CN201984125U - Quick analysis and post-processing system for on-site test data of primary power equipment - Google Patents
Quick analysis and post-processing system for on-site test data of primary power equipment Download PDFInfo
- Publication number
- CN201984125U CN201984125U CN2011200363736U CN201120036373U CN201984125U CN 201984125 U CN201984125 U CN 201984125U CN 2011200363736 U CN2011200363736 U CN 2011200363736U CN 201120036373 U CN201120036373 U CN 201120036373U CN 201984125 U CN201984125 U CN 201984125U
- Authority
- CN
- China
- Prior art keywords
- test data
- test
- analysis
- electric power
- primary equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model discloses a quick analysis and post-processing system for the on-site test data of primary power equipment, which comprises a test instrument, a cell phone client terminal and a remote server; the test instrument is used for carrying out an on-site test to the primary power equipment; the cell phone client terminal is used for recording and sending the on-site test data, and receiving the analysis conclusions and test suggestions of the remote server; the remote server is used for storing and analyzing the on-site test data sent by the cell phone client terminal, obtaining test conclusions and presenting test suggestions, generating test reports automatically according to the needs of a client, analyzing the on-site test data in the past years, and presenting precise quantitative bases; and the cell phone client terminal and the remote server are wirelessly connected. The utility model provides the quick analysis and post-processing system for the on-site test data of the primary power equipment capable of improving the on-site test data processing capability, shortening the insulation test time of the primary power equipment and improving the on-site test quality, so that the reliability, safety and stability in power utilization of a power grid are further improved.
Description
Technical field
The utility model relates to power equipment site test technical field, particularly a kind of express-analysis and after-treatment system of electric power primary equipment field test data.
Background technology
Continuous progress along with rapid development of social economy and science and technology, the demand of the electric energy of entire society is increasing, the electrical network scale constantly enlarges, thereby the security and the reliability of electric system proposed stricter requirement, and user's electricity consumption reliability has been proposed more and more higher target.Electric power primary equipment site test is to guarantee the important component part of power network safety operation, it is the key factor that improves the electricity consumption reliability, therefore the quality and the efficient that improve electric power primary equipment site test help to improve power system safety and stability and electricity consumption reliability, thereby provide electric power safeguard for the fast and stable development of national economy.
Electric power primary equipment site test comprises commissioning test, preventive trial and overhaul test.Commissioning test is for the hidden danger of finding that new electric power primary equipment produces in design, manufacturing, transportation, installation process, diagnoses it whether to meet the condition that puts into operation, and it is tested; Preventive trial is in order to find the hidden danger of equipment in service, and prevention has an accident or device damage and the electric power primary equipment is tested; The overhaul test is for ensureing that the electric power primary equipment after the overhaul has qualified electric property, to its severe test of carrying out.
Existing power primary equipment site test is the essential information and the historical test data of preparation machine before task begins, assign test report in the working site, carry out the pilot project of corresponding device, fill in the equipment test data, convert and the analytical test data last judgment device running status.Yet commissioning test, it is different that performed standard is tested in preventive trial and overhaul, the work quantitative change that will cause making the site test report is big, many and the experimental enviroment variation of the project of site test greatly, this field test data that converts is big to the workload of the same experimental enviroment of historical data, especially in preventive trial, if equipment operation for many years, need historical data and the device data amount under the same working environment relatively bigger, so all multifactor inefficiencies that causes site test, it is long to carry out the T.T. that site test need have a power failure, and has influenced the electricity consumption reliability.
Under the requirement of stability of power system and the raising of electricity consumption reliability, carry out site test and be faced with cycle weak point, electric power primary equipment and the many problems of pilot project, so the testing ground needs a large amount of test figure of artificial treatment.Particularly the field test data of part electric power primary equipment also needs to carry out at the scene formula and calculates and could obtain this test for data, then utilize the historical data of this test figure and this equipment, the device data of same model compares analysis under same working environment, judges the runnability of this equipment.And after finishing, site test needs to put in order at short notice and submit to the test report of all devices.Therefore at present there is the ambiguous problem of existing test standard that the field test data amount is big, form test report many, judgement field test data consuming time of analyzing in electric power primary equipment site test.
The utility model content
The purpose of this utility model is the deficiency that exists at the above prior art, provides that a kind of cost is low, the express-analysis of good stability, electric power primary equipment field test data that reliability is high with aftertreatment is.
