CN202090262U - Bearing buoyancy tank for construction in mudflat and swamp areas - Google Patents

Bearing buoyancy tank for construction in mudflat and swamp areas Download PDF

Info

Publication number
CN202090262U
CN202090262U CN2011201597825U CN201120159782U CN202090262U CN 202090262 U CN202090262 U CN 202090262U CN 2011201597825 U CN2011201597825 U CN 2011201597825U CN 201120159782 U CN201120159782 U CN 201120159782U CN 202090262 U CN202090262 U CN 202090262U
Authority
CN
China
Prior art keywords
buoyancy tank
casing
construction
beach
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201597825U
Other languages
Chinese (zh)
Inventor
韩清国
王金源
杨永辉
刘新民
郭斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG ZHONGKAI MARINE ENGINEERING CO LTD
Original Assignee
SHANDONG ZHONGKAI MARINE ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG ZHONGKAI MARINE ENGINEERING CO LTD filed Critical SHANDONG ZHONGKAI MARINE ENGINEERING CO LTD
Priority to CN2011201597825U priority Critical patent/CN202090262U/en
Application granted granted Critical
Publication of CN202090262U publication Critical patent/CN202090262U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a bearing buoyancy tank for construction in mudflat and swamp areas. The bearing buoyancy tank provides a road surface paved by human labor or an operation field for various types of construction, especially for installment of wind turbines. The bearing buoyancy tank comprises tank body and an anchor pile. A floating hole is arranged on the tank body, and the anchor pile is inserted into the floating hole deep underground. The tank body can float upward and downward along with the anchor pile. A plurality of tank bodies are connected to form the construction road surface or the operation field. The load the buoyancy tank bears in the base state is roughly the same as the maximum load in the floating state. The buoyancy tank is located in the mudflat when water ebbs away and floats when the water rises. The buoyancy tank can move upward and downward along the anchor pile along with the water but never deviates from the original position. The bearing buoyancy tank provides a paving device of the construction road surface and field for various types of construction of the mudflat, the swamp and the like. The bearing buoyancy tank is strong in bearing capability and capable of totally changing construction methods of dry lands and finishing the installment of wind turbines of 3 MW.

