CN202084246U - Electric simulation experiment device for horizontal well - Google Patents

Electric simulation experiment device for horizontal well Download PDF

Info

Publication number
CN202084246U
CN202084246U CN201120191839XU CN201120191839U CN202084246U CN 202084246 U CN202084246 U CN 202084246U CN 201120191839X U CN201120191839X U CN 201120191839XU CN 201120191839 U CN201120191839 U CN 201120191839U CN 202084246 U CN202084246 U CN 202084246U
Authority
CN
China
Prior art keywords
horizontal well
horizontal
simulation experiment
vertical
experiment device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120191839XU
Other languages
Chinese (zh)
Inventor
曹广胜
殷代印
张承丽
党庆功
胡绍彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Petroleum University
Original Assignee
Northeast Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Petroleum University filed Critical Northeast Petroleum University
Priority to CN201120191839XU priority Critical patent/CN202084246U/en
Application granted granted Critical
Publication of CN202084246U publication Critical patent/CN202084246U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model provides an electric simulation experiment device for a horizontal well. The electric simulation experiment device is characterized in that: a voltage-stabilized power supply is connected with each electric part, a stroke controller is connected with a control motor, a vertical operating wheel is connected with a vertical moving device, a probe is arranged at the bottom of the vertical moving device, a rectangular supply edge and the horizontal well are arranged in an electrolytic bath, a vertical crack is arranged on the horizontal well, a horizontal operating wheel is arranged on a horizontal moving frame, and a data acquisition and processing system is connected with each data acquisition part. The electric simulation experiment device has the beneficial effects that: a student is easier to understand and master a fundamental principle and method of the electric simulation of the horizontal well and hydrofracture; multiple proportions of the increase of vertical cracks and horizontal cracks at different horizontal lengths of the horizontal well as well as the distribution condition of strata pressures can be measured more clearly; and the electric simulation experiment device is convenient for an operator to operate and use, and fills the gap in the prior art.

