CN201991241U - Steel structural upright column foundation bolt positioning device - Google Patents

Steel structural upright column foundation bolt positioning device Download PDF

Info

Publication number
CN201991241U
CN201991241U CN2011200890842U CN201120089084U CN201991241U CN 201991241 U CN201991241 U CN 201991241U CN 2011200890842 U CN2011200890842 U CN 2011200890842U CN 201120089084 U CN201120089084 U CN 201120089084U CN 201991241 U CN201991241 U CN 201991241U
Authority
CN
China
Prior art keywords
steel
foundation bolt
steel work
upright column
stone bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200890842U
Other languages
Chinese (zh)
Inventor
姜成龙
朱永山
周善喜
张冬利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ke Lu Maintenance Technology Co Ltd Of Xiuqian City
Original Assignee
Ke Lu Maintenance Technology Co Ltd Of Xiuqian City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ke Lu Maintenance Technology Co Ltd Of Xiuqian City filed Critical Ke Lu Maintenance Technology Co Ltd Of Xiuqian City
Priority to CN2011200890842U priority Critical patent/CN201991241U/en
Application granted granted Critical
Publication of CN201991241U publication Critical patent/CN201991241U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a steel structural upright column foundation bolt positioning device, which mainly consists of an upper rectangular frame, a lower rectangular frame and a height adjusting rod. The size of the upper rectangular frame is equal to that of the lower rectangular frame, two foundation bolt hole limiting parts are connected between two long borders of the upper frame, a gradienter mounting part is disposed between middle section positions of the two foundation bolt hole limiting parts, and two infrared lamps are respectively arranged at centers of two short borders of the upper frame. The steel structural upright column foundation bolt positioning device can fast and accurately position foundation bolt holes according to design paper of steel upright column positions of a steel structural building, and accurately positions steel upright columns for arrangement and trending. Compared with an existing method that embedding operation of foundation bolts depends on measurement of scales, the steel structural upright column foundation bolt positioning device has obvious advantages and actual effects, reduces physical labor of operators and improves work efficiency.

