CN202055505U - Scaffold for elevator shaft - Google Patents
Scaffold for elevator shaft Download PDFInfo
- Publication number
- CN202055505U CN202055505U CN2011201027431U CN201120102743U CN202055505U CN 202055505 U CN202055505 U CN 202055505U CN 2011201027431 U CN2011201027431 U CN 2011201027431U CN 201120102743 U CN201120102743 U CN 201120102743U CN 202055505 U CN202055505 U CN 202055505U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- steel pipe
- elevator shaft
- steel tubes
- adjustable supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model provides a scaffold for an elevator shaft, which mainly comprises transversal steel tubes and vertical steel tubes which are connected by fasteners, and is characterized by comprising adjustable supporting seats, wherein each adjustable supporting seat comprises a top support, screws, a nut and a wooden block, the screw is sheathed with the nut, and is connected on the top support, the wooden block is clamped in the slot of the top support, and the screws of the adjustable supporting seats are respectively inserted into the two ends of the transversal steel tubes. The scaffold is jacked on the wall of the shaft by the adjustable supporting seats at the two ends of the transversal steel tubes. The scaffold for the elevator shaft, has the advantages that the usage material of the scaffold is fewer, the erecting speed is quick, reservation holes for the scaffold are not necessary to be reserved on the shearing force wall in the elevator shaft, and whole scaffold body can be directly and integrally elevated in construction of a last floor.
Description
Technical field
The utility model relates to scaffold, especially elevator shaft template construction scaffold.
Background technology
What adopt in hoistway is the console mode scaffold, set up conveniently, and safety, good stability, but horizon bar all will block to be fit to tunnel dimension, and the steel pipe loss is serious.And after entering typical floor, because the support body excessive height, there are big hidden danger in its stability and safety, also ascendant trend linearly of the steel pipe quantity of using.
According to past construction experiences, the elevator hoistways scaffold can adopt wears steel pipe as the basis behind reserving hole on the shear wall, set up scaffold then on steel pipe; After can also wearing steel pipe welding angle steel platform is set on steel pipe.All need on lower floor's shear wall, keep somewhere hole to be provided but set up scheme for these two kinds, deviation be arranged slightly, will impact follow-up construction if the both sides hole to be provided is kept somewhere the position.And there is a large amount of stifled holes engineering quantity in the later stage.
Summary of the invention
The purpose of this utility model is to provide a kind of use scaffolding few, sets up fireballing scaffold.
The utility model provides a kind of elevator shaft scaffold, mainly connect and compose with fastener by horizontal steel pipe and perpendicular steel pipe, it is characterized in that: use on-the-spot existing steel pipe to set up, need not special process component, adjustable seats is arranged, adjustable seats comprises jacking, screw, nut and the lumps of wood, screw is with nut, be connected on the jacking, the lumps of wood is stuck in the groove of jacking, and the screw of adjustable seats inserts horizontal steel pipe two ends respectively.Utilize the adjustable seats at horizontal steel pipe two ends to hold out against on the borehole wall, whole frame body is set up once, can directly promote during the construction last layer, does not need to set up again.
The elevator shaft scaffold that the utility model provides, the lower end of its perpendicular steel pipe can be connected to oblique steel pipe, and tiltedly steel pipe inserts in the elevator door opening, and tiltedly steel pipe is supported in floor plate face, so that begin to set up scaffold from the door opening of following one deck.
The elevator shaft scaffold that the utility model provides, the lower end of its oblique steel pipe can be connected to horizontal steel pipe, and horizontal steel pipe two ends are inserted with adjustable seats, to increase safety.
The elevator shaft scaffold that the utility model provides, its advantage is: use scaffolding few, it is fast to set up speed, needn't establish hole to be provided for scaffold stays on the shear wall in the elevator hoistways, and whole frame body can directly wholely promote during the construction last layer.
Description of drawings
Fig. 1 is the structural representation of elevator shaft scaffold;
Fig. 2 is the structural representation (overlooking) of elevator shaft scaffold;
Fig. 3 is the structural representation of elevator shaft scaffold adjustable seats.
The specific embodiment
The elevator shaft scaffold, its structure such as Fig. 1, shown in 2 and 3, connect and compose by horizontal steel pipe 1 and perpendicular steel pipe 5 usefulness fasteners, adjustable seats 2 is arranged, adjustable seats 2 comprises jacking 2.1, screw 2.2, the nut 2.3 and the lumps of wood 2.4, screw 2.2 is with nut 2.2, be welded on the jacking 2.1, the lumps of wood 2.4 is contained in 2.1 li of jackings, and the screw 2.2 of adjustable seats 2 inserts horizontal steel pipe 1 two ends respectively, and the lower end of perpendicular steel pipe 5 can be connected to oblique steel pipe 4, tiltedly steel pipe 4 inserts in the elevator door opening, so that begin to set up scaffold from the door opening of following one deck, tiltedly there is horizontal steel pipe 1 lower end of steel pipe 4, and horizontal steel pipe 1 two ends are inserted with adjustable seats 2.Utilize the adjustable seats at horizontal steel pipe 1 two ends to hold out against on hoistway wall 3, tiltedly insert in the elevator door opening lower end of steel pipe 4.
Claims (3)
1. elevator shaft scaffold, mainly connect and compose with buckle by horizontal steel pipe and perpendicular steel pipe, it is characterized in that: adjustable seats is arranged, adjustable seats comprises jacking, screw, nut and the lumps of wood, screw is with nut, be connected on the jacking, the lumps of wood is stuck in the groove of jacking, and the screw of adjustable seats inserts horizontal steel pipe two ends respectively.