Description

Horizontal well electrical simulation experiment device
Technical field
The utility model relates to a kind of horizontal well electrical simulation experiment device, is specially adapted in scientific research of oil field prospecting development system and the experimental teaching.
Background technology
The method of research waterfrac treatment at present is more, mainly contains physical Modeling Method, mathematical simulation method, electrical analogue method, field test method of testing.Physical Modeling Method is carried out indoor crushing test by setting up physical model, the research fracture flow capacity; Carry out the form in two dimension, three-dimensional model experimental study generation crack.Common this physical simulation is the test of carrying out under the simulated formation High Temperature High Pressure, and expensive bigger, its gained result has certain limitation, often is subjected to the rock core condition restriction, also difficult technically the realization.The mathematical simulation method, by certain assumed condition, set up mathematics---mechanical model, simulation fracturing fracture form, physical dimension etc., and, obtain the result of the relevant rule of waterfrac treatment to model solution; Owing to be subjected to the restriction of geology, technology and means of production condition, the result has certain gap with actual, mostly be in theory and study, but the gained result often has common meaning.In addition, also useful numerical simulation is studied fracture morphology.Electrical analogue method waterfrac treatment electric analogy technology was not carried out to the beginning of the sixties as far back as the forties, and people such as J.M.Tinsley, Mike Kui Er one west carat obtain than great achievement and progress in this research.This kind method is that the fracture morphology, the seam that utilize the water power principle of similitude to study waterfrac treatment to form are long, seam is wide, relation between seam height, conductivity, fracture flow capacity and other parameters and the stimulation ratio, constructs in order to instruct fracturing technology design and mining site.Electricity consumption analog study pressure break problem is littler than physical Modeling Method investment, be widely used, experimental period is short, accuracy is high, and the general guidance meaning is arranged.Adopt knowledge such as some mathematics, permeation fluid mechanics and electricity, chemistry by electrical analogue method, can quantitatively obtain relevant hydraulic fracturing parameters, reach satisfied result with the electric analog model of setting up.But owing to be subjected to technical conditions restriction at that time, the research difficulty is bigger.The field test method of testing, the field test method of testing that adopts is more both at home and abroad, mainly contains: seismic wave method, waterfrac treatment stamping process, ground potential method, indicator trace method, well testing method, well temperature radioisotope logging method and ultrasonovision method, borehole wall avalanche method etc.These methods have also among improving, but a general character is arranged, or limited by experiment condition and funds, or limited by hole condition, stratum, process conditions, or because of the complicacy of terrestrial stress, often its result has certain limitation on prediction fracturing fracture form and orientation.
The utility model content
The purpose of this utility model is to provide a kind of horizontal well electrical simulation experiment device, and this device utilizes the water power principle of similitude, similarity criterion to set up the horizontal well electric analog(ue) model; Make things convenient for the student to learn to utilize the horizontal well electric analog(ue) model to measure uniform formation horizontal well output, reservoir pressure and draw isobaric method; Association utilize the horizontal well electric analog(ue) model measure horizontal well press off vertically oriented fracture, horizontal fracture, when being the different angles crack with borehole axis, the oil well output of horizontal well, reservoir pressure distribute and draw isobaric method; The method of waterfrac treatment effect of increasing production when association utilizes horizontal well electrical simulation experiment data to estimate the effect of increasing production of horizontal well varying level segment length and horizontal well to be pressed into the crack of dissimilar, size and quantity.
The technical scheme that its technical matters that solves the utility model adopts is: a kind of horizontal well electrical simulation experiment device, mainly comprise stabilized voltage supply, data acquisition processing system, journey controller, the control motor, vertical hand wheel, probe, horizontal well, vertically oriented fracture, horizontal fracture, the levels operation wheel, electrolytic tank, rectangle is supplied with the edge, stabilized voltage supply connects each electricity consumption part, journey controller connects the control motor, vertical hand wheel connects vertical mobile device, vertical mobile device bottom is provided with probe, be provided with rectangle in the electrolytic tank and supply with edge and horizontal well, horizontal well is provided with vertically oriented fracture, the levels operation wheel is located at and moves horizontally on the frame, and data acquisition processing system connects each part of data acquisition.
The beneficial effects of the utility model are, the student is easier to understand and grasps the ultimate principle and the method for fractured horizontal well electric analogy, the simultaneously clearer and more definite mensuration horizontal well vertically oriented fracture and the volume increase multiple proportions and the reservoir pressure distribution situation of horizontal fracture, make things convenient for the staff to manipulate, filled up prior art blank in this regard.
Description of drawings:
Fig. 1 is a structural representation of the present utility model.
Among the figure: stabilized voltage supply 1, data acquisition processing system 2, journey controller 3, control motor 4, vertical hand wheel 5, probe 6, horizontal well 7, vertically oriented fracture 8, levels operation wheel 9, electrolytic tank 10, rectangle are supplied with edge 11.
Embodiment:
With reference to Fig. 1: the utility model mainly comprises stabilized voltage supply 1, data acquisition processing system 2, journey controller 3, control motor 4, vertical hand wheel 5, probe 6, horizontal well 7, vertically oriented fracture 8, levels operation wheel 9, electrolytic tank 10, rectangle is supplied with edge 11, stabilized voltage supply 1 connects each electricity consumption part, journey controller 3 connects control motor 4, vertical hand wheel 5 connects vertical mobile device, vertical mobile device bottom is provided with probe 6, be provided with rectangle in the electrolytic tank 10 and supply with edge 11 and horizontal well 7, horizontal well 7 is provided with vertically oriented fracture 8, levels operation wheel 9 is located at and moves horizontally on the frame, and data acquisition processing system 2 connects each part of data acquisition.
Above embodiment is illustrated the utility model, but the utility model is not limited to above-mentioned embodiment, and all any changes of doing based on the utility model all belong to the claimed scope of the utility model.

Claims (1)

1. horizontal well electrical simulation experiment device, mainly comprise stabilized voltage supply (1), data acquisition processing system (2), journey controller (3), control motor (4), vertical hand wheel (5), probe (6), horizontal well (7), vertically oriented fracture (8), levels operation wheel (9), electrolytic tank (10), rectangle is supplied with edge (11), it is characterized in that: stabilized voltage supply (1) connects each electricity consumption part, journey controller (3) connects control motor (4), vertical hand wheel (5) connects vertical mobile device, vertical mobile device bottom is provided with probe (6), be provided with rectangle in the electrolytic tank (10) and supply with edge (11) and horizontal well (7), horizontal well (7) is provided with vertically oriented fracture (8), levels operation wheel (9) is located at and moves horizontally on the frame, and data acquisition processing system (2) connects each part of data acquisition.
CN201120191839XU 2011-06-09 2011-06-09 Electric simulation experiment device for horizontal well Expired - Fee Related CN202084246U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120191839XU CN202084246U (en) 2011-06-09 2011-06-09 Electric simulation experiment device for horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120191839XU CN202084246U (en) 2011-06-09 2011-06-09 Electric simulation experiment device for horizontal well

Publications (1)

Publication Number Publication Date
CN202084246U true CN202084246U (en) 2011-12-21

Family

ID=45344869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120191839XU Expired - Fee Related CN202084246U (en) 2011-06-09 2011-06-09 Electric simulation experiment device for horizontal well

Country Status (1)