Description

Steel work column stone bolt positioner
Technical field:
The utility model relates to the positioner that object is installed, and is specifically related to steel work column stone bolt positioner.
Background technology:
In the modern architecture, the application of steel work is very general.The building of steel work generally must be installed many root posts to support, to bear the pressure that comes from top girder steel or steelframe in the process that makes up.The installation of column must be in ground pre-embedded anchoring bolts so that the steel work column is by firmly taking root with being connected of stone bolt.Thereby the standardization that stone bolt is pre-buried is directly connected to the reliability that the steel work column is installed, and then has influence on the build guality of steel construction.To at present, the burying work beforehand of stone bolt is that operation is finished by the people all.The people mainly relies on chi tool tolerance to determine the pre-buried point and the pre-buried degree of depth when the operation, therefore has error, and it is heavy to work, personnel's hard work, defective such as efficient is on the low side.
Summary of the invention:
The utility model provides a kind of steel work column stone bolt positioner, and its purpose is to use this designed device, realizes steel work column stone bolt is accurately located fast and effectively.
The technical solution of the utility model:
The utility model is mainly by the rectangle upper frame body, the lower frame body that are equal to size, with and four frame angles form by the height regulating rod that munnion was connected.Wherein, between two long margin frames of upper frame body, be connected with two anchor (bolt) hole locating parts, this locating part is parallel to the minor face frame; And being provided with the level gauge installed part between the section in two anchor (bolt) hole locating parts, this installed part is parallel to long margin frame; The centre of upper frame body two minor face frames respectively is provided with an infrared lamp.
Further technical scheme of the present utility model:
The long margin frame length of described upper and lower framework equates with the long edge lengths in cross section, steel post basis.
Be laid with three spacing holes on described each anchor (bolt) hole locating part, the middle part spacing hole equate to the distance of all the other two spacing holes.
The anchor (bolt) hole at the level gauge on the described level gauge installed part, two infrared lamps and two positions that mediate is located along the same line.
Described height regulating rod is provided with down screw rod, screwed pipe and knob, and following screw rod is arranged on the footing of munnion, and knob is connected with the upper end of screwed pipe, and the screwed pipe bottom is provided with internal thread and spins with following screw rod external screw thread.
A short edge of described lower frame body is dismountable motion bar.
The frame of described upper and lower framework and the munnion that is attached thereto are angle steel; Described two anchor (bolt) hole locating parts and level gauge installed part are channel-section steel.
The beneficial effects of the utility model
The utility model can be according to the design drawing of steel construction, be steel post anchor (bolt) hole location quickly and accurately, for steel post is arranged accurately location of trend, all rely on chi tool tolerance to compare with the burying work beforehand of the stone bolt of present stage, have obvious advantage and actual effect, and alleviated operating personnel's manual labor, improved operating efficiency.
Description of drawings
Accompanying drawing 1 is the utility model structural representation.
The specific embodiment:
As shown in the figure,
Four frame angles of upper frame body 1 of the present utility model, lower frame body 2 are connected with munnion 3, and height regulating rod 4 stands upright on the footing 31 of munnion 3.The following screw rod 41 of height regulating rod and the welding of screwed pipe 42 lower ends, knob 43 is connected the upper end of screwed pipe.Between two long margin frames of upper frame body, be provided with between 5, two anchor (bolt) hole locating parts of two anchor (bolt) hole locating parts and be provided with level gauge installed part 6; The centre of upper frame body two minor face frames respectively is provided with an infrared lamp 7.Be laid with on each anchor (bolt) hole locating part by branches such as design three spacing holes 51 at interval, middle spacing hole and level gauge 61 and two infrared lamps are laid on the same straight line.
Lower frame body is provided with dismountable motion bar 21.
Below in conjunction with accompanying drawing, sketch the using method of this device:
(1) according to the laying drawing of steel construction steel post, at the foundation surface vertical line that two x wires equating with the long hem width degree of steel post basis lateral cross section and the arrangement of expression steel post move towards that draws; Put by position shown in the figure, note the home record of minor face frame munnion and two x wires are harmonious;
(2) with the translation of this device (in order to install conveniently moving, dismounting motion bar as required) surrounds the reinforcing cage that concrete foundation leaves, open infrared lamp, adjust and move this device, make the vertical irradiation point of two infrared lamps all drop on the vertical line in alignment with the vertical line position;
(3) by adjusting the knob of height regulating rod, make the bubble of level gauge placed in the middle, up with the end of thread of six roots of sensation stone bolt, insert respectively in each spacing hole, adjust after the height of stone bolt, foundation bolt is welded on the reinforcing cage, to treat placing of concrete once more.
This device can be realized precisely locating fast of steel construction steel post stone bolt, has reached the goal of the invention of expection.

Claims (7)

