CN202041864U - Temperature test and control mechanism for air compressor unit and pressurizing machine unit - Google Patents

Temperature test and control mechanism for air compressor unit and pressurizing machine unit Download PDF

Info

Publication number
CN202041864U
CN202041864U CN2011201591087U CN201120159108U CN202041864U CN 202041864 U CN202041864 U CN 202041864U CN 2011201591087 U CN2011201591087 U CN 2011201591087U CN 201120159108 U CN201120159108 U CN 201120159108U CN 202041864 U CN202041864 U CN 202041864U
Authority
CN
China
Prior art keywords
unit
temperature test
air compressor
pressurizing machine
supporting tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201591087U
Other languages
Chinese (zh)
Inventor
赵中河
王峰
杨林
马振营
李帮军
张雪刚
李兰显
刘俊杰
刘志辉
殷延星
韩大明
马剑飞
贺丽岩
韩宜
续静静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Gas (group) Co Ltd Yima Gasification Plant
Original Assignee
Henan Gas (group) Co Ltd Yima Gasification Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Gas (group) Co Ltd Yima Gasification Plant filed Critical Henan Gas (group) Co Ltd Yima Gasification Plant
Priority to CN2011201591087U priority Critical patent/CN202041864U/en
Application granted granted Critical
Publication of CN202041864U publication Critical patent/CN202041864U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control Of Turbines (AREA)

Abstract

The utility model discloses a temperature test and control mechanism for an air compressor unit and a pressurizing machine unit, which comprises the pressurizing machine unit 6, a steam turbine 7 connected with the pressurizing machine unit 6, and the air compressor unit 8 connected with the steam turbine 7, wherein the outer sides of the pressurizing machine unit 6 and the air compressor unit 8 are connected with a supporting tile 4, and the supporting tile 4 is connected with a supporting tile 3. The utility model is characterized in that the two sides of the upper parts of the supporting tile 4 and the supporting tile 3 are respectively provided with a resistor temperature test point 1 and a resistor temperature test point 2, and a fixing hole which is used for fixing the resistor temperature test points and a line element is respectively formed at the upper side of the supporting tile 3 and the upper side of the supporting tile 4. The temperature test and control mechanism has the advantages that during the long-term operation of the air compressor unit and the pressurizing machine unit, the resistance to external interferences (such as voltage electricity swing, frequency interference of various high-frequency equipment on site, and misreport and misoperation of the instrument) is improved, the unit and the sequent procedure can be ensured to be normally carried out, and the potential safety hazards are reduced.

