, also can be square structure.When scaffold is square structure; The corner of scaffold connects the lantern frame, and the lantern frame is the tetragonal body framework that square steel pipe is welded, on the support body of two adjacent faces, have with interior hurdle sheet with outside corresponding hole, sheet position, hurdle; Then be fixedly connected protective screening on two other face; During installation, only need to fix with bolt, guaranteed the general safety performance of scaffold through the hole.
Square steel pipe ascending/decending external scaffolding of the present invention; Whole frame body consumptive material consumption is compared with the conventional steel lifting false work and is practiced thrift steel 6 percent; And save the fastener material usage, as fastener weight is counted, then the square steel pipe support body has only 79 percent of round steel pipe support body gross weight.Adopt square steel pipe outrigger effects of energy conservation and environmental protection remarkable, play the effect that promotes the building trade innovation and development.In addition, the utility model is safe and reliable, and outer support body is that overall performance is good, has in the whole lifting process through welding assembly unit moulding--the protection of maltilevel securities such as protective screening, falling proof device, and it is perfectly safe to accomplish, and the security against fire effect is obvious; Simple installation is quick, and outer support body is at the terrestrial segment assembled formation, and outer hurdle sheet and interior hurdle sheet connect into framework through horizontal steel pole, and the work high above the ground installation rate is fast; The support body hoisting velocity is fast, in one and a half hours, can steadily promote smoothly to put in place, and environment is in perfect order during constructing operation, and degree of safety is big; Facade is salubrious, and is elegant in appearance, helps creating the safety construction building site, the machine-shaping of outrigger body disposable; In light weight, can repeatedly have enough to meet the need use, advanced technology, execution control is single; Fragmentary construction material such as no fastener, labor and material saving, economical and practical.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 promotes the girder construction sketch map for the present invention.
Fig. 3 promotes the girder construction sketch map for the present invention.
Fig. 4 is for promoting the girder construction sketch map for the present invention.
Fig. 5 is the vertical main frame structure sketch map of the present invention.
Fig. 6 is Fig. 5 plan structure sketch map.
Fig. 7 is an interior hurdle chip architecture sketch map.
Fig. 8 is an outer hurdle chip architecture sketch map.
Fig. 9 is a frame structure sketch map of the present invention.
Among the figure, 1-promotes beam, the vertical main frame of 2-, 3-support body, 4-link plate, 5-channel-section steel, 6-set square; The 7-baffle plate, the 8-guide wheel, hurdle sheet in the 9-guide rail, 10-, the outer hurdle of 11-sheet, 12-is responsible for; The 13-transverse tube, 14-hound, 15-hole, 16-reinforcing rib, 17-reinforced sheet, 18-protective screening.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is done further explanation, but be not limited to embodiment.
Embodiment 1
Shown in Fig. 1-9; Square steel pipe ascending/decending external scaffolding of the present invention; Constitute by promoting beam 1, vertical main frame 2, horizontal supporting framework, support body 3 and falling proof device, promote beam 1 and be made up of link plate 4 and channel-section steel 5, link plate 4 is fixedly connected with external wall through at least two through-wall bolts; Channel-section steel 5 is connected with link plate 4, and root is fixedly connected with strengthens set square 6; Promote beam 1 middle part and be provided with falling proof device, its below is equipped with the electric block that the control support body goes up and down; Promote beam 1 end and be welded with channel-section steel baffle plate 7, be connected with guide wheel 8 on the baffle plate 7, guide wheel 8 is positioned at the groove of the channel-section steel guide rail 9 of vertical main frame 2, is connected with guide rail 9 sliding-contacts, plays the effect that support body goes up and down to lead; The truss that the horizontal supporting framework is welded by square steel pipe is connected with the support body 3 on its top and links to each other with vertical main frame 2, and support body 3 is connected with vertical main frame 2.The guide rail 9 of vertical main frame 2 is collided with the Wedge device in the anti-drop device, plays the effect of fall arrest.Described support body 3 is made up of interior hurdle sheet 10 and outer hurdle sheet 11; Outer hurdle sheet 11 and interior hurdle sheet 10 are by being responsible for 12 frames that are formed by connecting with transverse tube 13; Be fixedly connected with protective screening 18 on the framework of outer hurdle sheet 11; Between outer hurdle sheet 11 and the interior hurdle sheet 10 is the passageway, is connected with hound 14 between hurdle sheet and the interior hurdle sheet outside.The frame that the plane of described side's support body is formed by connecting outer hurdle sheet 11 and interior hurdle sheet 12 is connected with the lantern frame in the corner of support body, and the lantern frame is the tetragonal body structure.Porose 15 on the framework of hurdle sheet 10 in described, adjacent in 15 positions, hole between the hurdle sheet corresponding one by one, bolt through the hole on the framework will be adjacent interior hurdle sheet be fixedly connected in blocks.Porose 15 on the framework of described outer hurdle sheet 11,15 positions, hole between the adjacent outer hurdle sheet are corresponding one by one, bolt through the hole on the framework will be adjacent outer hurdle sheet be fixedly connected in blocks.Interior hurdle sheet 10 and interior hurdle sheet 10, outer hurdle sheet 11 stagger with the seam that is connected between the outer hurdle sheet 11 each other, and be as shown in Figure 9.Be connected with reinforced sheet 17 on the described hole 15.Diagonal member reinforcing rib 16 is arranged on framework.The guide rail of described lifting beam 1 is connected with vertical square steel pipe of main frame, and minimum connection highly is 12.6-16.2m.Between the interior hurdle sheet of described square steel pipe ascending/decending external scaffolding support body and the outer hurdle sheet is the passageway, in the passageway, is connected with cat ladder and supplies about the constructor safe ready.
