CN202039772U - Rock burst predicting device according to temperature of coal dust of drill hole - Google Patents

Rock burst predicting device according to temperature of coal dust of drill hole Download PDF

Info

Publication number
CN202039772U
CN202039772U CN2011201541139U CN201120154113U CN202039772U CN 202039772 U CN202039772 U CN 202039772U CN 2011201541139 U CN2011201541139 U CN 2011201541139U CN 201120154113 U CN201120154113 U CN 201120154113U CN 202039772 U CN202039772 U CN 202039772U
Authority
CN
China
Prior art keywords
drill
rotary connector
slip ring
twist drill
rotating connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201541139U
Other languages
Chinese (zh)
Inventor
潘一山
徐连满
李国臻
李忠华
阎海鹏
唐巨鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN2011201541139U priority Critical patent/CN202039772U/en
Application granted granted Critical
Publication of CN202039772U publication Critical patent/CN202039772U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Measuring Temperature Or Quantity Of Heat (AREA)

Abstract

The utility model belongs to coal mine safety prediction devices, in particular to a rock burst predicting device according to temperature of coal dust of a drill hole, which comprises an electric coal drill (1), a twist drill rod (5) and a drill head (8). A rotating connector (3) is connected in the output end of the electric coal drill (1), a conductive slip ring (9) is installed on the periphery on the left side of the rotating connector (3), two sections of twist drill rods (5) provided with central holes are fixedly connected in the right end of the rotating connector (3), a wire hole (3-1) is arranged in the rotating connector (3) in the radial direction, and the wire hole is communicated with an inner hole of the rotating connector (3). A first wire (9-1) of the conductive slip ring (9) penetrates through the wire hole (3-1) and extends to the inner hole of the rotating connector. The two sections of twist drill rods (5) are fixedly connected together through in threading mode through a drill rod connecting sleeve (4). The rock burst predicting device according to the temperature of coal dust of drill hole is convenient to use, immediately displays temperature data on the site, and fast judges the danger of impact to a working face.