Description

A kind of pneumatics unit, supercharging unit measurement and control of temperature mechanism
Technical field
The utility model relates to a kind of measurement and control of temperature mechanism, and concrete is a kind of pneumatics unit, supercharging unit measurement and control of temperature mechanism.
Background technology
MCO1104+3BCL457 type pneumatics unit is a multistage turbine formula compressor, unit is made up of two cylinders, be installed in the steam turbine both sides respectively, the turbine discharge end connects with low pressure (LP) cylinder (MCO1104) by the diaphragm type shaft coupling, the steam turbine admission end connects with variable-speed motor+high pressure cylinder (3BCL457) by the diaphragm type shaft coupling, whole unit adopts lubricating oil station fuel feeding, and the shaft end seal of compressor high pressure cylinder adopts the carbocyclic ring sealing, and prime mover adopts the Hangzhoupro vapour turbine that steams.
Enter air compressor by inlet guide vane, after three sections level Four compressions, export 0.63 MPa(a), 116000 NM3/h(do) air to the postorder system, the air compressor machine discharge pipe is provided with Surge Prevention System, controls top hole pressure and flow by FV1015 and PV1016.
The pure air (66000 NM3/h) that is come by purification system enters supercharger, through three sections seven grades of compressions, it is high that the pressure of air is got, and pressurized air is divided into two strands: one extracts (2 .33 MPa(a) 30300 NM3/h out behind two sections water coolers of supercharger) go to the booster expansion machine system; Another gang (5.8 MPa(a) 35700 NM3/h) draw from the booster compressor final stage, after cooling, enter air separation unit, be provided with two anti-surge valves in the flow process, be respectively FV1020 and FV1025, purpose is to prevent to enter that the tolerance of one section of supercharger and three sections is too small causes surge.
As shown in Figure 1, the former design temperature measuring control point of unit installation site is narrow and small, and circuit can't secure fixation, and is installed in below the bearing shell, easily causes the damage resistive element in maintenance process.
Therefore, provide a kind of and can in long-time running, improve the external anti-interference resistibility of unit, and the measurement and control of temperature mechanism of the normal operation of follow-up job number, be a problem of needing solution badly.
Summary of the invention
In order to overcome above-mentioned deficiency of the prior art, it is a kind of strong to extraneous interference (wrong report and misoperation occurring as voltage rolling electricity, the frequency interferences of on-the-spot various high frequency devices, instrument itself) resistibility ability that the utility model provides, and can guarantee that unit and follow-up job number normally move, reduce pneumatics unit, the supercharging unit measurement and control of temperature mechanism of potential safety hazard.
The purpose of this utility model is achieved in that
A kind of pneumatics unit, supercharging unit measurement and control of temperature mechanism, comprise supercharging unit 6, the steam turbine 7 that is connected with increase unit 6, the pneumatics unit 8 that is connected with steam turbine 7, be connected with in the outside of supercharging unit 6 and pneumatics unit 8 and support watts 4, be connected with and push away watts 3 supporting watts 4, it is characterized in that: support watts 4 with push away watt both sides, 3 watts of top and be respectively arranged with the first resistance temperature test point 1 and the second resistance temperature test point 2.
Shown pushes away watts 3, supports watts 4 upside and have the fixed orifice that is used for fixing resistance temperature test point and circuit element.
Positive beneficial effect: the utility model has solved pneumatics unit, supercharging unit and has improved in long-time running extraneous interference (wrong report and misoperations occurring as voltage rolling electricity, the frequency interferences of on-the-spot various high frequency devices, instrument itself) resistibility, causes damage to be reduced to zero to resistive element in maintenance process; Guarantee that unit and follow-up job number normally move, and have reduced potential safety hazard.
Description of drawings
Fig. 1 is the prior art structural representation;
Fig. 2 is a structural representation of the present utility model;
The first resistance temperature test point 1, the second resistance temperature test point 2, push away watts 3, support watts 4, former design temperature measuring point 5, supercharger 6, steam turbine 7, air compressor machine 8.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing:
As shown in Figure 2, a kind of pneumatics unit, supercharging unit measurement and control of temperature mechanism, comprise supercharging unit 6, the steam turbine 7 that is connected with increase unit 6, the pneumatics unit 8 that is connected with steam turbine 7, be connected with in the outside of supercharging unit 6 and pneumatics unit 8 and support watts 4, be connected with and push away watts 3 supporting watts 4, it is characterized in that: support watts 4 with push away watt both sides, 3 watts of top and be respectively arranged with the first resistance temperature test point 1 and the second resistance temperature test point 2.
Shown pushes away watts 3, supports watts 4 upside and have the fixed orifice that is used for fixing resistance temperature test point and circuit element.
As shown in Figure 1 and Figure 2, the former design resistance temperature of unit measuring control point 5 installation sites are narrow and small, and circuit can't secure fixation, and are installed in and support watts 4, push away below watts 3, easily cause in maintenance process and damage resistance temperature test point 5; Transforming the resistance temperature test point as moves to below supporting watts 4, pushing away watts 3 and supports watts 4, pushes away watt 3 upsides, with former support watts 4, push away watt 3 tile fragments and bore ¢ 3 holes again, make fixed resistance temperature test point 5 and circuit element, the assurance circuit occurs rocking in unit and causes damage.And increase the new clothes second resistance temperature test point 2, and in the DCS steering logic, add new control system, revise steering logic and do interlocking " two get two " control.Revise 4 places, installation site altogether, logic control 30 remainders.
The utility model has solved pneumatics unit, supercharging unit and has improved in long-time running extraneous interference (wrong report and misoperation occurring as voltage rolling electricity, the frequency interferences of on-the-spot various high frequency devices, instrument itself) resistibility, causes damage to be reduced to zero to resistive element in maintenance process; Guarantee that unit and follow-up job number normally move, and have reduced potential safety hazard.
Above embodiment only is used to illustrate preferred implementation of the present utility model; but the utility model is not limited to above-mentioned embodiment; in the ken that described field those of ordinary skill is possessed; any modification of being done within spirit of the present utility model and the principle, be equal to and substitute and improvement etc., it all should be encompassed within the technical scheme scope that the utility model asks for protection.

Claims (2)

1. a pneumatics unit, supercharging unit measurement and control of temperature mechanism, comprise supercharging unit (6), the steam turbine (7) that is connected with increase unit (6), the pneumatics unit (8) that is connected with steam turbine (7), be connected with support watt (4) in the outside of supercharging unit (6) and pneumatics unit (8), be connected with and push away watt (3) supporting watt (4), it is characterized in that: supporting watt (4) and pushing away watt (3) watt both sides, top and be respectively arranged with the first resistance temperature test point (1) and the second resistance temperature test point (2).
2. a kind of pneumatics unit according to claim 1, supercharging unit measurement and control of temperature mechanism is characterized in that: described upside that pushes away watt (3), support watt (4) has the fixed orifice that is used for fixing resistance temperature test point and circuit element.
CN2011201591087U 2011-05-18 2011-05-18 Temperature test and control mechanism for air compressor unit and pressurizing machine unit Expired - Fee Related CN202041864U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201591087U CN202041864U (en) 2011-05-18 2011-05-18 Temperature test and control mechanism for air compressor unit and pressurizing machine unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201591087U CN202041864U (en) 2011-05-18 2011-05-18 Temperature test and control mechanism for air compressor unit and pressurizing machine unit