Country Link
CN (1) CN202084246U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102410015A (en) * 2011-12-22 2012-04-11 中国石油大学(北京) Electric analog system and method for infiltration law of wells in complex structures
CN104453864A (en) * 2014-11-25 2015-03-25 中国石油大学(北京) Dynamic electricity simulation device used for depletion-drive development
CN104533401A (en) * 2014-11-19 2015-04-22 中国石油大学(华东) Electric analog device following heavy oil reservoir seepage law
CN104948155A (en) * 2014-03-31 2015-09-30 中国石油化工股份有限公司 Electrical simulation experiment method for staged-fracturing capacity of horizontal well
CN106442257A (en) * 2016-09-14 2017-02-22 中国石油大学(华东) Novel ionic liquid based complex structural well seepage electric simulation system
CN106504634A (en) * 2016-12-16 2017-03-15 榆林学院 One kind is based on intelligentized water power analogue experiment installation
CN112345324A (en) * 2020-11-02 2021-02-09 东北石油大学 Preparation method of natural crack in rock core

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102410015A (en) * 2011-12-22 2012-04-11 中国石油大学(北京) Electric analog system and method for infiltration law of wells in complex structures
CN104948155A (en) * 2014-03-31 2015-09-30 中国石油化工股份有限公司 Electrical simulation experiment method for staged-fracturing capacity of horizontal well
CN104533401A (en) * 2014-11-19 2015-04-22 中国石油大学(华东) Electric analog device following heavy oil reservoir seepage law
CN104453864A (en) * 2014-11-25 2015-03-25 中国石油大学(北京) Dynamic electricity simulation device used for depletion-drive development
CN104453864B (en) * 2014-11-25 2017-02-22 中国石油大学(北京) Dynamic electricity simulation device used for depletion-drive development
CN106442257A (en) * 2016-09-14 2017-02-22 中国石油大学(华东) Novel ionic liquid based complex structural well seepage electric simulation system
CN106504634A (en) * 2016-12-16 2017-03-15 榆林学院 One kind is based on intelligentized water power analogue experiment installation
CN112345324A (en) * 2020-11-02 2021-02-09 东北石油大学 Preparation method of natural crack in rock core

Similar Documents

Publication Publication Date Title
CN202084246U (en) Electric simulation experiment device for horizontal well
CN203502301U (en) Similar simulation material experiment equipment for roadway surrounding rock deformation
CN207198149U (en) One kind is based on numerical simulation study close-in seamses group's water-retaining production experimental provision
CN202220598U (en) Three-dimensional electric analog experiment device of horizontal well exploitation
CN104200734B (en) A kind of method of inverting coal seam bottom water bursting
CN106437674B (en) Imitative water injection of horizontal well well pattern adaptation method
CN102720486B (en) Device for testing shale gas fracture network diversion capacity and working method of device
CN103837360B (en) Tunnel pipe shed construction method simulated excavation device and implementation method thereof
CN106437644A (en) Large bottom water sandstone oil reservoir development physical simulation experiment device and working method thereof
CN106522935A (en) Method for experimentally determining carbonate rock oil and gas reservoir acid fracturing fracture conductivity distribution
CN104594886A (en) Simulator of oil-gas reservoir type gas storage
CN203420700U (en) Measuring device for rock fracture steering simulation experiment
CN103883302A (en) Method for manufacturing physical simulation test parts of coal-bed gas well hydraulic fractures
CN203745218U (en) Tunnel pipe shed construction method simulation excavation device
CN103615238A (en) Scaling-down cavernous formation dual laterolog physical simulation device and experimental method
CN205538580U (en) Indoor survey device of fissuted medium system infiltration tensor
CN103760096B (en) A kind of side direction pressurization analog simulation experimental device and experimental technique
CN204436367U (en) A kind of high-pressure water jet drilling well experimental bench
Zeng et al. Experimental study on the influence of brine concentration on the dissociation characteristics of methane hydrate
CN204008603U (en) A kind of device of simulating the complicated seam of volume fracturing net proppants settle down rule
CN102915665B (en) Coalbed methane earthquake physical model and making method thereof
CN104533401B (en) A kind of electric copying device suitable for percolation rule in heavy oil reservoir
CN204101017U (en) Dew well coal mining slope displacement monitoring device
CN202119759U (en) Hydro-fracture electrical analogue experiment measuring device
CN107942035A (en) A kind of crack three-dimensional configuration acquisition methods for scale model blasting experiment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Daqing High-tech Zone Heidimiao Heavy Oil Test Recovery Technology Development Co.,Ltd.

Assignor: Northeast Petroleum University

Contract record no.: 2013230000941

Denomination of utility model: Electric simulation experiment device for horizontal well

Granted publication date: 20111221

License type: Exclusive License

Record date: 20130529

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111221

Termination date: 20130609