CN202023353U - Integral lifting scaffold for building operations - Google Patents

Integral lifting scaffold for building operations Download PDF

Info

Publication number
CN202023353U
CN202023353U CN2011201108640U CN201120110864U CN202023353U CN 202023353 U CN202023353 U CN 202023353U CN 2011201108640 U CN2011201108640 U CN 2011201108640U CN 201120110864 U CN201120110864 U CN 201120110864U CN 202023353 U CN202023353 U CN 202023353U
Authority
CN
China
Prior art keywords
scaffold
base
wall
guide rail
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201108640U
Other languages
Chinese (zh)
Inventor
张强生
李秀华
谢德法
徐国福
丁显华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHONGYUAN CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGSU ZHONGYUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGYUAN CONSTRUCTION GROUP CO Ltd filed Critical JIANGSU ZHONGYUAN CONSTRUCTION GROUP CO Ltd
Priority to CN2011201108640U priority Critical patent/CN202023353U/en
Application granted granted Critical
Publication of CN202023353U publication Critical patent/CN202023353U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides an integral lifting scaffold for building operations. The bottom of the scaffold is provided with a base, wherein the inner side of the base is provided with a connecting plate; the connecting plate is connected with a concrete-placed wall body by using a wall penetrating bolt; a cross beam extending to the middle part of the scaffold is connected with the wall body; a lifting ring is mounted below the cross beam; an electric hoist is mounted on the lifting ring; the lifting ring below the electric hoist is connected onto the base of the scaffold; a vertical guide rail is mounted on the outer side of the wall body; an opening groove is arranged on the guide rail; a movable fastener is connected onto a vertical rod on the inner side of the scaffold; and a transverse connecting rod is mounted on the fastener. A connecting bolt of the scaffold and the wall body is loosened, the electric hoist is operated, and the ascending or the descending of the scaffold is achieved. The scaffold provided by the utility model has the advantages of little material consumption, little labor expense, short construction period and low fabricating cost.

