CN202099721U - Section structure of ultra-wide cable-stayed bridge - Google Patents

Section structure of ultra-wide cable-stayed bridge Download PDF

Info

Publication number
CN202099721U
CN202099721U CN2011201606720U CN201120160672U CN202099721U CN 202099721 U CN202099721 U CN 202099721U CN 2011201606720 U CN2011201606720 U CN 2011201606720U CN 201120160672 U CN201120160672 U CN 201120160672U CN 202099721 U CN202099721 U CN 202099721U
Authority
CN
China
Prior art keywords
bridge
section structure
section
cantilever
ultra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201606720U
Other languages
Chinese (zh)
Inventor
王明昌
夏至
常喜梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP CO LTD
Jiangsu Zhongshe Group Co ltd
Original Assignee
Wuxi Traffic Planning & Design Research Institute Co Ltd
JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Traffic Planning & Design Research Institute Co Ltd, JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP Co Ltd filed Critical Wuxi Traffic Planning & Design Research Institute Co Ltd
Priority to CN2011201606720U priority Critical patent/CN202099721U/en
Application granted granted Critical
Publication of CN202099721U publication Critical patent/CN202099721U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a section structure of an ultra-wide cable-stayed bridge. A bridge deck is arranged in the middle of the bridge, steel wire rope main beams are arranged on two sides of the bridge deck, a cantilever is disposed on one side of each steel wire rope main beam, and an anchoring area longitudinal beam is disposed between each steel wire rope main beam and each cantilever. The section structure can effectively resolve the problem of stress of a section, rope planes are reduced so as to bring convenience for people to view, safety performance is improved, by the aid of the compact section, material utilization quantity is reduced, and manufacturing cost is saved.

Description

The section structure of ultra wide cable stayed bridge
Technical field
The utility model relates to a kind of section structure of bridge, especially relates to a kind of section structure of ultra wide cable stayed bridge.
Background technology
Urban road is generally than broad, and section width often reaches more than 38 meters, general two width of cloth bridge sections that adopt in the design process of city cable stayed bridge, and drag-line rope face is many, and material usage is also than higher.If adopt a kind of wide cut section of convenient construction, bigger economic benefit is arranged, the rope face reduces also more favourable to landscape effect, but because the stressed and safe problem of bridge section is made relatively difficulty of said structure.
Summary of the invention
The utility model technical problem to be solved provides a kind of section structure of the ultra wide cable stayed bridge that can adopt the wide cut section and can not break down because of stressed and safe problem.
The technical scheme that its technical problem of the utility model solution is taked is: a kind of section structure of ultra wide cable stayed bridge, and the centre of bridge is provided with bridge deck, and the both sides of bridge deck are provided with the zip girder, and zip girder one side is provided with cantilever.
In order to solve the stressed problem of whole section, be provided with the anchorage zone longeron between described zip girder and the cantilever.
The beneficial effect of the utility model is: adopt this section structure, can effectively solve the stressed problem of section, the rope face reduces and makes things convenient for view, improves security performance, and compact section has reduced the consumption of material, has practiced thrift cost.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Among the figure: 1, cantilever; 2, anchorage zone longeron; 3, zip girder; 4, bridge deck.
The specific embodiment
The section structure of a kind of ultra wide cable stayed bridge as shown in Figure 1, the centre of bridge is provided with bridge deck 4, and the both sides of bridge deck 4 are provided with zip girder 3, and zip girder 3 one sides are provided with cantilever 1; Be provided with anchorage zone longeron 2 between described zip girder 3 and the cantilever 1.
Sidewalk, the outside and nonmotorized vehicle lane solve through big cantilever (more than the 5m) is set.Smaller because of nonmotorized vehicle lane and sidewalk loading, through being set, cantilever 1 can bear its load.At cantilever 1 and 3 of zip girders the anchorage zone longeron 2 of drag-line is set,, has solved the stressed of whole section through the anchorage zone longeron 2 of certain rigidity is set.Two 3 of zip girders only adopt bridge deck 4 to solve the load of wheel.
The zip girder 3 of first cradle construction motorway and drag-line district part is adopted in the construction of wide cut cable stayed bridge section, treats the Hanging Basket remaining cantilever 1 of construction again after the slippage forward.Reduce the weight of cradle construction part like this, made things convenient for construction.