Embodiment 2
Square steel pipe ascending/decending external scaffolding of the present invention is used for the face wall exterior wall finishing of existing building, and scaffold is a plane structure, highly is three floor heights of building floor height, is about 12.6 meters.
Embodiment 3
Square steel pipe ascending/decending external scaffolding of the present invention is used to build new building, and scaffold is a tetragonal structure, highly is 5 floor heights of building floor height, is about 16.2 meters.
Embodiment 4
1, main materials used
1) support body material: standpipe and transverse tube adopt the Q235 square steel pipe of 40 * 60 * 2.0mm, and hound adopts the Q235 square steel pipe of 30 * 30 * 2.0mm.
2) main frame material: the Q235 square steel pipe and the 6.3# channel-section steel that adopt 40 * 60 * 3.0mm.
3) promote the beam material: adopt Q235 10# channel-section steel.
2, prefabricated support body parts
Support body divides inside and outside hurdle sheet; The hurdle sheet is at the prefabricated welding fabrication of processing factory; Size has 1800 * 3000 and 1800 * 1,500 two kinds of main hurdle sheets, and last layer is of a size of 1800 * 1500,1800 * 3000 cross arrangements, and one deck is of a size of 1800 * 3000 down; The seam that is connected between last layer and following one deck has just staggered like this, and the sheet soldering and sealing of outer hurdle connects gauze wire cloth.Every 6m or 4.5m spacing are provided with main frame, and the every joint of main frame highly is 4100.Promote the processing of members such as beam, falling proof device in addition.
3, assembled on site moulding
1) support body assembling
Inside and outside hurdle sheet connects into support body by cross bar with the M12 bolt, and every 6m or 4.5m form a standard block body by main frame, is all connected by the M12 bolt, is assembled into the lifting support body according to the building external form.
2) installation of guide rail, steel outrigger assembly
(1) the little cross bar on each step frame of guide assembly and main frame is linked to each other, setting height(from bottom) is that following lifting girder steel assembly is a basic point, guarantees that guide assembly reserves the height that the length of girder steel assembly makes a floor of support body rising.
(2) after having cleared up the first floor preformed hole, girder steel assembly down is installed, through through-wall bolt, interior outer nut connects firmly with building with the girder steel assembly, and the screw thread that bolt head exposes nut end face behind the nut screwing clamping is no less than 5 and detains; The link plate and the building surface of girder steel assembly are sturdy, and the guide wheel assembly of girder steel assembly termination will be enclosed within the gathering sill of guide assembly.
(3) install the girder steel assembly, the beam wire rope will be gone up the root of girder steel assembly and the end of following girder steel assembly is strained and tightened with leading.
(4) cleared up the 3rd, the 4th layer of preformed hole after, install the girder steel assembly respectively by top requirement.
3) electric block is installed
Electric block hangs on the hanging board of girder steel assembly, stube cable line, electrical control cubicles.Concrete installation, debugging, maintenance, descending operation see the O&M manual of electric block and electrical control cubicles for details.
4), falling proof device is installed
The guide tracked whole outrigger falling proof device that promotes is set to an anti-fall wedge, and anti-fall wedge is installed between the wedge and guide assembly that promotes on the beam.Its operating principle is: when support body rose, because the slit between wedge and the guide assembly is up big and down small, in the support body uphill process, the electric block chain tightened up, and spring bearer plate is pushed down anti-fall plate button naturally, and anti-fall wedge is raise automatically.In case gliding appears in support body, spring ejects, and anti-fall plate button is jumped out spring bearer plate automatically, and anti-fall wedge glides.Under the frictional force effect between wedge and the guide assembly three, anti-fall wedge blocks tighter and tighter, thereby plays anti-fall effect, prevents support body further to glide, and its braking distance is not more than 8cm.Under the climbing frame inactive state, the electric block chain unclamps, and then anti-fall wedge falls naturally.In the climbing frame decline stage, then anti-fall wedge upwards promotes.
4, the lifting flow process of hoisting frame
1) removes the drawknot constraint of corresponding site;
Open the coupling component of support body and mounting platform when 2) promoting;
3) girder steel assembly, the support body with electric block and hoisting mechanism connects, circuit and switch board online intact;
4) pretension cucurbit chain;
5) open switch board, control cabinet and promote button, make hoisting frame rising first floor;
6) tension static state traction wire rope;
7) with support body and building drawknot mutually, the electric block chain that comes loose, anti-drop device falls naturally, reaches the fall arrest effect.
8) follow-up lifting: will descend the girder steel assembly to pull down and upwards have enough to meet the need the two-layer set preformed hole place that is installed in.
9) repeat above-mentioned 2-8 bar, accomplish successively promoting.