The technical scheme that the utility model is taked is such: the express-analysis of electric power primary equipment field test data and aftertreatment system comprise
Test apparatus: the site test that is used to carry out electric primary equipment;
Cell-phone customer terminal: be used to realize the recording and sending field test data, the analysis conclusion of receiving remote server and test suggestion;
Remote server: be used to store and analyze the field test data that cell-phone customer terminal sends over, draw conclusion (of pressure testing) and propose the test suggestion, generate test report automatically, analyze field test data over the years and propose definite quantification criterion according to customer requirements;
Be wireless connections between described cell-phone customer terminal and the remote server.
Described electric primary equipment comprises transformer, isolating switch, current transformer, voltage transformer (VT), lightning arrester, capacitor, reactor and sleeve pipe.
Described test apparatus comprises megohmmeter, dielectric loss instrument, DC resistance meter, high voltage direct current generator, loop resistance, capacitance bridge and RLC electric bridge.
Described cell-phone customer terminal can be the smart mobile phone of selling on the existing market.
Described remote server is connected with the GPRS data communication module by serial ports.
Described cell-phone customer terminal is connected with remote server by the GPRS wireless network.
The utility model utilizes the development of smart mobile phone and mechanics of communication constantly to reform, utilize the essential information that smart mobile phone can be by carrying out equipment and the record and the inquiry of historical data, handwriting mode is realized the record of field test data, finish the function that data were handled and analyzed to remote server by GPRS network, and pass the site test conclusion fast back and test suggestion, and can remedy the vague definition that has now in the rules by analyzing the more definite quantification criterion of a large amount of historical datas propositions, improve the efficient of power equipment Insulation Test, reached the double goal that high-quality is finished test and shortened test period.
Compared with prior art, the beneficial effects of the utility model are: with transformer, isolating switch, current transformer, voltage transformer (VT), lightning arrester, capacitor, reactor and sleeve pipe are subjects, with megohmmeter, the dielectric loss instrument, DC resistance meter, high voltage direct current generator, loop resistance, smart mobile phone, capacitance bridge, the RLC electric bridge, GPRS data communication module and computing machine are hardware condition, by smart mobile phone client records test figure, reception test conclusion and test suggestion, the computer remote server carries out data analysis and aftertreatment just can improve the efficient and the electricity consumption reliability of the test of electric power primary equipment.Adapt to era development trend, have directly perceived, fast, advanced characteristics such as safety.Remedy the inefficient shortcoming of traditional experiment method, played the effect that improves site test efficient, and can in time propose the test suggestion.Be express-analysis and after-treatment system with a kind of electric power primary equipment field test data of brand new ideas.This system based on electric primary equipment, test apparatus, smart mobile phone and computing machine develop jointly have that cost is low, good stability, advantage that reliability is high.
Description of drawings
Fig. 1 is a system architecture of the present utility model;
Fig. 2 is the block diagram that the utility model obtains test figure;
Fig. 3 is an operational flowchart of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in detail.
As shown in Figure 1, the utility model is made up of electric primary equipment, test apparatus, cell-phone customer terminal and remote server to be tested.Test apparatus carries out the site test of electric primary equipment; Cell-phone customer terminal is realized the analysis conclusion and the test suggestion of recording and sending field test data, receiving remote server; Server is responsible for the storage and the analysis of field test data, draw conclusion (of pressure testing) and propose the test suggestion, automatically generate test report according to customer requirements, analyze field test data over the years and propose more definite quantification criterion and remedy the vague definition that has now in the rules, thereby reach the purpose that improves site test efficient and shorten test period, further improve the electricity consumption reliability of electrical network.Concrete processing procedure as shown in Figure 3.
Referring to Fig. 2, concrete, the express-analysis and the after-treatment system of electric power primary equipment field test data are made of transformer 1, isolating switch 2, current transformer 3, voltage transformer (VT) 4, lightning arrester 5, capacitor 6, reactor 7, sleeve pipe 8, megohmmeter 9, dielectric loss instrument 10, DC resistance meter 11, high voltage direct current generator 12, loop resistance 13, smart mobile phone 14, capacitance bridge 15, RLC electric bridge 16, GPRS data communication module 17 and computing machine 18 etc.; Wherein megohmmeter 9, dielectric loss instrument 10, DC resistance meter 11, measuring transformer 1, megohmmeter 9, dielectric loss instrument 10, loop resistance 13 are measured isolating switch 2; Megohmmeter 9 and dielectric loss instrument 10 are measured current transformer 3, voltage transformer (VT) 4; Megohmmeter 9 and high voltage direct current generator 12 are measured lightning arrester 5; Capacitance bridge 15 Measurement of capacitor 6; DC resistance meter 11 and RLC electric bridge 16 are measured reactor 7; Megohmmeter 9, dielectric loss instrument 10 is measured sleeve pipe 8; Smart mobile phone 14 record data also send through GPRS; GPRS data communication module 17 reaches computing machine 18 by serial ports with signal.