Description

Beach marshland construction carrying buoyancy tank
Technical field
The utility model relates to beach marshland construction carrying facility, particularly beach marshland construction carrying buoyancy tank when constructing in the beach marshland, is laid buoyancy tank as the construction road surface, be various constructions, especially the installation of wind-powered electricity generation unit provides manually the construction road surface or the operation place of the row of catching.
Background technology
For the bank beach or the construction of marshland, land, the laying on construction road surface is very important operation, and China's intertidal zone beach area is very wide, is fit to very much the exploitation wind-powered electricity generation, but because of construction difficult problem restriction exploitations such as the transportation of wind power equipment, liftings.Along with the large-scale development of wind-powered electricity generation, in the marine site of the depth of water, can utilize large-scale engineering ship greater than three meters, by special-purpose maritime works's harbour, load transportation onto ship, by crane barge or special-purpose wind-powered electricity generation ship is installed, finish marine wind-powered electricity generation and install.Marine wind-resources is superior more a lot of than land, and construction cost is also a lot of than land height, and the general separate unit unit of installing is all more than 3MW.Because the single-piece size of wind power equipment is bigger, and heavier, all at tens tons even ton up to a hundred, its transportation and lifting difficulty, the exploitation of land wind field is restricted, and the installed capacity of general separate unit unit is also just at 1.5MW-2.2MW, and the unit of separate unit 3MW is seldom installed.And if be coated with or the wind-powered electricity generation unit is installed in the marshland at the seashore point bar, its difficulty is bigger, and engineer equipment in the sea can not advance, and land engineer equipment advances not go.Beach, that the marshland does not have the road is feasible, and the difficult problem that vehicle, equipment can't directly enter site operation has restricted carrying out of various constructions.
Summary of the invention
The purpose of this utility model provides beach marshland construction carrying buoyancy tank, with becoming the construction road surface after the buoyancy tank connection laying, solve beach, that the marshland does not have the road is feasible, the difficult problem that vehicle, equipment can't directly enter site operation is for various constructions, the especially installation of wind-powered electricity generation unit provide manually the construction road surface or the operation place of the row of catching.
The present technique solution can reach above-mentioned purpose: beach marshland construction carrying buoyancy tank comprises casing and anchor pile, and casing is provided with unsteady hole, and anchor pile inserts in the hole of floating in depth down.Casing can fluctuate along with anchor pile, becomes construction road surface or place after the connection.
Compared with prior art the utlity model has following useful effect: the utility model provides the laying apparatus of construction road surface and place for the various constructions of beach, marshland, supporting capacity is strong, the form of construction work on land can be become fully, the installation of 3MW wind-powered electricity generation unit can be finished.The load and the carrying of the maximum under the floating state of bearing under the state of the present end of buoyancy tank are basic identical, the buoyancy tank seat is on mud bank when anhydrous, and buoyancy tank is floatability at the incoming tide, and each buoyancy tank two ends all is provided with anchor pile, buoyancy tank can move up and down along anchor pile under the effect of water, but does not depart from original position.Buoyancy tank designs and produces the specification unanimity, can splice arbitrarily, forms road or construction place.As with the utility model with by the sea, it is little to be specially adapted to tidal range, and the very mild bank of beach, resembles bank beach such as Bohai Sea Gulf, Laizhou Wan, has tangible economic benefit and social benefit.
Description of drawings
Fig. 1 is the front view of the utility model structural representation.
Fig. 2 be the cuboid casing arrange the application schematic diagram.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further detailed description: referring to Fig. 1 and Fig. 2, beach marshland construction carrying buoyancy tank comprises casing 1 and anchor pile 4, casing 1 is provided with the hole 5 of floating, anchor pile 4 inserts in the hole 5 of floating, and it is in depth following below the insertion casing 1, make the casing 1 can not left and right displacement, but can fluctuate along anchor pile 4 along with tidewater.The unsteady hole 5 of casing 1 is located at the close end at casing 1 two ends, and the periphery of casing 1 is provided with hinge lug 2.Hinge lug 2 is provided with two ear bodies at least, and its ear body is provided with pin shaft hole.Be connected with bearing pin 3 by hinge lug 2 between casing 1 and the casing 1, the two ends of bearing pin 3 are locked by pin.Casing 1 is a square, the hinge lug 2 that is located at 1 two opposite side of the casing ear body that interlaces.Casing 1 can also be a cuboid, the hinge lug 2 that is located at 1 two opposite side of the casing ear body that interlaces.Casing 1 can longitudinal and transverse or crisscross connection, and arranging becomes road surface or place.Casing 1 shown in Figure 2 is a cuboid, has used crisscross mode of arranging, and its load-carrying properties are better, the road surface after laying is more smooth.Casing 1 uses steel plate to manufacture, and its steel plate thickness is provided with crossed reinforced muscle in length and breadth in the casing 1 between 5-8mm, enough supporting capacitys are provided.

Claims (8)

1. beach marshland construction carrying buoyancy tank is characterized in that comprising casing (1) and anchor pile (4), and casing (1) is provided with unsteady hole (5), and anchor pile (4) inserts in the hole (5) of floating.
2. construction carrying buoyancy tank in beach according to claim 1 marshland is characterized in that the unsteady hole (5) of described casing (1) is located at the close end at casing (1) two ends, and the periphery of casing (1) is provided with hinge lug (2).
3. construction carrying buoyancy tank in beach according to claim 1 marshland is characterized in that described hinge lug (2) is provided with two ear bodies at least, and its ear body is provided with pin shaft hole.
4. according to claim 1 or 2 or 3 described beach marshlands construction carrying buoyancy tank, it is characterized in that being connected with bearing pin (3) by hinge lug (2) between described casing (1) and the casing (1), the two ends of bearing pin (3) are locked by pin.
5. according to claim 1 or 2 or 3 described beach marshlands construction carrying buoyancy tank, it is characterized in that described casing (1) is a square, the hinge lug (2) that is located at (1) two opposite side of the casing ear body that interlaces.
6. according to claim 1 or 2 or 3 described beach marshlands construction carrying buoyancy tank, it is characterized in that described casing (1) is a cuboid, the hinge lug (2) that is located at (1) two opposite side of the casing ear body that interlaces.
7. according to claim 1 or 2 or 3 described beach marshlands construction carrying buoyancy tank, it is characterized in that described casing (1) can longitudinal and transverse or crisscross connection.
8. according to claim 1 or 2 or 3 described beach marshlands construction carrying buoyancy tank, the steel plate thickness that it is characterized in that described casing (1) is provided with crossed reinforced muscle in length and breadth in the casing (1) between 5-8mm.
CN2011201597825U 2011-05-09 2011-05-09 Bearing buoyancy tank for construction in mudflat and swamp areas Expired - Fee Related CN202090262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201597825U CN202090262U (en) 2011-05-09 2011-05-09 Bearing buoyancy tank for construction in mudflat and swamp areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201597825U CN202090262U (en) 2011-05-09 2011-05-09 Bearing buoyancy tank for construction in mudflat and swamp areas

