CN202073089U - Movable hanging steel bar for steel reinforcement cage of pile foundation - Google Patents
Movable hanging steel bar for steel reinforcement cage of pile foundation Download PDFInfo
- Publication number
- CN202073089U CN202073089U CN2011201589655U CN201120158965U CN202073089U CN 202073089 U CN202073089 U CN 202073089U CN 2011201589655 U CN2011201589655 U CN 2011201589655U CN 201120158965 U CN201120158965 U CN 201120158965U CN 202073089 U CN202073089 U CN 202073089U
- Authority
- CN
- China
- Prior art keywords
- suspension rod
- pile foundation
- reinforcement cage
- hanging
- muscle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201589655U CN202073089U (en) | 2011-05-18 | 2011-05-18 | Movable hanging steel bar for steel reinforcement cage of pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201589655U CN202073089U (en) | 2011-05-18 | 2011-05-18 | Movable hanging steel bar for steel reinforcement cage of pile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202073089U true CN202073089U (en) | 2011-12-14 |
Family
ID=45111192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201589655U Expired - Lifetime CN202073089U (en) | 2011-05-18 | 2011-05-18 | Movable hanging steel bar for steel reinforcement cage of pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202073089U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105332372A (en) * | 2015-11-18 | 2016-02-17 | 浙江双和环境建设有限公司 | Cast-in-place pile reinforcement cage construction device and process thereof |
CN105507324A (en) * | 2015-11-27 | 2016-04-20 | 北京城建中南土木工程集团有限公司 | Detachable hanging reinforcement and construction method thereof |
CN106120716A (en) * | 2016-08-19 | 2016-11-16 | 九峰海洋生态建设集团有限公司 | A kind of fastening means preventing pile foundation steel bar cage from floating |
CN108996383A (en) * | 2018-07-23 | 2018-12-14 | 中铁三局集团华东建设有限公司 | Buried diaphram wall steel reinforcement cage hanging steel bar hanging apparatus and its construction method |
CN112324990A (en) * | 2020-10-29 | 2021-02-05 | 中国三冶集团有限公司 | Method and structure for reinforcing underground straight buried pipe |
-
2011
- 2011-05-18 CN CN2011201589655U patent/CN202073089U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105332372A (en) * | 2015-11-18 | 2016-02-17 | 浙江双和环境建设有限公司 | Cast-in-place pile reinforcement cage construction device and process thereof |
CN105507324A (en) * | 2015-11-27 | 2016-04-20 | 北京城建中南土木工程集团有限公司 | Detachable hanging reinforcement and construction method thereof |
CN105507324B (en) * | 2015-11-27 | 2017-09-22 | 北京城建中南土木工程集团有限公司 | Detachable hangs muscle and its construction method |
CN106120716A (en) * | 2016-08-19 | 2016-11-16 | 九峰海洋生态建设集团有限公司 | A kind of fastening means preventing pile foundation steel bar cage from floating |
CN108996383A (en) * | 2018-07-23 | 2018-12-14 | 中铁三局集团华东建设有限公司 | Buried diaphram wall steel reinforcement cage hanging steel bar hanging apparatus and its construction method |
CN112324990A (en) * | 2020-10-29 | 2021-02-05 | 中国三冶集团有限公司 | Method and structure for reinforcing underground straight buried pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202073089U (en) | Movable hanging steel bar for steel reinforcement cage of pile foundation | |
CN202080812U (en) | Dedicated sling system for large-scaled reinforcing cage | |
CN104863271A (en) | Concrete-filled steel tube column-reinforced concrete beam joint connection method | |
CN207714310U (en) | A kind of lowering device for reinforcing cage | |
CN203795829U (en) | Hoop assembly | |
CN204960342U (en) | But height -adjusting's roof beam reinforcement supports instrument | |
CN207093932U (en) | Construction spring hanger | |
CN206034444U (en) | Movable hanging steel bar for steel reinforcement cage of pile foundation | |
CN202530444U (en) | Bayonet pin type pile foundation reinforcing cage positioning lock | |
CN204225098U (en) | Overweight reinforcing cage | |
CN204282223U (en) | Middle cross beam suspension bracket is used in long-span steel pipe arch bridge construction | |
CN208394614U (en) | A kind of steel bar positioning frame | |
CN108792924B (en) | Reinforcing steel bar positioning frame | |
CN207363238U (en) | A kind of main frame of universal elevating scaffold | |
CN103921347B (en) | Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases | |
CN207002010U (en) | The detachable hangs muscle of reinforcing bar cage hoisting | |
CN213014358U (en) | Pipeline suspension structure | |
CN202467218U (en) | Reinforcing steel bar binding in-place lifting appliance | |
CN205036065U (en) | A adhere to formula and do not have a counter weight hanging flower basket for outer wall construction | |
CN206015686U (en) | A kind of internal support of foundation pit device | |
CN203795871U (en) | Hooping bundling operation frame for structural columns | |
CN204139066U (en) | A kind of plate girder bracket, construction bracket and construction Hanging Basket | |
CN211846865U (en) | Device for hoisting corrugated pipe | |
CN103343545B (en) | Steel hanging box flexible hanging device | |
CN205313978U (en) | Whole ann of bridge cantilever construction tears protector open |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Wu Yexin Inventor after: Liu Wei Inventor after: Ye Yanwei Inventor after: Wang Xiaotang Inventor before: Wu Yexin Inventor before: Liu Wei Inventor before: Ye Yanwei Inventor before: Wang Xiaotang |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160105 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd. Address before: 610041, No. nine, No. 156, building B, Gao Xing Road, Chengdu hi tech Development Zone, Chengdu, Sichuan Patentee before: CHINA RAILWAY ERJU Co.,Ltd. Patentee before: CHINA RAILWAY ERJU 5TH ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |
Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190114 Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Co-patentee after: CHINA RAILWAY ERJU 5TH ENGINEERING Co.,Ltd. Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CX01 | Expiry of patent term |
Granted publication date: 20111214 |
|
CX01 | Expiry of patent term |