Claims (2)

1. the section structure of a ultra wide cable stayed bridge, it is characterized in that: the centre of bridge is provided with bridge deck (4), and the both sides of bridge deck (4) are provided with zip girder (3), and zip girder (3) one sides are provided with cantilever (1).
2. the section structure of ultra wide cable stayed bridge according to claim 1 is characterized in that: be provided with anchorage zone longeron (2) between described zip girder (3) and the cantilever (1).
CN2011201606720U 2011-05-19 2011-05-19 Section structure of ultra-wide cable-stayed bridge Expired - Fee Related CN202099721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201606720U CN202099721U (en) 2011-05-19 2011-05-19 Section structure of ultra-wide cable-stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201606720U CN202099721U (en) 2011-05-19 2011-05-19 Section structure of ultra-wide cable-stayed bridge

Publications (1)

Publication Number Publication Date
CN202099721U true CN202099721U (en) 2012-01-04

Family

ID=45385743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201606720U Expired - Fee Related CN202099721U (en) 2011-05-19 2011-05-19 Section structure of ultra-wide cable-stayed bridge

Country Status (1)

Country Link
CN (1) CN202099721U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556566A (en) * 2013-11-21 2014-02-05 中铁第四勘察设计院集团有限公司 Main girder structure of cable-stayed bridge of large-span railway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556566A (en) * 2013-11-21 2014-02-05 中铁第四勘察设计院集团有限公司 Main girder structure of cable-stayed bridge of large-span railway
CN103556566B (en) * 2013-11-21 2015-08-19 中铁第四勘察设计院集团有限公司 Long-Span Railway Cable-Stayed Bridge main beam structure

Similar Documents

Publication Publication Date Title
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN203096599U (en) Tension-compression rod type anti-toppling device of steel-and-concrete-combination beam bridge
CN207079458U (en) The truss-like beam-arch composite bridge of double deck full steel structure
CN203729193U (en) Low tower stay cable reinforced T-type rigid framework system with suspension beams
CN203247495U (en) Pedestrian rope bridge
CN202450427U (en) Variable box variable cross-section continuous rigid frame aqueduct structure
CN104499415A (en) Main girder structure system of double-layer bridge deck cable-stayed bridge
CN101481903B (en) Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling
CN202755313U (en) Tunnel portal short-distance girder-erecting and tunnel-passing bridge-erecting machine
CN201433509Y (en) Prestressed steel girder
CN202688848U (en) Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge
CN202099721U (en) Section structure of ultra-wide cable-stayed bridge
CN207714163U (en) A kind of combined type Hanging Basket
CN203755127U (en) Pre-stress high-performance concrete continuous box girder bridge
CN205857002U (en) A kind of novel low-pylon cable-stayed bridge
CN201891068U (en) U-shaped prestressed concrete continuous beam bridge
CN203700932U (en) Multi-span anti-symmetric cable plane and anti-symmetric arch cable-stayed bridge
CN203200657U (en) Composite bridge deck slab with FRP component provided with ribs and concrete
CN202809478U (en) Edge main grider structure shaped like Chinese character 'shang' of concrete superposed beam cable-stayed bridge
CN201460933U (en) Steel bar ladder beam of two bars and two beams
CN204266110U (en) A kind of double-layer bridge-floor cable stayed bridge main beam structure system
CN205100083U (en) Bridge is indulged to asymmetric space cable face suspension bridge to single span
CN202866083U (en) Reinforced concrete floor structure
CN210216110U (en) Box girder bridge is assembled to split type prefabricated segment of pier top crossbeam of encorbelmenting greatly
CN207700041U (en) A kind of tree-shaped bridge pier for Loads of Long-span Bridges

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: WUXI TRAFFIC PLANNING + DESIGN RESEARCH INSTITUTE CO., LTD.

Effective date: 20150416

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: JIANGSU ZHONGSHE GROUP CO., LTD.

Free format text: FORMER NAME: JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP CO., LTD.

CP03 Change of name, title or address

Address after: Jinxi road Binhu District 214125 Jiangsu city of Wuxi province No. 100

Patentee after: JIANGSU ZHONGSHE GROUP CO.,LTD.

Address before: 214072 No. 2188, West Avenue, Wuxi, Jiangsu, Taihu

Patentee before: JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20150416

Address after: 214072 No. 2188, West Avenue, Wuxi, Jiangsu, Taihu

Patentee after: JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP Co.,Ltd.

Address before: 214072 No. 2188, West Avenue, Wuxi, Jiangsu, Taihu

Patentee before: JIANGSU ZHONGSHE ENGINEERING CONSULTANCY GROUP Co.,Ltd.

Patentee before: Wuxi Traffic Planning & Design Research Institute Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20170519

CF01 Termination of patent right due to non-payment of annual fee