CN201961969U - Large-scale portal crane girder structure - Google Patents

Large-scale portal crane girder structure Download PDF

Info

Publication number
CN201961969U
CN201961969U CN2011200904686U CN201120090468U CN201961969U CN 201961969 U CN201961969 U CN 201961969U CN 2011200904686 U CN2011200904686 U CN 2011200904686U CN 201120090468 U CN201120090468 U CN 201120090468U CN 201961969 U CN201961969 U CN 201961969U
Authority
CN
China
Prior art keywords
camber
girder
segmentation
beams
girder structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200904686U
Other languages
Chinese (zh)
Inventor
张艳丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elephant King Heavy Industries Co., Ltd.
Original Assignee
JIANGSU ELEPHANT KING CRANE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ELEPHANT KING CRANE CO Ltd filed Critical JIANGSU ELEPHANT KING CRANE CO Ltd
Priority to CN2011200904686U priority Critical patent/CN201961969U/en
Application granted granted Critical
Publication of CN201961969U publication Critical patent/CN201961969U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a large-scale portal crane girder structure, wherein a girder comprises a plurality of sectional beams; each sectional beam has a camber which is calculated according to a camber formula; and when the sectional beams are combined into the girder, smooth and arched curves are respectively formed on the upper and lower surfaces of the girder. The girder structure is conveniently transported and installed, thereby directly promoting the construction progress. By constructing the linear camber, the use ratio of material is enhanced and the cost is lowered.

Description

The large-sized gantry crane main beam structure
Technical field
The utility model is specifically related to a kind of crane girder, particularly a kind of large-sized gantry crane main beam structure.
Background technology
The large-sized gantry crane girder of prior art all is an integral body, and its volume is bigger, and transportation and installation are all inconvenient.Because prior art will be cut according to camber curve after the splicing of girder web finishes again, the volume of girder own is bigger, and cutting process is not easy accuracy control, has too much girder material and is cut, and causes the waste of material, has improved cost.
Summary of the invention
The utility model provides a kind of large-sized gantry crane main beam structure, and purpose is to solve the prior art problem, the girder of provide a kind of convenient transportation, installing, and can not cause the waste of girder material, the degree of utilization of material is higher, and cost-cutting has also guaranteed the camber of girder.
The utility model technical scheme that adopts of dealing with problems is:
The large-sized gantry crane main beam structure, described girder is made of a plurality of segmentation beams, each segmentation beam all has the camber that calculates according to the camber formula, and its upper surface and lower surface formed smooth respectively and have the curve of camber when all segmentation beams were combined together to form girder.
Above-mentioned girder calculates the camber value of each point according to easy formula, and the girder with camber is made of a plurality of segmentation beams, and each segmentation beam is by the prefabricated camber of camber curve value, and each segmentation beam moulding is the straight line camber, has reduced the difficulty of making the curve camber.
The beneficial effects of the utility model: girder is spliced to form by a plurality of segmentation beams, and each segmentation beam all is manufactured with camber in advance.For the bigger girder of span, segmentation both convenient transportation has reduced the also strong assurance of cost of transportation girder camber has reduced the waste of material, has improved the Occupation coefficient of material, cost-cutting.
Description of drawings
Fig. 1 is a structural representation after the assembly unit of the present utility model;
Fig. 2 is the structural representation of single split beam.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Large-sized gantry crane main beam structure as shown in Fig. 1, Fig. 2, described girder 1 is made of a plurality of segmentation beams 2, each segmentation beam 2 all has the camber that calculates according to the camber formula, and its upper surface and lower surface formed smooth respectively and have the curve of camber when all segmentation beams 2 were combined together to form girder.Each segmentation beam 2 be one up big and down small trapezoidal, four limits of each segmentation beam are straight line.
When the large gantry crane girder is made, because deadweight, lifting appliance (upper and lower dolly) and the welding deformation of girder itself will cause girder bending-down, so when making, certain camber (camber 〉=following amount of deflection) will be set.
When the segmentation beam was made, its camber separately calculated according to following formula.
Following amount of deflection (f) is divided three parts: (∑ f=f1+f2+f3)
The following amount of deflection that a, lifting appliance (dolly up and down) and weight produce is f1;
The following amount of deflection that b, deadweight produce is f2;
The following amount of deflection that c, making welding deformation produce is f3;
(annotate: a, b can be according to calculating, and the welding winding degree is pressed empirical equation
Figure BSA00000463504700031
)
The camber formula: Y = 4 f ( L - X ) * X L 2
In the formula: amount of deflection summation under the f-;
The L-span (is not meant the span of hoisting crane, and is meant since the first two-section junction arch camber to second from the bottom section junction arch camber end.);
The X-variable parameter;
The camber calculated example: the calculating of 300t*85m Gantry Crane camber (the arch camber span L=80000mm)
As calculated f1=300mm, f2=100mm, f 3 = 1 1000 * 80000 = 80 mm
∑f=f1+f2+f3=480mm
Figure BSA00000463504700034
Figure BSA00000463504700035
That is: during X=1, Y1=0.3*79*1=23.7
During X=2, Y1=0.3*78*2=46.8
During X=3, Y1=0.3*77*3=69.3
During X=39, Y 1=0.3*41*39=479.7
During X=40, Y1=0.3*40*40=480
Above-mentioned data are formed camber table and diagram of curves.
According to traffic condition whole girder 1 is carried out the segmentation manufacturing, each segmentation beam 2 moulding is straight line cambers, be one up big and down small trapezoidal, four limits are straight line, have reduced the difficulty of making the curve camber.。
Promptly can obtain the camber of each segmentation beam according to the block plan of making, according to the camber that obtains each segmentation beam 2 be made then.
Make according to camber curve simultaneously and always close up moulding bed, each segmentation beam 2 is lifted on the moulding bed, carry out the welding of single-sided welding double-faced forming to closing up girth welding, the moulding bed in the middle of removing after welding is finished is tested to camber.
Girder 1 is made of a plurality of segmentation beam 2 amalgamations, always is assembled in on-the-spot disposable finishing by segmentation transportation, strong assurance the camber of girder, reduced cost of transportation and directly improved construction speed.