Description

Boring ickings temperature prediction bump device
Technical field
The utility model belongs to the safety of coal mines prediction unit, particularly a kind of boring ickings temperature prediction bump device.
Background technology
Bump is one of typical dynamic disaster in coal mining and the geotechnics, directly threatening personnel's property safety of the production and the engineering construction in colliery, even can cause gas explosion and fire incident, causing producing and interrupt, damaging mine construction, is one of the most serious disaster in colliery therefore.At present, the coal in China exploitation is extended to the deep with annual about 10 meters speed, in following 10 years, China will have a great deal of mine to enter deep mining, and along with the increase of the degree of depth, the stress of coal body increases, coal body distortion and the elasticity potential that gathers are also big more, frequency and intensity that bump takes place will constantly increase, so bump advanced prediction and accurate to the prediction of deathtrap, and will be very important in time taking the regional precautionary measures and locality to separate right measure.Bump is under the high-ground stress condition in the digging process of coal seam, the off-load of hard fragility coal body excavation, cause coal seam stress to be concentrated, cause the elastic strain energy that is stored in the coal body to discharge suddenly, thereby the generation explosion gets loose, peels off, launches even a kind of colliery dynamic buckling disaster of throwing.In to the high-ground stress coal bed drilling process that bump danger is arranged, drill bit is subjected to resistance at the bottom of the hole and the pressure of hole wall will increase, therefore frictional force increases between drill bit and boring hole diapire and the sidewall coal body, and fraction time increases, thereby drill bit, hole diapire and ickings temperature all will rise.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned technical deficiency, and providing a kind of can accurately judge, predict the coal mine work area danger of burst fast, reduces the boring ickings temperature prediction bump device of casualty loss.
The technical scheme that the utility model technical solution problem adopts is: boring ickings temperature prediction bump device comprises electric coal drill, twist drill rods, drill bit, be characterized in the output of electric coal drill, connecting rotary connector, outside the left side of rotary connector, place the dress conducting slip ring, be provided with the spline device between conducting slip ring and the electric coal drill right-hand member head, fixedly connected two sections twist drill rods that are provided with centre bore in the rotary connector right-hand member, the endoporus of the centre bore corresponding rotation connector of twist drill rods, radially being provided with wire guide in rotary connector communicates with the endoporus of rotary connector, conducting slip ring passes in the endoporus that wire guide extends rotary connector with lead one, together fixedly connected between two sections twist drill rods with drilling rod adapter sleeve screw thread, the fixedly connected drill bit of right-hand member head of twist drill rods, the centre bore inner armor thermocouple of drill bit, the left end peripheral equipment spring of thermocouple, right-hand member reaches bit exterior, below twist drill rods, establish two parallel rotatable fixed bars, fix a steel plate on a rotatable fixed bar therein, install two standing screws on the steel plate, the infrared thermometry probe is housed on another rotatable fixed bar, between conducting slip ring and infrared thermometry probe, connects data logger with lead two.
The beneficial effects of the utility model are: boring ickings temperature prediction bump device is easy to use, when the boring predicting rock burst, variations in temperature and aperture ickings temperature changing regularity at the bottom of the hole when measuring boring, the generation of prediction bump accident, a kind of new method is provided, and the on-the-spot instant playback of temperature data is judged the work plane shock hazard fast, also measurable colliery coal and gas are outstanding, and dynamic disasters such as other mines and tunnel rock burst.
Description of drawings
Specify with embodiment below in conjunction with accompanying drawing.
Fig. 1 is a boring ickings temperature prediction bump structure drawing of device.
Among the figure, the 1-electric coal drill; 2-spline device; The 3-rotary connector; The 3-1-wire guide; 4-drilling rod adapter sleeve; The 5-twist drill rods; The 6-spring; The 7-thermocouple; The 8-drill bit; The 9-conducting slip ring; 9-1-lead one; The 10-data logger; The rotatable fixed bar of 11-; The 12-steel plate; The 13-standing screw; 14-infrared thermometry probe; 15-lead two.
The specific embodiment
Embodiment, with reference to accompanying drawing 1, boring ickings temperature prediction bump device is a fixedly connected rotary connector 3 in the output of electric coal drill 1, place at the left side of rotary connector 3 cylindrical and to establish conducting slip ring 9, conducting slip ring 9 is connected with spline device 2 with electric coal drill 1 right-hand member head, together fixedly connected between 5, two sections twist drill rods 5 of twist drill rods of fixedly connected two sections band centre bores in rotary connector 3 right sides with drilling rod adapter sleeve 4 screw threads.The drill bit 8 of the corresponding centre bore of band and twist drill rods 5 fixedly is housed at the right-hand member internal thread of twist drill rods 5, dress thermocouple 7 in drill bit 8 centre bores, pocketed springs 6 outside thermocouple 7, spring 6 one ends are fixing with screw rod 5, the other end connects the end of thermocouple 7, and thermocouple 7 stretches out drill bit 8 outsides.Radially be provided with wire guide 3-1 in rotary connector 3, install lead 9-1 in wire guide 3-1, the end of lead 9-1 connects the rotor of conducting slip ring 9, the other end reach in the rotary connector 3 with the corresponding endoporus that communicates of twist drill rods 5 centre bores in.Below twist drill rods 5 and drill bit 8, be provided with two parallel rotatable fixed bars 11, fix a steel plate 12 on the bar of rotation fixed bar 11, establish two standing screws 13 on the steel plate 12, on another fixed bar 11, establish infrared thermometry probe 14, between the stator of infrared thermometry probe 14 and conducting slip ring 9, connect data logger 10 with lead 2 15.
The operating principle of boring ickings temperature prediction bump device is: infrared thermometry probe 14 is fixed on rib place, aperture with rotatable fixed bar 11 usefulness steel plates 12 and standing screw 13, along with electric coal drill 1 spuds in, drill bit 8 creeps into the coal seam, conducting slip ring 9 that thermocouple 7 on the drill bit 8 is connected with it by lead one 9-1 and the infrared thermometry 14 measured data-signals of popping one's head in are delivered to data logger 10, and data logger 10 can show the temperature data that records and store.

Claims (1)

1. boring ickings temperature prediction bump device, comprise electric coal drill (1), twist drill rods (5), drill bit (8), it is characterized in that in the output of electric coal drill (1), connecting rotary connector (3), outside the left side of rotary connector (3), place dress conducting slip ring (9), be provided with spline device (2) between conducting slip ring (9) and electric coal drill (1) the right-hand member head, fixedly connected two sections twist drill rods (5) that are provided with centre bore in rotary connector (3) right-hand member, the endoporus of the centre bore corresponding rotation connector (3) of twist drill rods (5), radially being provided with wire guide (3-1) in rotary connector (3) communicates with the endoporus of rotary connector (3), conducting slip ring (9) passes wire guide (3-1) with lead one (9-1) and extends in the endoporus of rotary connector (3), together fixedly connected between two sections twist drill rods (5) with drilling rod adapter sleeve (4) screw thread, the fixedly connected drill bit of right-hand member head (8) of twist drill rods (5), the centre bore inner armor thermocouple (7) of drill bit (8), the left end peripheral equipment spring (6) of thermocouple (7), right-hand member reaches drill bit (8) outside, establish two parallel rotatable fixed bars (11) in the below of twist drill rods (5), fix a steel plate (12) on the rotatable fixed bar (11) therein, install two standing screws (13) on the steel plate (12), infrared thermometry probe (14) is housed on another rotatable fixed bar (11), between conducting slip ring (9) and infrared thermometry probe (14), connects data logger (10) with lead two (15).
CN2011201541139U 2011-05-16 2011-05-16 Rock burst predicting device according to temperature of coal dust of drill hole Expired - Fee Related CN202039772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201541139U CN202039772U (en) 2011-05-16 2011-05-16 Rock burst predicting device according to temperature of coal dust of drill hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201541139U CN202039772U (en) 2011-05-16 2011-05-16 Rock burst predicting device according to temperature of coal dust of drill hole