Description

The building operations integral hoisting scaffold
Technical field
The utility model relates to construction implement, is specifically related to a kind of high-building construction integral hoisting scaffold.
Background technology
The scaffold that sets up for the construction of highrise building, traditional way is to set up scaffold from ground, how high high-rise building have, how high the scaffold that sets up also have, its weak point is: the consumptive material of scaffold is many, workman's work expenditure is big, and it is long in time limit to finish building operations, the overall cost height of high-rise building.
The utility model content
The purpose of this utility model is to provide the high-building construction integral hoisting scaffold in order to overcome above-mentioned weak point, and the consumptive material of scaffold is few, and workman's work expenditure is little, and it is short relatively to finish the building operations duration, and the overall cost of high-rise building is low relatively.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of building operations integral hoisting scaffold is by steel pipe, the double steel pipe scaffold of the 4-8 joint operating platform that fastener is formed, base is arranged at the bottom at scaffold, there is the bar of elongation the inboard of base, rod end is connected with junction plate, with through-wall bolt with junction plate and the placing of concrete body of wall couple together, bear the bearing capacity of whole scaffold in order to strengthen base, Connection Block is equipped with in the outside at the base lower edge, Connection Block and base lower edge are affixed with bolt, Connection Block also is equipped with in body of wall outside below base, Connection Block and body of wall are affixed with bolt, between two Connection Blocks, diagonal brace is housed, the lifting of scaffold realizes by hoisting mechanism, link to each other with body of wall and to be connected to a crossbeam, stretch middle part at scaffold, suspension ring are housed below crossbeam, electric block is installed on the suspension ring, the suspension ring of electric block below are connected on the scaffold base, in wall outer side vertical guide rail is housed, has open slot on the guide rail, on the medial shaft straight-bar of scaffold, be connected with movable fastener, horizontal connecting rod is housed on the fastener, movable fastener is affixed with bolt, the other end of connecting rod has fork, bearing pin is equipped with roller in the fork, roller is against the open slot inner edge of guide rail, along the guide rail scroll-up/down, at the omoplate position of fork spin is housed in open slot, peristome at open slot is screwed clamp, and the inner edge and the spin of clamp contact; At the new placing of concrete body of wall mounting guide rail for the treatment of, when the needs hoisting scaffold, unclamp the connecting bolt of scaffold and body of wall, the operation electric block is realized the rising or the decline of scaffold.
Effective effect of the present utility model is, a kind of building operations integral hoisting scaffold, and the consumptive material of scaffold is few, and workman's work expenditure is little, and it is short relatively to finish the building operations duration, and the overall cost of high-rise building is low relatively.
Description of drawings
Fig. 1 is the structural representation of high-building construction integral hoisting scaffold of the present utility model.
Among the figure 1, placing of concrete body of wall, 2, through-wall bolt, 3, junction plate, 4, movable fastener, 5, connecting rod, 6, guide rail, 7, treat the placing of concrete body of wall, 8, scaffold, 9, crossbeam, 10, suspension ring, 11, electric block, 12, base, 13, diagonal brace, 14, bolt, 15, Connection Block.
Fig. 2 is the A-A cutaway view Amplified image among Fig. 1.
Among the figure 1, placing of concrete body of wall, 4, movable fastener, 5, connecting rod, 6, guide rail, 16, roller, 17, bearing pin, 18, fork, 19, screw, 20, clamp, 21, bolt, 22, vertical bar, 23, spin.
The specific embodiment
The utility model building operations integral hoisting scaffold, the specific embodiment is:
Scaffold (8) is by steel pipe, the double steel pipe scaffold of the 4-8 joint operating platform that fastener is formed, in the bottom of scaffold (8) base (12) is arranged, there is the bar of elongation the inboard of base (12), rod end is connected with junction plate (3), with through-wall bolt (2) with junction plate (3) and placing of concrete body of wall (1) couple together, bear the bearing capacity of whole scaffold (8) in order to strengthen base (12), Connection Block (15) is equipped with in the outside at base (12) lower edge, Connection Block (15) is affixed with bolt (14) with base (12) lower edge, Connection Block (15) also is equipped with in body of wall outside in base (12) below, Connection Block (15) is affixed with bolt (14) with body of wall (1), diagonal brace (13) is housed between two Connection Blocks (15), the lifting of scaffold (8) realizes by hoisting mechanism, link to each other with body of wall and to be connected to a crossbeam (9), stretch middle part at scaffold, in the below of crossbeam (9) suspension ring (10) are housed, electric block (11) is installed on the suspension ring (10), the suspension ring of electric block (11) below then are connected on the scaffold base (12), in wall outer side vertical guide rail (6) is housed, guide rail has open slot on (6), on the medial shaft straight-bar (22) of scaffold, be connected with movable fastener (4), horizontal connecting rod (5) is housed on the fastener, movable fastener (4) is affixed with bolt (21), the other end of connecting rod (5) has fork (18), with bearing pin (17) roller (16) is housed in the fork (18), roller (16) is against the open slot inner edge of guide rail (6), in open slot along guide rail (6) scroll-up/down, spin (23) is equipped with at omoplate position at fork (18), at peristome screw (19) fixing chuck plate (20) of open slot, the inner edge of clamp (22) and spin (23) contact; At new placing of concrete body of wall (7) upper mounting rail (6) for the treatment of, when the needs hoisting scaffold, unclamp the connecting bolt of scaffold and body of wall, operation electric block (11) is realized the rising or the decline of scaffold (8).