Claims (1)

1. large-sized gantry crane main beam structure, it is characterized in that: described girder is made of a plurality of segmentation beams, each segmentation beam all has the camber that calculates according to the camber formula, and its upper surface and lower surface formed smooth respectively and have the curve of camber when all segmentation beams were combined together to form girder.
CN2011200904686U 2011-03-31 2011-03-31 Large-scale portal crane girder structure Expired - Fee Related CN201961969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200904686U CN201961969U (en) 2011-03-31 2011-03-31 Large-scale portal crane girder structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200904686U CN201961969U (en) 2011-03-31 2011-03-31 Large-scale portal crane girder structure

Publications (1)

Publication Number Publication Date
CN201961969U true CN201961969U (en) 2011-09-07

Family

ID=44524503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200904686U Expired - Fee Related CN201961969U (en) 2011-03-31 2011-03-31 Large-scale portal crane girder structure

Country Status (1)

Country Link
CN (1) CN201961969U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112605544A (en) * 2020-12-28 2021-04-06 上海振华重工(集团)股份有限公司南通分公司 Tire crane portal frame sectional shipping and on-site butt joint process
CN113789698A (en) * 2021-09-17 2021-12-14 上海建工五建集团有限公司 High-altitude pouring formwork system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112605544A (en) * 2020-12-28 2021-04-06 上海振华重工(集团)股份有限公司南通分公司 Tire crane portal frame sectional shipping and on-site butt joint process
CN113789698A (en) * 2021-09-17 2021-12-14 上海建工五建集团有限公司 High-altitude pouring formwork system

Similar Documents

Publication Publication Date Title
CN205840311U (en) A kind of curved wall template system
CN204435638U (en) A kind of hollow laminated floor slab
CN201961969U (en) Large-scale portal crane girder structure
CN202380391U (en) Separation type intermediate crossbeam block structure for steel box girder
CN203200983U (en) Building dismounting-free formwork with concrete cast in place
CN204253048U (en) A kind of shield launching reaction frame for the engineering construction of shield structure
CN202479728U (en) Bed-jig device used in segmented manufacture of corrugated bulkhead
CN202467184U (en) Novel opposite-pull screw for reinforcing edge beam side form
CN202542697U (en) Truss type flexible leg of portal crane
CN202467136U (en) Auxiliary wood floor paving tool
CN206328946U (en) The assembled wall board structure of light composite material
CN205171382U (en) Hyperboloid case beam side combination structure support device
CN203188084U (en) In-field shoulder-stone-free secondary concrete road
CN104153386B (en) Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof
CN207017516U (en) The embedded laminated floor slab of T-steel
CN207553589U (en) A kind of unilateral steel form of shear wall
CN205399454U (en) Separate house L shape concrete foundation who pours with concrete trough
CN204938748U (en) A kind of crane girder inner supporting structure
CN105345215B (en) The technics of slot of standpipe
CN203834806U (en) H-shaped steel floor secondary beam with improved structure
CN201784636U (en) Trolley for dragging concrete precast slabs
CN202990117U (en) Connecting nodal point structure of concrete floor steel secondary beam and concrete frame beam
CN202125029U (en) Awning girder purline mechanism for awning
CN205298172U (en) High accuracy rectangle tooth splicing apparatus
CN207110451U (en) A kind of Concrete Double wall form structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: XIANGWANG ELEPHANT KING HEAVY INDUSTRY CO., LTD.

Free format text: FORMER NAME: JIANGSU ELEPHANT KING CRANE CO., LTD.

CP03 Change of name, title or address

Address after: 224700 Jiangsu Province, Yancheng City Economic Development Zone Pearl Jianhu Road No. 1

Patentee after: Elephant King Heavy Industries Co., Ltd.

Address before: 224751 Jianyang Jianhu County of Yancheng City province Jiangsu Road No. 8

Patentee before: Jiangsu Elephant King Crane Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee