CN202084839U - 高压线路跨越高密度高压输电线路的抱杆支撑杆装置 - Google Patents

高压线路跨越高密度高压输电线路的抱杆支撑杆装置 Download PDF

Info

Publication number
CN202084839U
CN202084839U CN2011201002542U CN201120100254U CN202084839U CN 202084839 U CN202084839 U CN 202084839U CN 2011201002542 U CN2011201002542 U CN 2011201002542U CN 201120100254 U CN201120100254 U CN 201120100254U CN 202084839 U CN202084839 U CN 202084839U
Authority
CN
China
Prior art keywords
pole support
support bar
iron tower
power transmission
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201002542U
Other languages
English (en)
Inventor
胡万荣
丁荣林
蔡钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co filed Critical Shanghai Municipal Electric Power Co
Priority to CN2011201002542U priority Critical patent/CN202084839U/zh
Application granted granted Critical
Publication of CN202084839U publication Critical patent/CN202084839U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型涉及高压线路跨越高密度高压输电线路的抱杆支撑杆装置,该装置包括铁塔、抱杆支撑杆本体、光缆滑车、链条滑车,所述的铁塔包括横担,所述的抱杆支撑杆本体设置在铁塔上,所述的抱杆支撑杆本体上设有光缆滑车,所述的抱杆支撑杆本体与铁塔的横担之间设有链条滑车。与现有技术相比,本实用新型具有适用范围广、应用前景大,且具有较大的社会效益和经济效益等优点。

Description

高压线路跨越高密度高压输电线路的抱杆支撑杆装置
技术领域
本实用新型涉及高压电施工装置,尤其是涉及高压线路跨越高密度高压输电线路的抱杆支撑杆装置。
背景技术
500kV漕泾变~南桥变输电线路工程58#~61#之间跨越10条220kV输电线路,在国内如此高密度跨越实为少见,且最高跨越的220kV输电线路高度约48m,最大一档跨越档距近409m,由于用户的重要性,被跨越的220kV输电线路基本上都不能停电。无法停电给施工带来非常大的安全风险,必须制定大跨越防护设施和导地线架设施工的优化方案以及配备合理有效的不停电跨越高密度的220kV输电线路的施工机具,加快施工进度,提高施工工效,确保将施工安全风险减低到最低程度。
实用新型内容
本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种适用范围广、应用前景大,且具有较大的社会效益和经济效益的高压线路跨越高密度高压输电线路的抱杆支撑杆装置。
本实用新型的目的可以通过以下技术方案来实现:高压线路跨越高密度高压输电线路的抱杆支撑杆装置,其特征在于,该装置包括铁塔、抱杆支撑杆本体、光缆滑车、链条滑车,所述的铁塔包括横担,所述的抱杆支撑杆本体设置在铁塔上,所述的抱杆支撑杆本体上设有光缆滑车,所述的抱杆支撑杆本体与铁塔的横担之间设有链条滑车。
所述的抱杆支撑杆本体设置在铁塔的主材与斜材的连接处,通过钢丝绳固定。
所述的抱杆支撑杆本体与铁塔的连接处设有方木垫。
所述的方木垫包裹有麻袋布。
与现有技术相比,本实用新型具有以下优点:
1、本实用新型可应用于大跨距和高密度地跨越多条运行超高压输电线路的架线施工防护,还可适用于同类大跨距跨越立交桥和铁路编组站等许多重要设施的施工。
2、本实用新型使跨越高密度高压和超高压输电线路架线施工变得简单,且为施工的常规化奠定理论和实践基础,应用前景非常广阔。
3、有较大的社会效益和经济效益。
附图说明
图1为本实用新型的结构示意图;
图2为图1的侧视结构示意图;
图3为图2中A处局部放大图。
具体实施方式
下面结合附图和具体实施例对本实用新型进行详细说明。
实施例如图1~图3所示,高压线路跨越高密度高压输电线路的抱杆支撑杆装置,该装置包括铁塔1、抱杆支撑杆本体2、光缆滑车4、链条滑车3。铁塔包括横担5。抱杆支撑杆本体2设置在铁塔1上,抱杆支撑杆本体2上设有光缆滑车4,抱杆支撑杆本体2与铁塔1的横担5之间设有链条滑车3。抱杆支撑杆本体2设置在铁塔1的主材与斜材的连接处,通过钢丝绳固定。抱杆支撑杆本体2与铁塔1的连接处设有包裹有麻袋布的方木垫。
抱杆支撑杆为格构式抱杆支撑杆。采用格构式抱杆支撑杆的跨越距离可达到300~500m,高度可根据使用铁塔的呼称高来定。格构式抱杆支撑杆采用段长600×600×4000mm的抱杆中段连接而成,长度按被跨越物的保护范围两侧各加3m而定,一般安装在铁塔跨越侧下相导线下侧挂线点下约6~8m左右处的塔身上。安装抱杆支撑杆每段用M12螺栓连接拧紧。抱杆支撑杆固定在塔身主材与斜材的连接处,抱杆支撑杆与塔身连接处使用φ15.5mm钢丝绳固定,与抱杆支撑杆连接处均需用方木垫,包裹麻袋布,用钢丝绳千斤环绕,不能直接绑在塔材上。在两侧横担下各用一根φ12.5mm钢丝绳千斤挂2t滑车,用φ12.5mm钢丝绳通过塔身和塔腿转向滑车在两端起吊抱杆支撑杆,抱杆支撑杆两端用φ16mm棕绳作拖根控制在起吊过程中不碰塔身。抱杆支撑杆外伸臂的两端用各用二根φ12.5mm钢丝绳千斤“V”型连同3t链条葫芦加绑锚固在横担后侧主材上,二边横担向上横担各加打一根φ12.5mm钢丝绳千斤连同3t链条葫芦加绑锚固。将抱杆支撑杆固定在铁塔上时,还要考虑预偏量,内侧加保险,防止极端情况导线飘离。

