CN202073089U CN2011201589655U CN201120158965U CN202073089U CN 202073089 U CN202073089 U CN 202073089U CN 2011201589655 U CN2011201589655 U CN 2011201589655U CN 201120158965 U CN201120158965 U CN 201120158965U CN 202073089 U CN202073089 U CN 202073089U
Authority
CN
China
Prior art keywords
suspension rod
pile foundation
reinforcement cage
hanging
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201589655U
Other languages
Chinese (zh)
Inventor
吴业新
刘伟
叶颜伟
汪晓棠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 5th Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
China Railway Erju 5th Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, China Railway Erju 5th Engineering Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN2011201589655U priority Critical patent/CN202073089U/en
Application granted granted Critical
Publication of CN202073089U publication Critical patent/CN202073089U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a movable hanging steel bar for a steel reinforcement cage of a pile foundation, which comprises at least two sets of hanging steel bar assemblies, wherein each hanging steel bar assembly comprises a hanging rod, and the upper end of each hanging rod is fixedly connected with a hanging ring; and the lower end of each hanging rod is fixedly connected with a clamping part used for clamping the strengthening hoop steel bar at the top of the steel reinforcement cage. In the utility model, U-shaped clamping hoops which are arranged at the lower ends of the hanging rods are utilized to clamp the strengthening hoop steel bar at the top of the steel reinforcement cage, and then penetrate through the hanging rings arranged at the upper ends of the hanging rods through high-strength steel pipes; the steel reinforcement cage is hung in concrete holes to be poured, and thus, abnormal conditions such as the upward floatation of the steel reinforcement cage and the like can be discovered in time in the process of pouring concrete into the pile foundation; and problems such as the sinking of the steel reinforcement cage and the like are effectively solved to ensure the top elevation of the steel reinforcement cage, and the construction quality of the pile foundation is finally ensured.