1. steel work column stone bolt positioner, it is characterized in that: it is mainly by the rectangle upper frame body, the lower frame body that are equal to size, with and four frame angles form by the height regulating rod that munnion was connected, wherein, between two long margin frames of upper frame body, be connected with two anchor (bolt) hole locating parts, this locating part is parallel to the minor face frame; And being provided with the level gauge installed part between the section in two anchor (bolt) hole locating parts, this installed part is parallel to long margin frame; The centre of upper frame body two minor face frames respectively is provided with an infrared lamp.
2. steel work column stone bolt positioner according to claim 1 is characterized in that: the long margin frame length of described upper and lower framework equates with the long edge lengths in cross section, steel column basis.
3. steel work column stone bolt positioner according to claim 1 is characterized in that: be laid with three spacing holes on described each anchor (bolt) hole locating part, the spacing hole of middle part equates to the distance of all the other two spacing holes.
4. steel work column stone bolt positioner according to claim 1 is characterized in that: the level gauge of described level gauge installed part, two infrared lamps are located along the same line.
5. steel work column stone bolt positioner according to claim 1, it is characterized in that: described height regulating rod is provided with down screw rod, screwed pipe and knob, following screw rod is arranged on the footing of munnion, knob is connected with the upper end of screwed pipe, and the screwed pipe bottom is provided with internal thread and spins with following screw rod external screw thread.
6. steel work column stone bolt positioner according to claim 1 is characterized in that: a short edge of described lower frame body is dismountable motion bar.
7. steel work column stone bolt positioner according to claim 1, it is characterized in that: the frame of described upper and lower framework and the munnion that is attached thereto are angle steel; Described two anchor (bolt) hole locating parts and level gauge installed part are channel-section steel.
CN2011200890842U 2011-03-30 2011-03-30 Steel structural upright column foundation bolt positioning device Expired - Fee Related CN201991241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200890842U CN201991241U (en) 2011-03-30 2011-03-30 Steel structural upright column foundation bolt positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200890842U CN201991241U (en) 2011-03-30 2011-03-30 Steel structural upright column foundation bolt positioning device

Publications (1)

Publication Number Publication Date
CN201991241U true CN201991241U (en) 2011-09-28

Family

ID=44667730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200890842U Expired - Fee Related CN201991241U (en) 2011-03-30 2011-03-30 Steel structural upright column foundation bolt positioning device

Country Status (1)

Country Link
CN (1) CN201991241U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561712A (en) * 2012-01-11 2012-07-11 中国建筑第二工程局有限公司 Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof
CN102704697A (en) * 2012-07-06 2012-10-03 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102817481A (en) * 2012-08-15 2012-12-12 中建钢构有限公司 Detachable supporting frame of steel column embedded part
CN102962621A (en) * 2012-12-04 2013-03-13 马钢(集团)控股有限公司 Automatic centering welding deice for bolts of shell liner of mixing machine
CN103485549A (en) * 2013-09-23 2014-01-01 中国五冶集团有限公司 Large embedded part location device and method
CN105089271A (en) * 2015-09-09 2015-11-25 成都蒲江珂贤科技有限公司 Mechanical embedded bolt positioning and installing assembly
CN105696800A (en) * 2016-01-21 2016-06-22 中建钢构有限公司 Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts
CN105715055A (en) * 2014-12-02 2016-06-29 中国核工业二四建设有限公司 Adjustable tool for large-scale penetration piece in nuclear power station and adjusting method
TWI596265B (en) * 2016-05-13 2017-08-21 承錡鋼鐵股份有限公司 Structure assembly of positioning and adjusting device
CN108691423A (en) * 2017-04-05 2018-10-23 通州建总集团有限公司 A kind of foundation bolt assembling fixing device
CN109113358A (en) * 2018-10-22 2019-01-01 中国建筑局(集团)有限公司 Be used for pre-buried stop device of rag bolt
CN109339093A (en) * 2018-10-15 2019-02-15 中冶天工集团天津有限公司 A kind of quick locating rack of bolt and its application method
CN113404079A (en) * 2021-06-02 2021-09-17 中交(昆明)建设有限公司 Lamp pole foundation installation adjusting device and construction method