Publications (1)

Publication Number Publication Date
CN202039772U true CN202039772U (en) 2011-11-16

Family

ID=44967221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201541139U Expired - Fee Related CN202039772U (en) 2011-05-16 2011-05-16 Rock burst predicting device according to temperature of coal dust of drill hole

Country Status (1)

Country Link
CN (1) CN202039772U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104294A (en) * 2013-02-01 2013-05-15 湖南科技大学 Rock burst prediction method
CN108442925A (en) * 2018-06-20 2018-08-24 中国地质大学(北京) A kind of hydraulic pressure water temperature intelligent device for measuring suitable for mine advance geologic prediction
CN109681195A (en) * 2019-02-25 2019-04-26 中国矿业大学(北京) A kind of down-hole drilling is interior along journey temperature infrared test device and method
WO2019200821A1 (en) * 2018-04-18 2019-10-24 中国矿业大学 Temperature measuring-while-drilling apparatus for detecting autoignition temperature of coal
CN111485817A (en) * 2020-04-30 2020-08-04 太原理工大学 Real-time temperature measurement drill rod applied to sealed space

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104294A (en) * 2013-02-01 2013-05-15 湖南科技大学 Rock burst prediction method
CN103104294B (en) * 2013-02-01 2015-05-27 湖南科技大学 Rock burst prediction method
WO2019200821A1 (en) * 2018-04-18 2019-10-24 中国矿业大学 Temperature measuring-while-drilling apparatus for detecting autoignition temperature of coal
CN108442925A (en) * 2018-06-20 2018-08-24 中国地质大学(北京) A kind of hydraulic pressure water temperature intelligent device for measuring suitable for mine advance geologic prediction
CN108442925B (en) * 2018-06-20 2023-10-20 中国地质大学(北京) Water pressure and water temperature intelligent measurement device suitable for advanced geological forecast of mine
CN109681195A (en) * 2019-02-25 2019-04-26 中国矿业大学(北京) A kind of down-hole drilling is interior along journey temperature infrared test device and method
CN111485817A (en) * 2020-04-30 2020-08-04 太原理工大学 Real-time temperature measurement drill rod applied to sealed space
CN111485817B (en) * 2020-04-30 2021-09-14 太原理工大学 Real-time temperature measurement drill rod applied to sealed space

Similar Documents

Publication Publication Date Title
CN202039772U (en) Rock burst predicting device according to temperature of coal dust of drill hole
US4491022A (en) Cone-shaped coring for determining the in situ state of stress in rock masses
CN107677439A (en) A kind of coal petrography wall drilling drilling tool twisting vibration wireless test experimental bench
CN202215225U (en) Device for petroleum drilling pressure and torsion measurement while drilling
CN111323331B (en) Coal seam gas content measuring device and method based on directional drilling machine
CN203522580U (en) Omnidirectional vibration energy collecting device
CN104390733A (en) Determination method for magnitude and direction of crustal stress
CN103015989A (en) Downhole continuous wave mud pulse generator
CN102174898A (en) Mine ground pressure monitoring system
CN110763380B (en) One-hole multi-point stress and displacement monitoring system based on fiber bragg grating measurement
CN106873040B (en) The real-time acquisition electrode System and method for of the airborne resistivity forward probe of rock tunnel(ling) machine
CN102288343B (en) Drilling-torque coal layer rock burst predicting device and predicting method thereof
CN202325483U (en) Drilling depth metering device
CN204716230U (en) High frequency perforation data collecting instrument
CN103528629A (en) Multifunction parameter testing device for geophysical prospecting drilling machine
CN204101017U (en) Dew well coal mining slope displacement monitoring device
CN203594372U (en) Drill tool for detecting temperature in drill holes in real time
CN203515560U (en) Borehole stress monitoring device
CN202325482U (en) Drill hole depth metering device
CN103590753A (en) Drilling tool for detecting temperature in drill hole in real time
CN204098942U (en) The force-measuring anchor stock of high stress tunnel
CN210858693U (en) Drilling parameter monitoring device of underground drilling machine
CN203035191U (en) Drilling pressure measuring device
CN109779687B (en) Drilling cuttings amount testing device and method based on pressure sensor
CN102914428A (en) Test device for screw drilling tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111116

Termination date: 20120516