2. according to the described elevator shaft scaffold of claim 1, it is characterized in that: the lower end of described perpendicular steel pipe is connected to oblique steel pipe.
3. according to the described elevator shaft scaffold of claim 2, it is characterized in that: the lower end of described oblique steel pipe is connected to horizontal steel pipe, and horizontal steel pipe two ends are inserted with adjustable seats.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201027431U CN202055505U (en) | 2011-04-11 | 2011-04-11 | Scaffold for elevator shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201027431U CN202055505U (en) | 2011-04-11 | 2011-04-11 | Scaffold for elevator shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202055505U true CN202055505U (en) | 2011-11-30 |
Family
ID=45015481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201027431U Expired - Fee Related CN202055505U (en) | 2011-04-11 | 2011-04-11 | Scaffold for elevator shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202055505U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733587A (en) * | 2012-07-13 | 2012-10-17 | 浙江省长城建设集团股份有限公司 | Operating platform of high-rise elevator shaft |
CN103174284A (en) * | 2013-03-20 | 2013-06-26 | 江苏扬州建工建设集团有限公司 | Lifting handling frame of construction of elevator shaft structure |
CN103967264A (en) * | 2014-04-09 | 2014-08-06 | 中国建筑股份有限公司 | Adjustable platform beam supporting device and method for manufacturing elevator shaft operating platform through adjustable platform beam supporting device |
CN104947925A (en) * | 2015-06-26 | 2015-09-30 | 南通理工学院 | Elevator shaft protection operation platform |
CN107035131A (en) * | 2017-05-04 | 2017-08-11 | 中国建筑第二工程局有限公司 | Elevator shaft integral lifting type construction operation platform and elevator shaft construction method |
CN110318531A (en) * | 2019-08-01 | 2019-10-11 | 中国建筑第五工程局有限公司 | Operating platform in elevator |
CN114150855A (en) * | 2021-10-25 | 2022-03-08 | 日立电梯(中国)有限公司 | Overhanging type aluminum operation platform for elevator shaft |
-
2011
- 2011-04-11 CN CN2011201027431U patent/CN202055505U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733587A (en) * | 2012-07-13 | 2012-10-17 | 浙江省长城建设集团股份有限公司 | Operating platform of high-rise elevator shaft |
CN103174284A (en) * | 2013-03-20 | 2013-06-26 | 江苏扬州建工建设集团有限公司 | Lifting handling frame of construction of elevator shaft structure |
CN103967264A (en) * | 2014-04-09 | 2014-08-06 | 中国建筑股份有限公司 | Adjustable platform beam supporting device and method for manufacturing elevator shaft operating platform through adjustable platform beam supporting device |
CN103967264B (en) * | 2014-04-09 | 2015-11-18 | 中国建筑股份有限公司 | Adjustable platform beam bracing or strutting arrangement and utilize it to make the method for hoistway operation platform |
CN104947925A (en) * | 2015-06-26 | 2015-09-30 | 南通理工学院 | Elevator shaft protection operation platform |
CN107035131A (en) * | 2017-05-04 | 2017-08-11 | 中国建筑第二工程局有限公司 | Elevator shaft integral lifting type construction operation platform and elevator shaft construction method |
CN110318531A (en) * | 2019-08-01 | 2019-10-11 | 中国建筑第五工程局有限公司 | Operating platform in elevator |
CN114150855A (en) * | 2021-10-25 | 2022-03-08 | 日立电梯(中国)有限公司 | Overhanging type aluminum operation platform for elevator shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202055505U (en) | Scaffold for elevator shaft | |
CN102900022A (en) | Hydraulic climbing formwork construction method for leaning tower of cable-stayed bridge | |
CN101624871A (en) | Instrumental operation platform for shear wall formwork of elevator shaft | |
CN101280625B (en) | Non-welding assembly shuttering system | |
CN102691412B (en) | Prefabricated frame structure connection supporting template with adjustable vertical height | |
CN201334773Y (en) | Self-supporting device for steel reinforced concrete composite girder | |
CN206625551U (en) | A kind of creeping formwork support body template movement device | |
CN203846756U (en) | Overhanging profile steel anchor device | |
CN203347205U (en) | Overhung scaffold | |
CN204282817U (en) | Door-window opening mould plate installs structure | |
CN201972389U (en) | Wall-mounted cantilever scaffold | |
CN202031309U (en) | Suspending operation platform for structural concrete constructions | |
CN203547114U (en) | Wall connecting assembly | |
CN204456813U (en) | A kind of single support operation platform for elevator hoistways | |
CN114575495A (en) | Building wall structure | |
CN202064623U (en) | Assembly type integral lifting scaffold | |
CN209212239U (en) | A kind of vertical shaft concrete roof constructing device | |
CN206385802U (en) | A kind of steel construction high residential building cast-in-place concrete floor steel wood mixing supporting construction | |
CN205444468U (en) | Concrete beam's sliding support | |
CN205242988U (en) | Cantilever type steel with inclined support at bottom | |
CN217269013U (en) | Main structure safety enclosure guardrail | |
CN214941375U (en) | Hidden frame glass curtain wall of building block wall | |
KR101251051B1 (en) | Safety barrier for mounting beam | |
CN214696127U (en) | Fixing mechanism and column base thereof | |
CN201756788U (en) | Internally arranged construction bench moving according to floors of elevator shaft under construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111130 Termination date: 20120411 |