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561712B (en) * 2012-01-11 2014-04-09 中国建筑第二工程局有限公司 Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof
CN102561712A (en) * 2012-01-11 2012-07-11 中国建筑第二工程局有限公司 Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof
CN102704697A (en) * 2012-07-06 2012-10-03 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102704697B (en) * 2012-07-06 2014-06-18 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102817481A (en) * 2012-08-15 2012-12-12 中建钢构有限公司 Detachable supporting frame of steel column embedded part
CN102962621A (en) * 2012-12-04 2013-03-13 马钢(集团)控股有限公司 Automatic centering welding deice for bolts of shell liner of mixing machine
CN102962621B (en) * 2012-12-04 2014-12-17 马钢(集团)控股有限公司 Automatic centering welding deice for bolts of shell liner of mixing machine
CN103485549A (en) * 2013-09-23 2014-01-01 中国五冶集团有限公司 Large embedded part location device and method
CN103485549B (en) * 2013-09-23 2015-09-23 中国五冶集团有限公司 Based on the localization method to large-scale built-in fitting
CN105715055B (en) * 2014-12-02 2018-07-06 中国核工业二四建设有限公司 A kind of nuclear power station large size penetration piece adjustable tool and adjusting method
CN105715055A (en) * 2014-12-02 2016-06-29 中国核工业二四建设有限公司 Adjustable tool for large-scale penetration piece in nuclear power station and adjusting method
CN105089271A (en) * 2015-09-09 2015-11-25 成都蒲江珂贤科技有限公司 Mechanical embedded bolt positioning and installing assembly
CN105696800A (en) * 2016-01-21 2016-06-22 中建钢构有限公司 Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts
CN105696800B (en) * 2016-01-21 2018-08-14 中建钢构有限公司 Anti- steel construction sill anchor construction generates relative displacement and is fixed temporarily stock
TWI596265B (en) * 2016-05-13 2017-08-21 承錡鋼鐵股份有限公司 Structure assembly of positioning and adjusting device
CN108691423A (en) * 2017-04-05 2018-10-23 通州建总集团有限公司 A kind of foundation bolt assembling fixing device
CN109339093A (en) * 2018-10-15 2019-02-15 中冶天工集团天津有限公司 A kind of quick locating rack of bolt and its application method
CN109113358A (en) * 2018-10-22 2019-01-01 中国建筑局(集团)有限公司 Be used for pre-buried stop device of rag bolt
CN109113358B (en) * 2018-10-22 2024-04-09 中国建筑一局(集团)有限公司 Limiting device for embedding foundation bolts
CN113404079A (en) * 2021-06-02 2021-09-17 中交(昆明)建设有限公司 Lamp pole foundation installation adjusting device and construction method

Similar Documents

Publication Publication Date Title
CN201991241U (en) Steel structural upright column foundation bolt positioning device
CN208009467U (en) A kind of foundation bolt installation control device
CN203361660U (en) Verticality adjustment and fixing device of reverse-building-method steel stand column
CN204059395U (en) The pre-buried location structure of stone bolt
CN201065533Y (en) Steel pile column perpendicularity regulating and controlling device
CN203783165U (en) Multi-directional accurate adjusting device for embedded part
CN203247603U (en) High-order rag bolt positioner
CN104032969A (en) Precise positioning and process regulation and control device for vibration isolation support embedded plate
CN203097393U (en) Power transmission tower with adjustable tower foot plate
CN102926538A (en) Reaction box and construction method of reaction wall
CN104912191B (en) Assembled concrete fabricated column splicing device and use method of splicing device
CN204238570U (en) The spiral adjuster of absolute altitude of frame ball node is installed
CN203939041U (en) Adjustable steel structural column lower margin
CN202081427U (en) Embedded bolt positioning device for tower crane foundation
CN203866974U (en) Embedded bolt set positioning device
CN205259603U (en) Centre form braced system
CN206220117U (en) For the positioner of column foot
CN105040719A (en) Construction positioning device for photovoltaic pile foundation and construction method for photovoltaic pile foundation
CN205908034U (en) SRC column base plate locating support
CN104594143A (en) Inner supporting type screw adjuster and track skeleton positioning method
CN202865867U (en) Pre-buried screw spatial locator
CN206495329U (en) Adjustable high-precision foundation bolt reinforcing mold and reinforcing system
CN203639934U (en) Pre-buried positioning device for equipment foundation bolt
CN109201971A (en) For making the positioning device and its construction method of pile foundation steel bar cage
CN205369950U (en) Built -in fitting locator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20130330