Wherein, megohmmeter 9 adopts the electric numerical megger ST2000 of Su Te; Dielectric loss instrument 10 adopts the YHJS-IV dielectric loss instrument of the suitable great electric Science and Technology Ltd. in Shanghai; The HM-ZRC of the western Wuhan of the DC resistance meter 11 employings state magnificent Electric Appliance Equipment Co., Ltd of electricity; High voltage direct current generator 12 adopts the ZGF series high voltage direct current generator of the prosperous sharp power equipment of Wuhan states electricity company limited; Loop resistance 13 adopts the HTHL-100A of China day electric power Automation Co., Ltd; Smart mobile phone 14 adopts Meizu M9, capacitance bridge 15 adopts the HTDR-H of China day electric power Automation Co., Ltd, RLC electric bridge 16 adopts the switch on HP4263A of sub-Instr Ltd. of Zhongshan city China instrument, and GPRS data communication module 17 adopts the R-8552/8554 GPRS DTU of GEMOTECH.
The utility model is not limited to above-mentioned embodiment, if various changes of the present utility model or modification are not broken away from spirit and scope of the present utility model, if these are changed and modification belongs within claim of the present utility model and the equivalent technologies scope, then the utility model also must comprise these changes and modification.
Claims (7)
1. the express-analysis of electric power primary equipment field test data and aftertreatment system is characterized in that: comprise
Test apparatus: the site test that is used to carry out electric primary equipment;
Cell-phone customer terminal: be used to realize the recording and sending field test data, the analysis conclusion of receiving remote server and test suggestion;
Remote server: be used to store and analyze the field test data that cell-phone customer terminal sends over, draw conclusion (of pressure testing) and propose the test suggestion, generate test report automatically, analyze field test data over the years and propose definite quantification criterion according to customer requirements;
Be wireless connections between described cell-phone customer terminal and the remote server.
2. the express-analysis of electric power primary equipment field test data according to claim 1 and aftertreatment system, it is characterized in that: described electric primary equipment comprises transformer, isolating switch, current transformer, voltage transformer (VT), lightning arrester, capacitor, reactor and sleeve pipe.
3. the express-analysis of electric power primary equipment field test data according to claim 1 and aftertreatment system, it is characterized in that: described test apparatus comprises megohmmeter, dielectric loss instrument, DC resistance meter, high voltage direct current generator, loop resistance, capacitance bridge and RLC electric bridge.
4. the express-analysis of electric power primary equipment field test data according to claim 1 and aftertreatment system, it is characterized in that: described cell-phone customer terminal is a smart mobile phone.
5. the express-analysis of electric power primary equipment field test data according to claim 1 and aftertreatment system, it is characterized in that: described remote server is connected with the GPRS data communication module by serial ports.
6. the express-analysis of electric power primary equipment field test data according to claim 5 and aftertreatment system, it is characterized in that: described cell-phone customer terminal is connected with remote server by the GPRS wireless network.