Publications (1)

Publication Number Publication Date
CN202041864U true CN202041864U (en) 2011-11-16

Family

ID=44969301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201591087U Expired - Fee Related CN202041864U (en) 2011-05-18 2011-05-18 Temperature test and control mechanism for air compressor unit and pressurizing machine unit

Country Status (1)

Country Link
CN (1) CN202041864U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499448A (en) * 2016-11-22 2017-03-15 四川金象赛瑞化工股份有限公司 A kind of safe axle system device of compressor and protection control method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499448A (en) * 2016-11-22 2017-03-15 四川金象赛瑞化工股份有限公司 A kind of safe axle system device of compressor and protection control method

Similar Documents

Publication Publication Date Title
CN202041864U (en) Temperature test and control mechanism for air compressor unit and pressurizing machine unit
CN106121743B (en) A kind of liquid radial-inward-flow turbine energy recycle device
CN201671660U (en) Steam turbine with steam extraction being changed into back pressure type
CN203273174U (en) Multistage restriction orifice structure
CN202852414U (en) Check type SF6 (Sulfur Hexafluoride) inflating device with non-return function
CN202580461U (en) Pressure sealing structure for high-pressure fluid pipeline
CN103196608B (en) A kind of turbine shaft seal leaks the appraisal procedure to steam turbine power loss
CN202659288U (en) 60Hz and 200MV of three-pressure reheat combined-cycle steam turbine
CN203515933U (en) Generating set allowing high residual pressure of industrial fluid to be recycled through hydraulic turbine
CN201837511U (en) Hydraulic pressure testing device for explosion-proof part
CN202520958U (en) Gas sealing system for hydrogenerator
CN203248411U (en) Three-section reverse-flow system used for anti-surge of supercharger
CN203488432U (en) Ternary-flow impeller of high-efficiency compressor
CN204267101U (en) A kind of steam turbine breather line
CN204253253U (en) Water turbine expansion joint structure
CN206902822U (en) booster pump room with water level monitoring function
CN105649852A (en) Telescopic joint structure for water turbine
CN206190335U (en) Steam turbine emergency trip system
CN105736326A (en) Vacuumizing process equipment
CN204627923U (en) CNG compressor whole-water-cooling but system intergration unit
CN203442204U (en) Water-pressure controlled water inlet ball valve
CN203908790U (en) Device for simulating chiller-heater set system load
CN216741648U (en) Shaft seal steam leakage device of ultrahigh pressure cylinder of steam turbine
CN209907345U (en) Pressure diversion type power station pipeline pressure-resistant device
CN102654067A (en) Manner for arranging boiler and turbine at equal altitude

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhao Zhonghe

Inventor after: Liu Zhihui

Inventor after: Yin Yanxing

Inventor after: Han Daming

Inventor after: Ma Jianfei

Inventor after: He Liyan

Inventor after: Han Yi

Inventor after: Xu Jingjing

Inventor after: Guan Xiaohui

Inventor after: Wang Feng

Inventor after: Yang Lin

Inventor after: Ma Zhenying

Inventor after: Li Bangjun

Inventor after: Zhang Xuegang

Inventor after: Li Lanxian

Inventor after: Liu Junjie

Inventor before: Zhao Zhonghe

Inventor before: Yin Yanxing

Inventor before: Han Daming

Inventor before: Ma Jianfei

Inventor before: He Liyan

Inventor before: Han Yi

Inventor before: Xu Jingjing

Inventor before: Wang Feng

Inventor before: Yang Lin

Inventor before: Ma Zhenying

Inventor before: Li Bangjun

Inventor before: Zhang Xuegang

Inventor before: Li Lanxian

Inventor before: Liu Junjie

Inventor before: Liu Zhihui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHAO ZHONGHE WANG FENG YANG LIN MA ZHENYING LI BANGJUN ZHANG XUEGANG LI LANXIAN LIU JUNJIE LIU ZHIHUI YIN YANXING HAN DAMING MA JIANFEI HE LIYAN HAN YI XU JINGJING TO: ZHAO ZHONGHE GUAN XIAOHUI WANG FENG YANG LIN MA ZHENYING LI BANGJUN ZHANG XUEGANG LI LANXIAN LIU JUNJIE LIU ZHIHUI YIN YANXING HAN DAMING MA JIANFEI HE LIYAN HAN YI XU JINGJING

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111116

Termination date: 20130518