Publications (1)

Publication Number Publication Date
CN202090262U true CN202090262U (en) 2011-12-28

Family

ID=45365338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201597825U Expired - Fee Related CN202090262U (en) 2011-05-09 2011-05-09 Bearing buoyancy tank for construction in mudflat and swamp areas

Country Status (1)

Country Link
CN (1) CN202090262U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251668A (en) * 2011-05-09 2011-11-23 山东中凯海洋工程有限公司 Shoal swampy zone wind power construction method, bearing buoyancy tank and tower barrel fixing device
CN106498820A (en) * 2016-11-01 2017-03-15 中国石油天然气集团公司 Beach well site drilling well assistance platform
CN107345384A (en) * 2016-05-07 2017-11-14 潘海峰 A kind of multipurpose steel box beam plate
CN115341429A (en) * 2022-08-05 2022-11-15 中国船舶重工集团应急预警与救援装备股份有限公司 Beach channel pavement device and operation method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251668A (en) * 2011-05-09 2011-11-23 山东中凯海洋工程有限公司 Shoal swampy zone wind power construction method, bearing buoyancy tank and tower barrel fixing device
CN107345384A (en) * 2016-05-07 2017-11-14 潘海峰 A kind of multipurpose steel box beam plate
CN107345384B (en) * 2016-05-07 2024-05-03 沈阳汇智云创科技有限公司 Multipurpose steel box girder plate
CN106498820A (en) * 2016-11-01 2017-03-15 中国石油天然气集团公司 Beach well site drilling well assistance platform
CN115341429A (en) * 2022-08-05 2022-11-15 中国船舶重工集团应急预警与救援装备股份有限公司 Beach channel pavement device and operation method
CN115341429B (en) * 2022-08-05 2024-04-05 中国船舶重工集团应急预警与救援装备股份有限公司 Beach channel pavement device and operation method

Similar Documents

Publication Publication Date Title
CN108867688A (en) A kind of offshore wind turbine gravity type foundation and its installation method
CN102182203B (en) A kind of steel row's formula anemometer tower foundation and anemometer tower structure
WO2021119765A1 (en) Mechanical energy storage
CN202090262U (en) Bearing buoyancy tank for construction in mudflat and swamp areas
CN105917113A (en) Method for installing a so-called "marine" pumped-storage hydroelectric power station and corresponding station
CN104627331A (en) Wind power generation floating foundation
CN104264704A (en) Combination type hexagon buoyancy tank foundation for seaborne anemometer tower
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
CN113653601A (en) Semi-submersible floating type fan device and system
CN103243732A (en) Installing method of marine anemometer tower base structure
CN105141245B (en) Offshore chinampa type photovoltaic power generation system
CN107061115A (en) Ultra-large type water-power plant
CN104376886A (en) Offshore nuclear power platform with cylindrical foundation bodies
CN103195080B (en) Towing method for gravity foundation
CN201746848U (en) Base structure of tidal flat wind farm fan
CN102080369B (en) Shallow sea novel floating type oil storage platform structure
CN201582062U (en) Foundation structure of gravity type marine wind turbine group
CN207261176U (en) A kind of offshore wind power platform pitching pile fixing device
CN204906308U (en) Offshore type chinampa formula photovoltaic power generation system
CN202450543U (en) Foundation structure of novel guide frame-type marine anemometer tower
CN211032946U (en) Movable free-rising and sinking storm platform
CN203584670U (en) Wave energy integrated power generation device
CN109024523A (en) A kind of installation of packaged type sea wind measuring device and wind detection method
CN203924089U (en) For the pile foundation of offshore wind farm facility
CN103669303B (en) Wave energy TRT and mounting method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20130509