7. the express-analysis of electric power primary equipment field test data according to claim 3 and aftertreatment system, it is characterized in that: described megohmmeter adopts the electric numerical megger ST2000 of Su Te; The dielectric loss instrument adopts the YHJS-IV dielectric loss instrument of the suitable great electric Science and Technology Ltd. in Shanghai; DC resistance meter adopts the HM-ZRC of western Wuhan state magnificent Electric Appliance Equipment Co., Ltd of electricity; High voltage direct current generator adopts the ZGF series high voltage direct current generator of the prosperous sharp power equipment of Wuhan state electricity company limited; Loop resistance adopts the HTHL-100A of China day electric power Automation Co., Ltd; Smart mobile phone adopts Meizu M9, capacitance bridge adopts the HTDR-H of China day electric power Automation Co., Ltd, the RLC electric bridge adopts the switch on HP4263A of sub-Instr Ltd. of Zhongshan city China instrument, and the GPRS data communication module adopts the R-8552/8554 GPRS DTU of GEMOTECH.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200363736U CN201984125U (en) | 2011-02-11 | 2011-02-11 | Quick analysis and post-processing system for on-site test data of primary power equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200363736U CN201984125U (en) | 2011-02-11 | 2011-02-11 | Quick analysis and post-processing system for on-site test data of primary power equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201984125U true CN201984125U (en) | 2011-09-21 |
Family
ID=44611583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200363736U Expired - Fee Related CN201984125U (en) | 2011-02-11 | 2011-02-11 | Quick analysis and post-processing system for on-site test data of primary power equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201984125U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102841948A (en) * | 2012-07-24 | 2012-12-26 | 苏州华电电气股份有限公司 | Test data wireless recorder |
CN103837746A (en) * | 2014-02-24 | 2014-06-04 | 湖北省防雷中心 | Automatic auxiliary system for ground resistance testing |
CN107328994A (en) * | 2017-07-17 | 2017-11-07 | 国家电网公司 | Insulation Resistance of Transformer experimental rig and method |
CN108038588A (en) * | 2017-11-15 | 2018-05-15 | 成都东谷利农农业科技有限公司 | Pesticide field efficacy medicine test management method and device |
CN108761330A (en) * | 2018-09-06 | 2018-11-06 | 国网江苏省电力有限公司海门市供电分公司 | Circuit breakers monitoring device based on intelligent movable equipment and its monitoring method |
-
2011
- 2011-02-11 CN CN2011200363736U patent/CN201984125U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102841948A (en) * | 2012-07-24 | 2012-12-26 | 苏州华电电气股份有限公司 | Test data wireless recorder |
CN103837746A (en) * | 2014-02-24 | 2014-06-04 | 湖北省防雷中心 | Automatic auxiliary system for ground resistance testing |
CN107328994A (en) * | 2017-07-17 | 2017-11-07 | 国家电网公司 | Insulation Resistance of Transformer experimental rig and method |
CN108038588A (en) * | 2017-11-15 | 2018-05-15 | 成都东谷利农农业科技有限公司 | Pesticide field efficacy medicine test management method and device |
CN108761330A (en) * | 2018-09-06 | 2018-11-06 | 国网江苏省电力有限公司海门市供电分公司 | Circuit breakers monitoring device based on intelligent movable equipment and its monitoring method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102004199B (en) | Alternating current charging post in-situ test device and method | |
CN201984125U (en) | Quick analysis and post-processing system for on-site test data of primary power equipment | |
CN110907884A (en) | Electric energy meter error diagnosis and analysis method based on non-invasive measurement | |
CN104142421B (en) | Converting equipment insulated on-line monitoring system and method for work thereof | |
CN101943719A (en) | Shared-frequency asynchronous phase-checking method | |
CN109298379A (en) | A kind of recognition methods of the intelligent electric meter site error exception based on data monitoring | |
CN204044292U (en) | For the system of gas insulated metal enclosed swit chgear insulation defect partial discharge monitoring | |
CN102323492A (en) | Remote phasing device for cable lines and phasing method thereof | |
CN107436420A (en) | A kind of electric energy metrical remote verification monitoring system and its method of work | |
CN102004200B (en) | Vehicle-mounted filed test device and method of alternating current charging pile | |
CN110187193A (en) | Dielectric loss based on whole station voltage transformer judgement of stability monitors system and method | |
CN102043105B (en) | Full-function test device and test method of AC (alternating current) charging pile | |
CN104820201A (en) | Acquisition terminal performance index evaluation method | |
CN109142862A (en) | A kind of intelligent electrically engineering survey system and its measurement method | |
CN203178369U (en) | Bushing monitoring system for intelligent substation | |
CN103558432A (en) | High-voltage direct connection type electricity stealing detection device | |
AU2014100711A4 (en) | A patrol verification experimental system of power transmission and transformation state maintenance test equipment | |
CN103267912B (en) | A kind of direct current transportation wall bushing risk evaluating system and methods of risk assessment | |
CN203965034U (en) | A kind of electrical transformer cores and winding failure on-line monitoring system | |
CN105823998A (en) | Energy efficiency monitoring terminal automatic performance detection system and method and correlated monitoring method | |
CN205120822U (en) | Intelligent anti -electricity -theft system of high pressure | |
CN103439616A (en) | Transformation-loss precision-measurement device | |
CN204304620U (en) | A kind of voltage quality monitoring integral system | |
CN203275554U (en) | Multipoint electric power parameter monitoring management system based on ARM and WinCE | |
CN203069698U (en) | An integrated information acquiring device of electric energy in a transformer station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110921 Termination date: 20140211 |