Claims (10)

1. square steel pipe ascending/decending external scaffolding; Constitute by promoting beam, vertical main frame, horizontal supporting framework, support body and falling proof device; It is characterized in that at least 3 promote the arrangement of beam equidistance, promote beam and are made up of link plate and channel-section steel; Link plate is fixedly connected with external wall through at least two through-wall bolts, and channel-section steel is connected root and is fixedly connected with the reinforcement set square with link plate; Promote the beam middle part and be provided with falling proof device, its below is equipped with electric block; Promote beam end and be welded with the channel-section steel baffle plate; Be connected with guide wheel on the baffle plate, guide wheel is positioned at the groove of the channel-section steel guide rail of vertical main frame, is connected with the guide rail sliding-contact; The truss that the horizontal supporting framework is welded by square steel pipe is connected with the support body on its top and links to each other with vertical main frame.
2. square steel pipe ascending/decending external scaffolding according to claim 1; It is characterized in that; Described support body is made up of interior hurdle sheet and outer hurdle sheet, and outer hurdle sheet and interior hurdle sheet are fixedly connected with protective screening by the framework of being responsible for and transverse tube is formed by connecting on the framework of outer hurdle sheet; Between outer hurdle sheet and the interior hurdle sheet is the passageway, is connected with hound between hurdle sheet and the interior hurdle sheet outside.
3. square steel pipe ascending/decending external scaffolding according to claim 1 is characterized in that said support body is square, and the corner of support body is connected with the lantern frame, and the lantern frame is the tetragonal body structure.
4. square steel pipe ascending/decending external scaffolding according to claim 2 is characterized in that, and is porose on the framework of described interior hurdle sheet, and the hole site between the adjacent interior hurdle sheet is corresponding one by one, and bolt is fixedly connected adjacent interior hurdle sheet in blocks through the hole on the framework.
5. square steel pipe ascending/decending external scaffolding according to claim 2 is characterized in that, and is porose on the framework of described outer hurdle sheet, and the hole site between the adjacent outer hurdle sheet is corresponding one by one, and bolt is fixedly connected adjacent outer hurdle sheet in flakes through the hole on the framework.
6. square steel pipe ascending/decending external scaffolding according to claim 2 is characterized in that, interior hurdle sheet and interior hurdle sheet, outer hurdle sheet stagger with the seam that is connected between the outer hurdle sheet each other.
7. square steel pipe ascending/decending external scaffolding according to claim 2 is characterized in that the diagonal member reinforcing rib is arranged on framework.
8. square steel pipe ascending/decending external scaffolding according to claim 2 is characterized in that, is the passageway between the interior hurdle sheet of described square steel pipe ascending/decending external scaffolding support body and the outer hurdle sheet, in the passageway, is connected with cat ladder.
9. according to claim 4 or 5 described square steel pipe ascending/decending external scaffoldings, it is characterized in that, be connected with reinforced sheet on the described hole.
10. square steel pipe ascending/decending external scaffolding according to claim 1 is characterized in that, the guide rail of said lifting beam is connected with vertical square steel pipe of main frame, and minimum connection highly is 12.6-16.2m.
CN2011201721396U 2011-05-26 2011-05-26 Lift type external scaffold made of square steel pipes Expired - Lifetime CN202099993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201721396U CN202099993U (en) 2011-05-26 2011-05-26 Lift type external scaffold made of square steel pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201721396U CN202099993U (en) 2011-05-26 2011-05-26 Lift type external scaffold made of square steel pipes