Description

Muscle is hung in the activity of a kind of pile foundation reinforcing cage
Technical field
The utility model relates to the bridge pile foundation technical field, and muscle is hung in the activity of particularly a kind of pile foundation reinforcing cage.
Background technology
Carry out in the concreting process in pile foundation, the basic at present round steel that adopts welds the lifting reinforcement means, yet common quality defects such as reinforcing cage sinking, come-up can't in time be found and solve to this method, so that influences pile foundation engineering reinforcing cage quality.
The utility model content
Goal of the invention of the present utility model is: at the problem of above-mentioned existence, provide a kind of and can in time find abnormal conditions such as rising of steel cage, and effectively eliminate problems such as reinforcing cage sinking, to guarantee reinforcing cage top mark height, guarantee that finally muscle is hung in the pile foundation reinforcing cage activity of pile foundation engineering quality.
The technical solution of the utility model is achieved in that the activity of a kind of pile foundation reinforcing cage hangs muscle, it is characterized in that: hang the muscle assembly by at least two groups and form, the described muscle assembly that hangs comprises suspension rod, be fixedly connected with suspension ring in described suspension rod upper end, fixedly connected being useful in the lower end of suspension rod clamped the fixing parts that stirrup is strengthened at the reinforcing cage top.
Muscle is hung in pile foundation reinforcing cage described in the utility model activity, its described muscle assembly that hangs also comprises latch, be provided with vertical with it spacing horizontal stripe in described latch bottom, described fixing parts are made up of upper and lower two U type clips, at regular intervals between described two U type clips, described latch lower end is passed upper and lower two U type clips successively, and spacing horizontal stripe is resisted against U type clip upper surface.
Muscle is hung in pile foundation reinforcing cage described in the utility model activity, and it is fixedly connected with at least one U type and strengthens hoop below described suspension rod bottom, fixing parts.
Muscle is hung in pile foundation reinforcing cage described in the utility model activity, its described suspension rod comprises suspension rod A and suspension rod B, described suspension rod A and suspension rod B link together by at least two wire clips, and described suspension ring are fixedly connected on the upper end of suspension rod A, and described fixing parts are fixedly connected on the lower end of suspension rod B.
The utility model utilize that the suspension rod lower end is provided with U type clip clamp the reinforcement stirrup at reinforcing cage top, pass the suspension ring that the suspension rod upper end is provided with by high-intensity steel pipe then, reinforcing cage is suspended in waits to build in the concrete hole, like this, carry out in the concreting process in pile foundation, can in time find abnormal conditions such as rising of steel cage, and effectively eliminate problems such as reinforcing cage sinking, to guarantee reinforcing cage top mark height, finally guarantee the pile foundation engineering quality.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is user mode figure of the present utility model.
Mark among the figure: 1a is suspension rod A, and 1b is suspension rod B, and 2 is suspension ring, and 3 is reinforcing cage, and 4 for strengthening stirrup, and 5 be latch, and 6 be spacing horizontal stripe, and 7a is last U type clip, and 7b is U type clip down, and 8 is that the reinforcement of U type is bound round, and 9 is wire clips.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is done detailed explanation.
In order to make the purpose of this utility model, technical scheme and advantage clearer,, the utility model is further elaborated below in conjunction with drawings and Examples.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
As illustrated in fig. 1 and 2, muscle is hung in the activity of a kind of pile foundation reinforcing cage, hanging the muscle assembly by two groups forms, the described muscle assembly that hangs comprises suspension rod and latch 5, described suspension rod comprises suspension rod A1a and suspension rod B1b, described suspension rod A1a and suspension rod B1b link together by two wire clips 9, be fixedly connected with suspension ring 2 in the upper end of described suspension rod A1a, the lower end of described suspension rod B1b is fixedly connected to be useful on and to clamp the fixing parts that stirrup 4 is strengthened at reinforcing cage 3 tops, in the bottom of described suspension rod B1b, fix and be fixedly connected with a U type below the parts and strengthen hoop 8; Be provided with vertical with it spacing horizontal stripe 6 in described latch 5 bottoms, described fixing parts are made up of upper and lower two U type clip 7a, 7b, at regular intervals between described two U type clips, described latch 5 lower ends are passed upper and lower two U type clips successively, and spacing horizontal stripe 6 is resisted against U type clip 7a upper surface.Wherein said suspension rod adopts the reinforcing bar of φ 20, and U type clip and U type are strengthened hoop and be reinforcing bar, and latch adopts the reinforcing bar of φ 16.
The utility model at first draws according to the in-site measurement data computation and hangs muscle length in use, by unscrewing wire line shoe, adjusts the staggered distance of two φ 20 reinforcing bars, draw Len req after, tighten wire line shoe; Utilize the U shaped steel muscle clip of lower end to clamp the reinforcement stirrup (lifting place must add strong weld and ensure the quality of products) at the top of reinforcing cage, use φ 16 reinforcing bars as latch then, pass U shaped steel muscle clip and be fixed, to prevent that hanging muscle comes off owing to shaking when reinforcing cage collides hole wall or concreting; Behind placement of cage of reinforcing bar, utilize the suspension ring of upper end welding, pass high tensile steel tube reinforcing cage is suspended in midair to the hole; At last, after concreting is finished, only need to extract out latch, the suspension ring of double swerve suspension rod upper end a little just can take out smoothly and hang muscle then, are reused in the construction afterwards.Because U shaped steel muscle clip and suspension ring all belong to strong stressed object, so require when welding, to adopt two-sided full weld, and to regularly carry out welding inspection, find in time to handle after loosening or the breakage, check in the lump in the time of in addition can be and hang the muscle quality, take place with this control accident by the on-the-spot self check of quality inspection engineer.Adopt the utility model can in time find abnormal conditions such as rising of steel cage, and effectively eliminate problem such as reinforcing cage sinking.
The above only is preferred embodiment of the present utility model; not in order to restriction the utility model; all any modifications of within spirit of the present utility model and principle, being done, be equal to and replace and improvement etc., all should be included within the protection domain of the present utility model.

Claims (4)

1. muscle is hung in pile foundation reinforcing cage activity, it is characterized in that: hang the muscle assembly by at least two groups and form, the described muscle assembly that hangs comprises suspension rod, be fixedly connected with suspension ring (2) in described suspension rod upper end, fixedly connected being useful in the lower end of suspension rod clamped the fixing parts that stirrup (4) is strengthened at reinforcing cage (3) top.
2. muscle is hung in pile foundation reinforcing cage according to claim 1 activity, it is characterized in that: the described muscle assembly that hangs also comprises latch (5), be provided with vertical with it spacing horizontal stripe (6) in described latch (5) bottom, described fixing parts are made up of upper and lower two U type clips (7a, 7b), at regular intervals between described two U type clips, described latch (5) lower end is passed upper and lower two U type clips successively, and spacing horizontal stripe (6) is resisted against U type clip (7a) upper surface.
3. muscle is hung in pile foundation reinforcing cage according to claim 2 activity, it is characterized in that: be fixedly connected with at least one U type and strengthen hoop (8) below described suspension rod bottom, fixing parts.
4. hang muscle according to claim 1,2 or 3 described pile foundation reinforcing cage activities, it is characterized in that: described suspension rod comprises suspension rod A(1a) and suspension rod B(1b), described suspension rod A(1a) and suspension rod B(1b) link together by at least two wire clips (9), described suspension ring (2) are fixedly connected on suspension rod A(1a) the upper end, described fixing parts are fixedly connected on suspension rod B(1b) the lower end.
CN2011201589655U 2011-05-18 2011-05-18 Movable hanging steel bar for steel reinforcement cage of pile foundation Expired - Lifetime CN202073089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201589655U CN202073089U (en) 2011-05-18 2011-05-18 Movable hanging steel bar for steel reinforcement cage of pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201589655U CN202073089U (en) 2011-05-18 2011-05-18 Movable hanging steel bar for steel reinforcement cage of pile foundation