Claims (4)

1.高压线路跨越高密度高压输电线路的抱杆支撑杆装置,其特征在于,该装置包括铁塔、抱杆支撑杆本体、光缆滑车、链条滑车,所述的铁塔包括横担,所述的抱杆支撑杆本体设置在铁塔上,所述的抱杆支撑杆本体上设有光缆滑车,所述的抱杆支撑杆本体与铁塔的横担之间设有链条滑车。
2.根据权利要求1所述的高压线路跨越高密度高压输电线路的抱杆支撑杆装置,其特征在于,所述的抱杆支撑杆本体设置在铁塔的主材与斜材的连接处,通过钢丝绳固定。
3.根据权利要求2所述的高压线路跨越高密度高压输电线路的抱杆支撑杆装置,其特征在于,所述的抱杆支撑杆本体与铁塔的连接处设有方木垫。
4.根据权利要求3所述的高压线路跨越高密度高压输电线路的抱杆支撑杆装置,其特征在于,所述的方木垫包裹有麻袋布。
CN2011201002542U 2011-04-08 2011-04-08 高压线路跨越高密度高压输电线路的抱杆支撑杆装置 Expired - Fee Related CN202084839U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201002542U CN202084839U (zh) 2011-04-08 2011-04-08 高压线路跨越高密度高压输电线路的抱杆支撑杆装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201002542U CN202084839U (zh) 2011-04-08 2011-04-08 高压线路跨越高密度高压输电线路的抱杆支撑杆装置

Publications (1)

Publication Number Publication Date
CN202084839U true CN202084839U (zh) 2011-12-21

Family

ID=45345456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201002542U Expired - Fee Related CN202084839U (zh) 2011-04-08 2011-04-08 高压线路跨越高密度高压输电线路的抱杆支撑杆装置

Country Status (1)

Country Link
CN (1) CN202084839U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102738731A (zh) * 2011-04-08 2012-10-17 上海市电力公司 高压线路跨越高密度高压输电线路的抱杆支撑杆装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102738731A (zh) * 2011-04-08 2012-10-17 上海市电力公司 高压线路跨越高密度高压输电线路的抱杆支撑杆装置

Similar Documents

Publication Publication Date Title
CN205123185U (zh) 免维护绝缘子导线固定夹
CN207098456U (zh) 一种用于带电跨越作业的跨越塔辅助横担封网组件
CN100590943C (zh) 架空地线引下联接和接地线装配的方法
CN201953131U (zh) 220kV同塔双回直线转角钻越塔
CN203367865U (zh) 输电线路检修用辅助支架
CN203412347U (zh) 一种采用跳线上绕的z字型边坡输电线路耐张塔
CN201635465U (zh) 一种特高压输电线路终端高塔
CN202084839U (zh) 高压线路跨越高密度高压输电线路的抱杆支撑杆装置
CN206546747U (zh) 一种防风偏绝缘子串
CN201406865Y (zh) 66kv架空输电线路双回水平穿越铁塔
CN207260730U (zh) 一种双回路电缆终端塔
CN102738731A (zh) 高压线路跨越高密度高压输电线路的抱杆支撑杆装置
CN201252365Y (zh) 超、特高压输电线路施工带电跨越装置
CN203445520U (zh) 带电跨越装置
CN203645252U (zh) 10kV绝缘跨越架
CN203562703U (zh) 一种用于更换架空线的桥式保护装置
CN205911713U (zh) 一种架空线路用避雷线夹板
CN102611057A (zh) 跨越网
CN206237109U (zh) 一种变电站站内避雷线连接机构
CN207829439U (zh) 高空检修安全防护装置
CN202672824U (zh) 用于±400kV直流输电线路的直线塔
CN202509840U (zh) 一种±400kV直流输电线路JK8耐张跨越塔
CN203159107U (zh) 拉力缓冲器
CN205335800U (zh) 一种导线绝缘支撑板装置
CN201444578U (zh) 变压器避雷保护装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121203

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121203

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee after: Shanghai Electric Power Corporation

Patentee after: State Grid Corporation of China

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee before: Shanghai Electric Power Corporation

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111221

Termination date: 20190408