Publications (1)

Publication Number Publication Date
CN202099993U true CN202099993U (en) 2012-01-04

Family

ID=45386011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201721396U Expired - Lifetime CN202099993U (en) 2011-05-26 2011-05-26 Lift type external scaffold made of square steel pipes

Country Status (1)

Country Link
CN (1) CN202099993U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195231A (en) * 2012-01-09 2013-07-10 福建建涌机械设备有限公司 Integral outer frame
CN103643790A (en) * 2013-10-30 2014-03-19 中建钢构有限公司北京分公司 Self-crawling type operating platform applicable to colossal column
CN103899078A (en) * 2014-03-31 2014-07-02 成都嘉泽正达科技有限公司 Mounting method of attached automatic lifting protection shield
CN103924776A (en) * 2013-01-11 2014-07-16 姚磊 Attached lifting scaffold
CN104379853A (en) * 2012-06-26 2015-02-25 福姆700私人有限公司 Improved frame for climbing screen
CN107035037A (en) * 2017-06-15 2017-08-11 中冶建工集团有限公司 High building top layer curtain wall frame and its installation method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195231A (en) * 2012-01-09 2013-07-10 福建建涌机械设备有限公司 Integral outer frame
CN104379853A (en) * 2012-06-26 2015-02-25 福姆700私人有限公司 Improved frame for climbing screen
CN103924776A (en) * 2013-01-11 2014-07-16 姚磊 Attached lifting scaffold
CN103643790A (en) * 2013-10-30 2014-03-19 中建钢构有限公司北京分公司 Self-crawling type operating platform applicable to colossal column
CN103643790B (en) * 2013-10-30 2016-08-17 中建钢构有限公司 It is applicable to the self-crawling type operating platform of colossal column
CN103899078A (en) * 2014-03-31 2014-07-02 成都嘉泽正达科技有限公司 Mounting method of attached automatic lifting protection shield
CN103899078B (en) * 2014-03-31 2016-03-30 成都嘉泽正达科技有限公司 Attachment automatic lifting protecting screen mounting method
CN107035037A (en) * 2017-06-15 2017-08-11 中冶建工集团有限公司 High building top layer curtain wall frame and its installation method
CN107035037B (en) * 2017-06-15 2022-10-21 中冶建工集团有限公司 Tower top curtain wall frame and mounting method thereof

Similar Documents

Publication Publication Date Title
CN202099993U (en) Lift type external scaffold made of square steel pipes
CN208518310U (en) All steel type attachment type raise scaffold
CN102383588B (en) Lifting platform for protecting safety of high-level construction
CN100590277C (en) Overhead bridge type suspension scaffold
CN102287045B (en) Square steel tube lifting outside scaffold
CN211524016U (en) Double-working-surface guide frame climbing type working platform and system
CN113090014A (en) High-rise assembled building integral operation platform and construction method and application thereof
CN202509754U (en) High-altitude steel structure node construction working platform
CN206581579U (en) A kind of track-type facilities of elevating scaffold
CN203891441U (en) Assembly type section steel overhung protective shed
CN205577383U (en) Attached lifting scaffold
CN102912991A (en) Track hosting device and track hoisting method of large curtain wall unit plate
CN203924662U (en) A kind of attaching integral lifting scaffold
CN213626818U (en) Frame type safety ladder cage
CN212103679U (en) A construction platform for installation of assembled tower
CN204040437U (en) Cantilever tripod and single-row cantilever protection frame system
CN209145256U (en) The dedicated climbing frame of assembled architecture
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN214828568U (en) Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame
CN204754150U (en) Dish -type node formula scaffold
CN205840289U (en) A kind of suspension type vertical operating platform
CN209815536U (en) Novel tower crane mounting construction platform
CN202913705U (en) Large curtain wall unit plate track lifting device
CN2578461Y (en) Liftable scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171017

Address after: 650000 Yunnan province Kunming Panlong District Beijing road white temple urban and rural residential group 6 2 unit 401

Patentee after: Yunnan Gu Jian building equipment Leasing Co., Ltd.

Address before: 650000 15A, Beijing Road, Kunming, Yunnan

Patentee before: Yunnan Xirun Investment Holdings Co., Ltd.

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 650000 the 21 floor, room 2101, Dian Gao business building, the intersection of the white dragon road and the Ring Road East Road, Panlong District, Kunming, Yunnan

Patentee after: Yunnan Gu Jian building equipment Leasing Co., Ltd.

Address before: 650000 Yunnan province Kunming Panlong District Beijing road white temple urban and rural residential group 6 2 unit 401

Patentee before: Yunnan Gu Jian building equipment Leasing Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120104