Publications (1)

Publication Number Publication Date
CN202073089U true CN202073089U (en) 2011-12-14

Family

ID=45111192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201589655U Expired - Lifetime CN202073089U (en) 2011-05-18 2011-05-18 Movable hanging steel bar for steel reinforcement cage of pile foundation

Country Status (1)

Country Link
CN (1) CN202073089U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332372A (en) * 2015-11-18 2016-02-17 浙江双和环境建设有限公司 Cast-in-place pile reinforcement cage construction device and process thereof
CN105507324A (en) * 2015-11-27 2016-04-20 北京城建中南土木工程集团有限公司 Detachable hanging reinforcement and construction method thereof
CN106120716A (en) * 2016-08-19 2016-11-16 九峰海洋生态建设集团有限公司 A kind of fastening means preventing pile foundation steel bar cage from floating
CN108996383A (en) * 2018-07-23 2018-12-14 中铁三局集团华东建设有限公司 Buried diaphram wall steel reinforcement cage hanging steel bar hanging apparatus and its construction method
CN112324990A (en) * 2020-10-29 2021-02-05 中国三冶集团有限公司 Method and structure for reinforcing underground straight buried pipe

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332372A (en) * 2015-11-18 2016-02-17 浙江双和环境建设有限公司 Cast-in-place pile reinforcement cage construction device and process thereof
CN105507324A (en) * 2015-11-27 2016-04-20 北京城建中南土木工程集团有限公司 Detachable hanging reinforcement and construction method thereof
CN105507324B (en) * 2015-11-27 2017-09-22 北京城建中南土木工程集团有限公司 Detachable hangs muscle and its construction method
CN106120716A (en) * 2016-08-19 2016-11-16 九峰海洋生态建设集团有限公司 A kind of fastening means preventing pile foundation steel bar cage from floating
CN108996383A (en) * 2018-07-23 2018-12-14 中铁三局集团华东建设有限公司 Buried diaphram wall steel reinforcement cage hanging steel bar hanging apparatus and its construction method
CN112324990A (en) * 2020-10-29 2021-02-05 中国三冶集团有限公司 Method and structure for reinforcing underground straight buried pipe

Similar Documents

Publication Publication Date Title
CN202073089U (en) Movable hanging steel bar for steel reinforcement cage of pile foundation
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN104863271A (en) Concrete-filled steel tube column-reinforced concrete beam joint connection method
CN207714310U (en) A kind of lowering device for reinforcing cage
CN203795829U (en) Hoop assembly
CN204960342U (en) But height -adjusting's roof beam reinforcement supports instrument
CN207093932U (en) Construction spring hanger
CN206034444U (en) Movable hanging steel bar for steel reinforcement cage of pile foundation
CN202530444U (en) Bayonet pin type pile foundation reinforcing cage positioning lock
CN204225098U (en) Overweight reinforcing cage
CN204282223U (en) Middle cross beam suspension bracket is used in long-span steel pipe arch bridge construction
CN208394614U (en) A kind of steel bar positioning frame
CN108792924B (en) Reinforcing steel bar positioning frame
CN207363238U (en) A kind of main frame of universal elevating scaffold
CN103921347B (en) Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases
CN207002010U (en) The detachable hangs muscle of reinforcing bar cage hoisting
CN213014358U (en) Pipeline suspension structure
CN202467218U (en) Reinforcing steel bar binding in-place lifting appliance
CN205036065U (en) A adhere to formula and do not have a counter weight hanging flower basket for outer wall construction
CN206015686U (en) A kind of internal support of foundation pit device
CN203795871U (en) Hooping bundling operation frame for structural columns
CN204139066U (en) A kind of plate girder bracket, construction bracket and construction Hanging Basket
CN211846865U (en) Device for hoisting corrugated pipe
CN103343545B (en) Steel hanging box flexible hanging device
CN205313978U (en) Whole ann of bridge cantilever construction tears protector open

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wu Yexin

Inventor after: Liu Wei

Inventor after: Ye Yanwei

Inventor after: Wang Xiaotang

Inventor before: Wu Yexin

Inventor before: Liu Wei

Inventor before: Ye Yanwei

Inventor before: Wang Xiaotang

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160105

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

Address before: 610041, No. nine, No. 156, building B, Gao Xing Road, Chengdu hi tech Development Zone, Chengdu, Sichuan

Patentee before: CHINA RAILWAY ERJU Co.,Ltd.

Patentee before: CHINA RAILWAY ERJU 5TH ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190114

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: CHINA RAILWAY ERJU 5TH ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20111214

CX01 Expiry of patent term