Claims (1)

1. a building operations integral hoisting scaffold is by steel pipe, the double steel pipe scaffold of the 4-8 joint operating platform that fastener is formed, base is arranged at the bottom at scaffold, there is the bar of elongation the inboard of base, rod end is connected with junction plate, with through-wall bolt with junction plate and the placing of concrete body of wall couple together, Connection Block is equipped with in the outside at the base lower edge, Connection Block and base lower edge are affixed with bolt, Connection Block also is equipped with in body of wall outside below base, Connection Block and body of wall are affixed with bolt, between two Connection Blocks, diagonal brace is housed, link to each other with body of wall and to be connected to a crossbeam, stretch middle part at scaffold, suspension ring are housed below crossbeam, electric block is installed on the suspension ring, the suspension ring of electric block below are connected on the scaffold base, in wall outer side vertical guide rail is housed, has open slot on the guide rail, on the medial shaft straight-bar of scaffold, be connected with movable fastener, horizontal connecting rod is housed on the fastener, movable fastener is affixed with bolt, the other end of connecting rod has fork, bearing pin is equipped with roller in the fork, roller is against the open slot inner edge of guide rail, along the guide rail scroll-up/down, at the omoplate position of fork spin is housed in open slot, peristome at open slot is screwed clamp, and the inner edge and the spin of clamp contact.
CN2011201108640U 2011-04-15 2011-04-15 Integral lifting scaffold for building operations Expired - Lifetime CN202023353U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201108640U CN202023353U (en) 2011-04-15 2011-04-15 Integral lifting scaffold for building operations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201108640U CN202023353U (en) 2011-04-15 2011-04-15 Integral lifting scaffold for building operations

Publications (1)

Publication Number Publication Date
CN202023353U true CN202023353U (en) 2011-11-02

Family

ID=44848306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201108640U Expired - Lifetime CN202023353U (en) 2011-04-15 2011-04-15 Integral lifting scaffold for building operations

Country Status (1)

Country Link
CN (1) CN202023353U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321400A (en) * 2012-03-23 2013-09-25 肖玉光 Lift type scaffold with manual winch and slide
CN104695695A (en) * 2013-12-04 2015-06-10 姚磊 Guiding device of externally hung scaffold
CN110259096A (en) * 2019-06-26 2019-09-20 重庆科技学院 The certainly mobile operation platform of civil engineering and its application method
CN115653275A (en) * 2022-12-09 2023-01-31 中建八局第二建设有限公司 Construction operation platform and construction method for building eave

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321400A (en) * 2012-03-23 2013-09-25 肖玉光 Lift type scaffold with manual winch and slide
CN104695695A (en) * 2013-12-04 2015-06-10 姚磊 Guiding device of externally hung scaffold
CN110259096A (en) * 2019-06-26 2019-09-20 重庆科技学院 The certainly mobile operation platform of civil engineering and its application method
CN115653275A (en) * 2022-12-09 2023-01-31 中建八局第二建设有限公司 Construction operation platform and construction method for building eave

Similar Documents

Publication Publication Date Title
CN202023353U (en) Integral lifting scaffold for building operations
CN102943561B (en) Overhead working hanging basket anti-sway device
CN201260050Y (en) 220KV bracket for replacing bus bar column insulator
CN201232353Y (en) High pier lifting type turnover formwork platform hanger
CN205421890U (en) Die carrier bearing beam
CN202882376U (en) Elevator shaft template support platform
CN205077842U (en) Multi -use architecture support
CN204024079U (en) Prefabricated assembled Metro Station Structure quick tensioning equipment
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN201236477Y (en) Integral climbing scaffold for high-rise building
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN202323727U (en) Device for adjusting horizontal position of steel box girder
CN203050106U (en) Integral hoisting balcony mould
CN201873949U (en) Bride prestress stretch-draw trolley
CN201062431Y (en) Lifting device of cantilever scaffold
CN202829498U (en) Hydraulic jacking device
CN207774680U (en) A kind of portable mechanism jacking apparatus
CN202000266U (en) Supporting structure of bridge coping template
CN206768613U (en) For the U-shaped beam of auxiliary erection urban rail and the moving hanging basket of tensioning bent cap
CN201151954Y (en) Steel column and concrete column connection structure
CN201671317U (en) Attached scaffold supporting device with improved structure
CN201756788U (en) Internally arranged construction bench moving according to floors of elevator shaft under construction
CN205476450U (en) A light -duty automatic lifting die carrier of concave formula for surpassing construction of high rise elevator well vertical structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20111102